Loading...
HomeMy WebLinkAboutEngineer's OWTS Design PlanProposed Single-Family OWTS System Onsite Wastewater Treatment System Design 3-BR Single-Family Residence 146 Quicksilver Court Rifle, CO 81650 Parcel No. 217 7 -27 2-01-001 Prepared for: Clayton Homes Julyo 2025 Digitall! signed by Jeremy: Gilliam Date:2025.07.31 1 1 :1 3:57-06'00' Prepared by: 4 -Ngst Water E ry g i n ee ri n g € Environmental Consultin g Selvices 2516 Foresight circle #1, Grand Junction, Co 81505 Telephone: (970)241-7076 I.O SCOPE This report presents the findings of an On-Site Wastewater Treatment System (OWTS) design for a proposed three-bedroom (3-BR) single-family residence at 146 Quicksilver Court in Rifle, Colorado. The purpose of this report was to establish design criteria for a new OWTS system. The report includes an assessment of observed subsoil and groundwater conditions, percolation test results, and the design and construction parameters for the OWTS. The findings are based on data gathered from field percolation testing and engineering evaluation based on experience with similar site conditions. 2.0 DESIGN SUMMARY l. Encountered subsurface conditions in the test pits consisted of one foot of silty sandy clay topsoil underlain by sandy silt to the maximum depth explored of 8 feet below ground surface, with scattered gravels noted. (Appendix A for visual and tactile evaluation). Groundwater was not encountered at the time of observation to 8 feet below ground surface. 2. The percolation result at the elevation of infiltration was 11.5 minutes per inch. We determined from Table 10-1 of Garfield County's On-Site Wastewater Treatment System Regulation (Regulations) that the treatment area soil type is Type I and used "Long Term Acceptance Rate" (LTAR) :0.8 gallons per day per square foot. 3. The design system will utilize a new CDPHE approved 1,000 gallon septic tank, which will discharge effluent to four (4) new Quick 4 Plus Infiltrator trenches, each with nine (9) units, for a total minimum disturbed area of about 24 feet by 39 feet, including 4 feet separation distance between trenches and chamber end caps. 4. Design placement based on setbacks and comparison to minimum requirements, which must be confirmed prior to installation by the licensed installation contractor. 3.0 EXISTING SITE CONDITIONS The 1.13-acre parcel located at 146 Quicksilver Court was a barren lot with scattered infrastrucfure. In the vicinity of the new construction, the lot slopes down to the northeast at approximately lo/o. 4.0 PROPOSED SITE IMPROVEMENTS A proposed three-bedroom (3-BR) single-family residence is to be constructed. The structure will have no below grade/basement areas. If the proposed construction differs from what is described above, WestWater Engineering should be notified to re-evaluate the recommendations. The new 3-BR dwelling will be served by a new 1000-gallon septic tank (minimum) and atotal of 36 new Standard Plus Quick4 Infiltrator@ units configured in four (4) trenches, each with nine (9) Q4 Plus units for a minimum 24' x 39' footprint including 4 feet separation distance between trenches and chamber end caps (FigureB2). Page I 5.0 SOIL INVESTIGATION WestWater Engineering collected soil and percolation data on June26,2025, in accordance with the Regulations. The soil profile in the vicinity of the proposed Soil Treatment Area (STA) shows topsoil I foot below ground surface underlain by sandy silt to the maximum depth