Loading...
HomeMy WebLinkAboutManual S ReportDexter Diagnostics Manual S Compliance Report Whole House Fidel Maley Job: Date: 811125 By: Project Information For:628 Mel Rey Rd. 628 Mel Rey Rd., Glenwood Springs, CO 81601 Cooling Equipment Design Conditions Outdoor design DB: Outdoordesign WB: lndoor design DB: lndoor RH: 92.7"F 58.4"F 75.0'F 5004 Sensible gain: Latent gain: Totalgain: Estimated airflow: 15593 0 15593 0 Btuh Btuh Btuh cfm Entering milDB: Entering milWB: 75.6"F 61.5'F Manufacturer's Performance Data at Actual Design Conditions $ N Equipment type: Manufacturer: Actualairflow: Sensible capacity: Latent capacity: Totalcapacity: SplitASHP Mitsubishi Electric 947 cfrn 22720 Btuh 5680 Btuh 28400 Btuh Model: MXZ-3C30NA3**** 146ohof load 0% of load 182o/oof load SHR: 80% Heating Equipment Design Conditions Outdoor design DB: lndoor design DB: -2.0"F 70.0'F Heat loss:26196 Btuh \ .-\ aN Manufacturer's Performance Data at Actual Design Conditions Equipmenttype: SplitASHP Manufacturer: MitsubishiElectric Model: MXZ-3C30NA3****Actualairflow: 947 cfm Output capacity: 28600 Btuh 109% of load Supplemental heat required: 0 Btuh Meets all requirements ofACCA Manual S. Entering mil DB:68.4 Capacity balance: 12 "F Economic balance: -99 'F +l+ *"ightsoft' Right-SUte@ Uriversal 2025 25.0.01 RSU56586 2025-AW-01 17:31:21 Page 1,€/4CA ... Diagrcsticsu.S - Fidel\Fidel Man€l J_REVre Calc = MJ8 Front Door faces: N Load Multizone Summary Report Fidel Maley Job: DaE: 811125 By: lnfiltration Summary ZONENAME Bed 1 + Bath Main - t iving Bed 2 Entire House Volume ACI{AVF Cooling cfmft3 FIIM Btuh/ft2 o-2 0.2 27 08 1,0447 2OBB 0.2 0.2 Volume AVF ft"cfm Heating ACH }ITM Btuh/ft'z 0.25 0.22 o.25 11 3B 9 1.8 -L.U 1.8 27 08 1,0447 2088 0.1_3 0.11_ 0.13 6 I9 4 1,5243 0.23 5B 1.8 ]-5243 0.11 29 Load and AVF Summary RCNMNAME Bedroom l- Bath Bed 1 + Bath Bath Powder Living / xitchen Bedroom 1 Bedroom 2 Open to Below Living ,/ ttitchen Powder Open to Below Main - Living Bedroom 2 Bed 2 Entire House Area ft2 Htgload Btuh Clg load Btuh HtgAVF cfm 226 1,7 4 709 L74 t_84 42 42 aa 645 1,84 r74 43 645 22 43 34]-6 659 407 6 659 90 :-4639 34'1,6 2BB2 1,7 94 1,4639 90 1,7 94 1,6522 2882 2882 1084 374 1458 374 21, 1,'1,91,9 1084 12'1,2 1,07 7 r'1,91,9 21, r07 7 L567I 1,21,2 ]-468 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 110 9 23479 1,5'1,25 0 CIgAVF cfm 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 '1* x#:#:"T:,.-*;RigH-Sdte@ Uriversal 2025 25.0.O1 RSU56586 2025-A|{-01 17:31:21 Page 1A,ffi ... Diagrcsticsu.S - Fidel\Fidel Marual J_REVrtp Calc = MJ8 Fror{ Door taces: N Component Constructions Whole House FidelMaley Job: Date: 811125 By. Project Information For:628 Mel 628 Mel Rey Rey Glenwood Springs, CO 81601 Rd Rd Design Gonditions Location: Rifle Garfield CountyAP, CO, US Elevation: 6060 ftLatitude: 40"NOutdoor: Heating Dry bulb ("F) -2 Daily range ("F) Wet bulb ('F) Wind speed (mph) 15.0 Cooling 93v (H ) 5B 7.5 Indoor: lndoor temperature ('F) Design TD ("F) Relative humidity (%) Moisture difference (gr/b) lnfiltration: Method Shielding /stories Pressure /AVF Blowerdoor 3 (partial) / 1 50 Pa / 736 c'fm Heating 70 72 50 63.8 Cooling 75 1B 50 46.2 Construction descriptions Walls AGW - Frm wall, ud ext, '112"uood shth, r-21 cav ins, 5/8" gypsum boad int fnsh, 2't6"\ ood frm, 16" o.c. stud Partitions (none) Windows 0.30 u-value, 0.40 SHGC: 0.30 u-value, 0.40 SHGC; NFRC rated n (SHGC=0.40); 50% blinds 45", medium; 1.25 ft overhang (5 ft window ht, n 5 ft sep.); 6.67 ft head ht a1 0.30 u-value, 0.40 SHGC: 0.30 u-value, 0.40 SHGC; NFRC rated n (SHGC=0.40); 50% blinds 45", medium; 1.25 ft overhang (5 ft window ht, 8.25 ft sep.); 6.67 ft head ht 0.30 u-value, 0.40 SHGC: 0.30 u-value, 0.40 SHGC; NFRC rated e (SHGC=0.40); 50% blinds 45", medium; 1.25 ft overhang (1.5 ft window ht, 4.8 ft sep.); 6.67 ft head ht 0.30 u-value, 0.40 SHGC: 0.30 u-value, 0.40 SHGC; NFRC nated s (SHGC=0.40); 50% blinds 45", medium; 1 .25 ft overhang (10 ft window ht, 2.3 ft sep.); 6.67 ft head ht 0.30 u-value, 0.40 SHGC: 0.30 u-value, 0.40 SHGC; NFRC rated s (SHGC=0.40); 50% blinds 45', medium; 6 ft overhang (10 ft window ht, 1 ft sep.); 6.67 ft head ht 0.30 u-value, 0.40 SHGC: 0.30 u-value, 0.40 SHGC; NFRC rated s (SHGC=0.40); 50% blinds 45', medium; 6 ft overhang (2.75 ft window ht, 1 ft sep.); 6.67 ft head ht 0.30 u-value, 0.40 SHGC: 0.30 u-value, 0.40 SHGC; NFRC rated s (SHGC=0.40); 50% blinds 45", medium; 1.25 ft overhang (4 ft window ht, 3 ft sep.); 6.67 ft head ht 0.30 u-value, 0.40 SHGC: 0.30 u-value, 0.40 SHGC; NFRC rated w (SHGC=O.a0); 50% blinds 45', medium; 1 .25 ft overhang (10.5 ft window ht, 5.5 ft sep.); 6.67 ft head ht 2',t.0 21.0 21.0 21.0 21.0 4.68 4.68 4.68 4.68 4.68 339 252 351 245 1187 Or Area U-value ff'z Btuh/ffrF 0.065 0.065 0.065 0.065 0.065 6 0.300 40 0.300 73 0.300 9 0.300 12 0.300 lnsul R fte'FlBtuh H€ HTM Btuhft'?Btuh Btulvff Btuh Loss Clg HTM Gain 467 348 484 338 638 n e s W all 2188 '1630 2267 1 580 7665 0.72 0.72 0.72 0.72 0.72 15 15 30 1B 0.300 0.300 0.300 0.300 21 .6 21.6 21.6 21.6 315 324 639 378 10.6 10.6 10.6 10.6 0 0 0 0 154 159 313 185 0 21 .6 122 34.8 196 21.6 864 16.7 667 21.6 't584 10.6 776 0 0 0 2'l .6 198 10.6 97 21.6 1682 34.8 2708 21 .6 259 16.9 203 0 0 ,s,ffi ... Diagrpsticsu.S - Fidel\Fidel ManEl J_REVrtp Calc = MJB Frort Door faces: N 78 0.300 i+H"ri.p."!:.*:--.-*-"Right-Sr-ite@ Uriversal 2025 25.0.01 RSU56586 2025-AW-01 17:31:21 Page 1 0.30 u-value, 0.40 SHGC - Slider + WindowAbove: 0.30 u-value, 0.40 SHGC - Slider + WindowAbove; NFRC rated (SHGC=0.40); 50% blinds 45', medium; 1.25 ft overhang (9.5 ft window ht, 5.5 ft sep.); 6.67 ft head ht Doors 11D0: Door, vld sc type Ceilings Ceiling - Rf/clg ceiling, asphalt shingles roof mat, frm mns, 5/8" gypsum board int fnsh, 10" thkns, r-50 ceil ins Vaulted Ceiling - Rf/clg ceiling, asphalt shingles roof mat, frm cons, 5/8" gypsum board int fnsh, 10" thkns, r-50 ceil ins Floors Floor over Garage R30: Floor over Garage - Part flool r€0 ins, frm flr, 10" thkns, 5/8" gypsum board int fnsh s 57 0.300 22 0.390 0.029 0.029 0.034 21 .6 1231 34.8 1982 0 28.1 606 8.72 188 464 645 1109 49.0 49.0 2.09 2.09 969 1347 0.52 0.52 240 334 56030.0 