explored of 8 feet below ground surface. No groundwater was encountered at the time of observation (Appendix A). Percolation rates ranged from I 1.9 to I 1.2 minutes per inch (Appendix A). WestWater Engineering finds the average percolation rate of 11.5 minutes per inch to be most applicable. Based on the Garfield County, On-Site Wastewater Treatment System Regulations effective April20, 2023, Table 10-1, the soil type was determined as Soil Type l, Long Term Acceptance Rate (LTAR):0.8 gallons per day per square foot, which most nearly describes the condition for this site and proposed construction. 6.0 OWTS WASTEWA DESIGN FLOW Per guidelines, the occupancy is six (6) persons, tabulated as 2 people per bedroom for the first 3 bedrooms. The design flow is six (6) persons x 75 gallons per day per person : 450 gallons per day (per Table 6-1 of the Regulations). 7.0 OWTS DESIGN Septic Tank The minimum septic tank capacity required to service a total of three (3) bedrooms is 1,000 gallons in accordance with Table 9-1 of the Regulations. The minimum required septic tank volume will provide a 48-hour (2-day) particle detention time for the wastewater flow capacity of the proposed OWTS. The required capacity of 1,000 gallons exceeds the estimated daily wastewater flow of 450 gallons per day (GPD) over a two-day period (450 GPD x 2 days:900 gallons), ensuring compliance with the Regulations. The tank shall be equipped with locking or secured access lids to prevent unintended access, as well as an effluent screen (or filter) at the tank outlet. Furthermore, the proposed 1,00O-gallon septic tank for the OWTS shall be selected from the current Colorado Department of Public Health and Environment (CDPHE) approved septic tank list. Distribution Box For this design, use a new distribution box (D-box) approved for use in Garfield County. Ensure that the flow is equal between laterals by using flow equalizers in the D-box, and access is available for maintenance and inspection via an approved riser assembly with a locking lid. Sbil Treatment Area (STA) Sandy silt occurring at the 4.O-foot depth interval will be used for the upper infiltrative surface for the proposed STA (Figure B3). Maximum trench depth must not exceed 4 feet in accordance Page 2 with the Regulations. Trench excavation will remove approximately 4.0 feet of soil and upper root mass to prepare the level surface for installing infiltrators on the receiving soil infiltrative surface, providing secondary treatment of discharged wastewater. Soil should not be wet at the time of excavation. Soil covering the STA must be crowned over proposed trenches or match the existing grade so water runs off and is not ponded over any area of the STA. Prior to backfilling the final soil cover, a pervious soil barrier of non-woven geotextile fabric (2 ozlyd2 minimum) or similar pervious material shall be installed over the STA to prohibit soil intrusion (See Figure 83 - OWTS Cross Section). All setback distances in accordance with the Regulations are applicable to septic system installation. The following design calculations propose to discharge septic tank effluent to four (a) Quick4 Plus Infiltrator trenches, each with nine (9) units, for a total minimum disturbed area of about24 feet by 39 feet, including 4 feet separation distance between trenches and chamber end caps. A total of 36 Quick 4 Standard Plus Infiltrator units will be installed in the four-trench configuration, which is generally oriented south to north. It should be noted that other manufacturers of infiltrators can be used, but the use of alternative system components will require verification by the Engineer to determine conformance with design requirements for this system. Destan Flow STA = Lf AR x Method x Media (1) Where: STA: Design Flow: LTAR: Method: Media: Total surface area required to effectively discharge sewage effluent Estimated volume of wastewater per day Long-Term Acceptance Rate of soil treatment area Method of effluent application and type of soil treatment area Type of distribution media STA Total Chambers = cham The County and State approved bottom chamber area for Quick 4 Plus Standard Infiltrator tJnit, 12 ft2 (2) Where: Chamber Area: Page 3 If, Per Regulations Table 6-1, Design Flow : 450 Gallons/Day Long Term Acceptance Rate (LTAR) review of Regulations Table l0-1, LTAR : 0.8 Gallo nslDay lF oot2 The type of application for this system is a gravity-fed trench system, per Regulations Table l0-) Method: 1.0 Distribution media is chosen as chambers, per Regulation Table l0-3, Media:0.7 Then, The minimum STA Area is 393.8 ft2. 450STA= 03 rL.0 x0.7 393.8Total Chambers =n (1) (2) The minimum number of Quick 4 Plus Infiltrators is 32.8. As 32.8 Infiltrators cannot be evenly divided between four trenches to ensure equal effluent flow, the design increases the number of Quick 4 Plus Infiltrators to a total of 36, divided between four trenches with nine (9) units each. 8.0 SYSTEMINSTALLATIONREOUIREMENTS The installer should confirm the feasibility of gravity discharge of sewage effluent from the proposed residence to the STA. If field measurements do not confirm the design assumptions for gravity discharge of sewage effluent from the proposed residence to the STA, or if the installer does not consider the above design assumptions practical, please contact the design engineer to address any design modifications necessary for the effective operation of the OWTS. The installer must also confirm all setbacks from property lines, building envelopes, and existing easements are maintained. Additionally, any unknown utility lines, easements, or other adverse conditions disclosed during construction must maintain at the required minimum setbacks. All sewer pipe couplings must be completed with primed and glued or bell and spigot joints using 4-inch SDR 35 PVC pipe. Schedule 40 PVC 4-inch pipe with a minimum l-foot soil cover must be used if pipe is installed in a vehicular traffic crossing. Drain-waste-vent (DWV) rated Page 4 Schedule 40 PVC pipe is called out for crossings but may also be used instead of SDR 35 PVC pipe. One water line is proposed from the south face of the proposed single-family dwelling to the existing water cistem. Per the Regulations, the septic tank must be setback a minimum of 50 feet from the water cistern and all STA components must be setback a minimum of 100 feet from the water cistern. Building sewer pipe must be installed at a slope between ls-inch and %-inch per foot slope (l to 2Yo), preferably using the %-inch per foot slope as recommended by the International Plumbing Code (IPC) as administered by the County. Fittings shall be sweep 90-degree curves or two (2) 45-degree elbows at all influent pipe turns. Fittings must be DWV for schedule 40 PVC pipe. Two-way clean-outs are required between dwelling and tank and beyond tank where pipe lengths exceed 100-feet from tank to STA