2.05 2278 0.51 d* wricrhtsoft'' ^",,"r,".:r*,,.,", Right-Sdte@Uriversal202525.0.01 RSU56586 ... DiagmsticsU.S - Fidel\Fidel Marual J_REVnp Calc = MJ8 Front Door faces: N 2025-Atq-01 17:31,'2'l Page2,g.m It,irl:ii i{,r' I !i;1i j ri|::tLi,ir:t:r r l{ r'' 1, r ,l i'I' t Project Summary Whole House Fidel Maley Job: By: DaE: 8l'1125 ect lnformationPro 628 Mel Rev Rd. 628 Mel Re!,R0., Glenwood Springs, CO 81601 For: Notes: Desi n lnformation Weather: Winter Design Conditions Rifle Garfield CountyAP, CO, US Summer Design Gonditions Outside db lnside db Design TD Ventilation Method Heating Summary Structure Ducts Central vent (SER=65% 60 cfn) Enerov recoverv Humidification' Pioino EquiPYment load lnfiltration Method Outside db 93 'F lnside db 75 'F Desiqn TD 18 'FDaily-range H Relative humidifu 50 o/o Moisture difiererice 46 gr/b Sensible Gooling Equipment Load Sizing -2'F70 'F 72 "F t"ititg 15243 0.23 58 "".litg 15243 0.11 29 15125 Btuh n 0.98 15234 Btuh 37 Btuh0 Btuh -754 Btuh 0 Btuh 15234 Btuh 1.6 ton MJ8 2M79 Bluh0 Btuh 1331 Eltuh 0 Btuh 1386 Btuh 26196 Btuh Structure Ducts Central vent (SER=50% 60 cftn) Enerov recoverv tslower Use manufacture/s data Rate/swino multiolier Equi pmenl sensible load Structure Ducts Central vent (LER=50% 60 cfT) Enerov recoverv Equiflirent lateht load Equipment Total Load (Sen+Lat) Req. total capacity at 0.80 SHR Latent Gooling Equipment Load Sizing 0 Btuh 467 Btuh 0 Btuh Shieldino /stories Pressure-/AVF Blowerdoor 3 (oartial) / 1 50 Pd/ 736 ehl Area (ff) Volume (ff) AirchangeVhour Equiv.AVF (cfm) Heating Equipment Summary Make Trade Cond CoilAHR|ref 212925521 Effciency Sensible molino Latentmoling - Total coolino Actual airfloYw Airflowfactor Static pressure Load sensible heat ratio Cooling Equipment Summary Mitsubishi Electric Mitsubishi Electric MXZ-3C30NA3**** Make MitsubishiElectricTrade MitsubishiElectricModel MXZ-3C30NA3****AHR|ref 212925521 Effciency Heatino inout Heatin! output Temoerature rise Actualairflow Airflowfactor Static pressure Soace thermostat C'apacity balance point = 12'F 9.3 HSPF2 28600 Btuh @47"F34 'F 947 drn 0.040 cftn/Btuh0 in H2O 10.6 EER2, 19 SEER2 22720 5680 28400 947 0.061 0 1.00 Btuh Btuh Btuh cfT cftn/Btuh in H2O Boliltalic values have been manually ovenidden Calculations approved byACCAto meet all requirements of Manual J 8th Ed. *y;lg,f-I-:--t-#"-Risht-sure@uriversat2ozsz5.o.o1Rsus6586 2025-Aw-01 17:31:21 Page 1,€.,m ... Diagrpsticsu.S - Fidel\Fidel Marual J_REVrp Calc = MJ8 Frort Door faces: N N Main Floor LL=114", SL=3/8" Len=24.0 LL=l14",SL=3/8" Len=51.0 Living / Kitchen LL=114",SL=3/8" Len=9.5 t- I I Open to Below Bedrcom 2 Bath itrrl Bedroom 1 Job #: Performed for: 628 Mel Rey Rd. 628 Mel Rey Rd. Glenwood Springs, CO 81 601 FidelMaley Scale: 1 :78 Page 1 RQhtSuite@ Universal 2025 25.0.01 RSU56586 2O25-Aug41 17:32.27 ...S - FdeltFdel Manual J_REVrup \b1-Ytr N Garage Garage Job#: Performed for: 628 Mel Rey Rd. 628 Mel Rey Rd. Glenwood Springs, CO 81 601 FidelMaley Scale: 1 :78 Page2 RiThtSuite@ Universal 2025 25.0.01 RSU56586 202SAug{1 17:32:27 .S - FdelFdel lt/lanualJ_REVrup