and at all pipe bends greater than 45 degrees. Clean outs shall be installed with screw caps at finished grade with a protective housing for easy access by homeowner. The installer must adhere to the minimum and maximum depth requirements for the STA. System components must be placed on native soils or re-stabilized soils, as specified by the engineered OWTS reports, in excavated areas. The owner will ultimately be responsible for septic system maintenance including pumping the septic tank once every 2-3 years and cleaning the effluent filter every 6 months. 9.0 SYSTEM INSPECTION WestWater Engineering is responsible for inspecting the OWTS to ensure construction conforms to the design plan and meets all aspects of County Regulations, including: o Inspect and measure the system before backfilling, including piping and septic system components. Complete the as-built drawing of the system and submit it to Garfield County for approval. Reviewing and approving any submitted changes necessary for installation of the OWTS as deemed necessary by the owner or their contractor. Any system changes installed by the owner/contractor that were not approved by the Engineer are the responsibility of the owner. 1O.O DESIGNLIMITATIONS The OWTS design is based on site-specific soil conditions and percolation data collected in the vicinity of the proposed STA, as well as local experience in designing OWTSs in Colorado. The design is only valid for the proposed new OWTS serving the proposed 3-BR dwelling at the referenced location provided in this report. WestWater Engineering assumes no liability for inaccurate information or conditions that vary from the design assumptions listed above. Additionally, WestWater Engineering is not responsible for the quality of work for any person(s) or entity performing or supporting construction activities relating to the project, or for any Page 5 a a contractor's failure to furnish or perform its work in accordance with the plans, specifications or the Regulations. The owner/contractor is to notiff WestWater Engineering and/or Garfield County immediately if actual site conditions differ from those described herein. Please do not hesitate to contact us if you have any questions regarding this report. Page 6 APPENDIX A SOILS AND PERCOLATION DATA QNest Water En g i neeri ng -€ Consulting Engineers & Scientists 2516 FORESIGHT CIRCLE, #1 GRAND JUNCTION, COLORADO 81505 (97O) 241-7076 - FAX (970) 241-7097 SOILS AND PERCOLATION REPORT Date July 16,2025 Consultant:Curtis Beckel, EIT WestWater Engineering 2516 Foresight Circle #1 Grand Junction, CO 81505 (970) 241-7076 Client: Clayton Homes Land Parcel: 146 Quicksilver Court, Rifle, CO 81650 2177-272-01-001 SECTION 1 _SOILS LOG Two test pits were evaluated at the empty 1. 13-acre parcel for an onsite wastewater treatment system (OWTS) that will serve a new proposed 3-BR single-family dwelling located at 146 Quicksilver Court, Rifle, Colorado. The first Test Pit (TP-l) was located approximately 90 south of the north property line and 17 feet east of the west property line (see Figure B1 of the Design Report). The second Test pit (Tp- 2) was located approximately 10 feet north 5 feet east of TP-l. The benched test pits were in general conformance with Figure Al with a maximum depth of 8 feet (96 inches) below ground surface. The visual description of the profile soils, with ASTM D 2488 "Standard Practice for Description and Identification of Soils (Visual-Manual Procedures)" used for guidance, is summarized below and in Table I - Log of Exploratory Test Pits. ASTM D 2488 identifies soils based on visual examination and manual tests. Table I - Log of Exploratory Test Pit 1 146 Quicksilver Court Rifle, Colorado Test Pit 1 Location: See Figure B-l Date:6-26-25 Depth (f0 Description Interval (f0 Notes 0 Stiff, dry, white, brown and tan,low plasticity, silty sandy CLAY 0-l Topsoil Stiff, dry, white and tan, low plasticity, sandy SILT Total Depth: 8 feet below ground surface 1-8 Scattered Gravels Noted 5 146 Quicksilver Court Rifle, Colorado Test Pit 2 Location: See Figure B-1 Date:6-26-25 Depth (f0 Description Interval (f0 Notes 0 Stiff, dry, white, brown and tan, low plasticity, silty sandy CLAY 0-1 Topsoil Stifi dry, white andtan,low plasticity, sandy SILT Total Depth :4 feet below ground surface 1-4 Scattered Gravels Noted 4 Table I - Log of Exploratory Test Pit 2 Subsurface conditions encountered in the test pits consisted of one foot of silty sandy clay topsoil underlain by sandy silt to the maximum depth explored of 8 feet below ground surface, with scattered gravels noted. The silty sandy clay topsoil was stiff, dry, white, brown and tan. The sandy silt was stiff, dry, white and tan. No groundwater was encountered at the time of observation. SECTION 2 _ PERCOLATION TEST Three standard percolation rate tests were performed at the site referenced. TP-l contained 3 percolation test holes, approximately 1 foot in depth each, herein referred to as P-I,P-2 and P-3. P-1 was located in TP-l at ground surface in silty, sandy clay topsoil. P-2 was located in TP-l at 2 feet below ground surface in sandy silt. P-3 was located in TP-l at 4 feet below ground surface in sandy silt. All percolation holes were saturated 24 hours before testing. The percolation rates encountered were 1 1.9 minutes per inch in the silty, sandy clay topsoil at the ground surface, I 1.4 minutes per inch in the sandy silt at 2 feet below ground surface, and 11.2 minutes per inch in the sandy silt at 4 feet below ground surface. WestWater Engineering finds the average percolation rate of 11.5 most nearly describes the behavior of the soils at the expected infiltration elevation of 3 feet below ground surface. PERCOLATION TEST RESULTS 146 Quicksilver Court, Rifle SATURATION AND PREPARATION DATE: 6-25-25 PERCOLATION TEST DATE: 6-26-25 HOLE REFERENCE NO: P-l PERC HOLE DEPTH: Surface TIME INTERVALS: 10 minutes AVERAGE PERCOLATTON RATE (MIN/rNCH)tt.9 TIME AT START OF INTERVAL START OF INTERVAL (rNCH) END OF INTERVAL (rNCrr) WATER DEPTH CHANGE (INCH) PERCOLATION RATE (MrN/rNCH) 1030 0 1 I 10 1040 1 2 I 10 10s0 2 J 1 10 I 100 J 3.75 0.75 13.33 1110 3.75 4.7s 1 l0 II2O 4.75 5.75 I 10 I 130 0 0.75 0.75 13.33 tr40 0.75 1.5 0.75 13.33 I ts0 1.5 2.2s 0.75 13.33 1200 2.25 aJ 0.7s 13.33 t2t0 J 3.75 0.75 13.33 1220 3.75 4.5 0.75 13.33 HOLE REFERENCE NO: P-2 PERC HOLE DEPTH: 2 feet TIME INTERVALS: l0 minutes HOLE REFERENCE NO: P-3 PERC HOLE DEPTH: 4 feet TIME INTERVALS: 10 minutes AVERAGE PERCOLATION RATE (MIN/INCH)tl.4 TIME AT START OF INTERVAL START OF INTERVAL (rNCH) END OF INTERVAL (rNCH) WATER DEPTH CHANGE (INCH) PERCOLATION RATE (MrN/rNCH) 1030 0 1 I t0 1040 I 2 1 10 I 050 2 J I t0 1 100 J 4 1 10 1110 4 5 I 10 lt20 5 6 1 l0 I 130 0 1 I 10 1140 I 1.75 0.75 13.33 I 150 1.75 2.5 0.7s 13.33 1200 2.5 3.25 0.75 13.33 t2I0 3.25 4 0.75 13.33 1220 4 4.75 0.75 13.33 TIME AT START OF INTERVAL START OF INTERVAL (rNCH) END OF INTERVAL (rNcH) WATER DEPTH CHANGE (INCH) PERCOLATION RATE (MrN/rNCH) 1030 0 t.2s t.25 8 1040 1.2s 2.5 t.2s 8 1050 2.5 3.75 l.2s 8 I 100 3.75 4.75 1 l0 1110 4.75 s.75 1 10 tl20 5.75 6.75 1 10 I 130 0 0.75 0.75 13.33 lt40 0.75 1.5 0.75 13.33 I 150 1.5 2.2s 0.75 t3.33 1200 2.25 J 0.75 13.33 l2I0 J 3.75 0.75 13.33 1220 3.75 4.5 0.7s 13.33 AVERAGE PERCOLATION RATE (MIN/INCH)ll.2 PERCOLATION TEST PIT FIGURE 1 WestWoter Engineering 2516 Foresight Circle, fl Grond Junction, C0 81505 (s70) 241-7076 fI = SOILS AND PERCOLATION TEST PIT SCHEMATIC Profile View EXISTING GROUND SURFACE HOLESURF 15'-----*1 15' 8' Plon Mew o Cylindricol Percolotion Test Holes 4-8" Diometer 1-Foot Deep ou + 7 ___r t 1 5 15' P lotio Test P it Plon ew&c ross Sec tion o o Scole 1"=10' APPENDIX B FIGURES \ n\nhstVl/lter 2Engineering 2516 Foresight Circle, #l Grand Junction, CO 81505 (970) 241-7076 www.westwaterco.com goo,'/ EXISTING IPAVED SITE ACCESS 7 \ 4 l EXISTING DIRT SITE ACCESS ) APPROXIMATE LOCATION oF lESr Prr 2 (rP. 2) APPROXIMATE LOCATION OF TEST PIT 1 (TP-1) CONTAINING PERCOI-ATION HOLES 1, 2, AND 3 (P-1, P-2, AND P-3) -/-uuo ^-' \ /\ ----U---- APPROXIMATE LOCATION OF EXISTING ELECTRICAL SERVICE $ s\BEISNER, STEUE & TAMU 146 QUICKSTLVER COURT' 2(77-272-01-OOt APPROXIMATE LOCATION OF' EXISTING WATER CISTERN \APPROXIMATE EXISTING PROPERTY LINE - 17.3 ACRES (een CARFIELD COTIJNTY cIS, JULY 2025) 200 100 0 SCALE: 1":2OO' 200 FIGURE 81 146 OUICKSILVER CT DOSTING OWTS SITE PLAN = A\ilestVJhtet 2Engineering 2516 Foresight Circle, #l Grand Junction, CO 8l 505 (970\ 24t-7o'.t6 www.westwate rco.com APPROXIMATE EXISTING PROPERTY LINE - 17.3 AqRES (PER GARFIELD COUNTY GIS, JULY 2025) FUTYR s nY bt EXISTING PAVED. SITE ACCESS E STA REPAIR AREA, 24'x39' NEW INFILTRATOR TRENCHES, 4 TRENCHES 9 UNITS EACH, 36 TOTAL CHAMBER UNITS, covER W/GEoTEXTTLE FABRIC 6' MIN(sEE FrcuRE 83) IN EXISTING DIRT SITE ACCESS NEW DISTRIBUTION BOX U/FLOW C9NTROL PROPOSED NEW 1,OOO NEW 4,, SDR 35 PVC SEWER SERVICE (L:7e.4 L.F.t,S=2%) GALLON SEPTIC TANK 5, MIN PROPOSED 3_BR APPROXIMATE LOCATION OF TP_2DWELLING APPROXIMATE LOCATION OF TP_1 PROPOSED WATER SERVICE NEW 2_WAY CLEANOUT APPROXIMATE LOCATION OF EXISTING ELECTRICAL SERVICE 1OO, MIN SFTBACK FROM CISTERN TO STA 50, MIN SIIBACK FROM CISTERN TO SEPTIC TANK APPROXIMATE LOCATION OF EXISTING WATER CISTERN 60300 SCALE: 1":60' 60 FIGURE 82 146 QUICKSILVER COURT PROPOSED OTVTS I.AY-OUT FIGURE 83 146 OUICKSILVER COURT OWTS CROSS SECTION Arfihstlfl/'htnr 2Engineering 25 I 6 Foresight Circle, #l Grand Junction, CO 8 I 505 (970) 24t-7076 www.westwaterco.com PORT WITH CAP APPROXIMATE EXISTING NEW 4'SCH 40 PVC OBSERVATION NEW 10" ROUND IRRIGATION VALVE BOX AT FACH PORT MOUNTED FLUSH WITH GROUN 8.0' Y GROUNDWATER GREATER THAN 8.0' PLACE GEOTEXTTLE (2 OZ/yf) Ovrn TNFTLTRATORS (ryp) CROWN BACKFILL OVER TRENCHES o + o @ TRENCH NOTE: MAXIMUM DEPTH 4.0 FETT MINIMUM DEPTH 3.0 FEET INSTALI.ATION NOTES: 1) FOLLOW MANUFACTURERS INSTRUCTION www.infittrotorsystems.com2) SCREW pIpE TOp PORT CHAMBER FACEP|-ATE3) SCREW FACEPI-ATES AND UNITS TOGEIHER4) INSTALL MONITORING PORTS TRENCH ENDS ALL FOUR BED CORNERS 36 Q4 INFILTRATORS (4) TRENCHES (s) uruns EAcH TRENcH PROVIDE LEVEL SCARIFIED SURFACE ACROSS LENGTH OF TRENCH(S), NOTIFy ENGTNEER rF TRENCH BOTTOM(S) ARE WEr SCALE 1"=5' 4.O'4.0'4.O' TOPSOIL FJ a Oz a FIGURE 84 146 OUICKSILVER COURT 1,000 GALLON SEffiC TAl.tK A\lrhstUf|iltprr 2Engineering 2516 Foresight Circle, #1 Grand Juction, CO 81505 (970) 24r-7076 ww.westwaterco.com NW,l 24"A ACCESS HATCHES WITH LOCK SECURE TANK LIDS rNG/ FINISHED GRADE NATIVE BACKFILL COMPATEDro 95% MSHTO r-99 +.2% OPTIMUM SOIL MOISTURE oRENCO (On EOUWALENT) 4" EFFLUENT FILTER GMVITYFLowFRoMDWELLING+ NEW 4" SCH 40 PVC SEWER LINE (L:70.4'*, S:-Z%) TO STA NEW 4,' SCH 40 PVC SEWER LINE DISTRIBUTION BOX NEW 4" SCH 40 PVC WYE^EE NEW 1,OOO GALLON SEPTIC TANK NEW 7+" MINUS WASHED RocK z 4 x + HWL 4,AFF ?e N N lf) (8" rNCH DEPTH MTNIMUM) APPENDIX C GARFIELD COUNTY ON-SITE WASTE WATER TREATMENT SYSTEM REGULATIONS, TABLE 7-1 FROM THE 2OI9 REGULATION DOCUMENT CODE OF COLORADO REGULATION Water Quality Control Commission 5 CCR 1002-43 Table 7-1 Minimum Horizontal Distances in Feet Between Components of an On-Site Wastewater Treatment System Installed After November 1 1973 and Water and Health Features 5 5 5 Septic Tank, Higher level treatment Unit, Dosing Tank, Vault or Privy 102 25 10 10 Dry Gulch, Cut Bank, Fiil Area (from Crest) 10 25 25 50 502 503 Lake, Water Course, lrrigation Ditch, Stream, Wetland 25 10 10 10 102 Subsurface Drain, lntermittent lrrigation Lateral, Drywell, Stormwater Structure 102 10 10 01 Property Lines, Piped or Lined lrrigation Ditch, upslope curtain drain 10 0 10 10 15 5 Structure without basement, crawl space or footing drains 5 0 20 15 15 Structure w/basement, crawl space or footing drains 56 252 102 102 Potable Water Supply Line 2 102 502 100 3 60 60 Spring, Well,1 Suction Line, Potable Water Supply Cisterna 502Septic Tank, Higher Level Treatment Unit, Dosing Tank, Vault or Vault Priw Building Sewer or Effluent Lines STA Trench, STA Bed, Unlined Sand Filter, Sub- surface Dispersal System, Seepage Pit Lined Sand Filter Lined Evapo- transpiration Field or Outside of Berm of Lined Wastewater Pond 43 FIG. C-1 Septic Tank, Higher level treatment Unit, Dosing Tank, Vault or Privy 1 0 N/A 10 Dry Gulch, Cut Bank, Fiil Area (from Crest) 15 25 10 Lake, Water Course, lrrigation Ditch, Stream, Wetland 25 100 253 Subsurface Drain, lntermittent lrrigation Lateral, Drywell, Stormwater Structure 25 25 0 Property Lines, Piped or Lined lrrigation Ditch, upslope curtain drain 10 25 1 0 Structure without basement, crawl space or footing drains 15 25 125s Structure w/basement, crawl space or footing drains 15 25 125 Potable Water Supply Line 2 252 502 102 Spring, Well,l Suction Line, Potable Water Supply Cisterna 100 100 100 3 Unlined Sand Filter in SoilWith a Percolation Rate Slower than 60 Minutes per lnch, Unlined or Partially Lined Evapotrans- piration System, Outside of Berm of Unlined Wastewater Pond, or System Not Relying on STA for Treatment Other than Aerosol Slit Trench Latrine, Pit Priw System Not Relying on STA for Dispersal CODE OF COLORADO REGULATION 5 CCR 1002-43 Water Quality Control Commission NOTE: The minimum distances shown above must be maintained between the OWTS components and the features described. Where soil, geological or other conditions warrant, or upgrading of existing OWTS where the size of lot precludes adherence to these diitances, a repaired OWTS must not be closer to setback features ihan the "*iiting OWTS, asreviewed and approved by the local public health agency. Components that are not watertight should not extend into areas of the root system of nearby trees. 1 lncludes potable wells, irrigation wells and monitoring wells set within a potable aquifer and infiltration galleries permifted as wells by the Division of Water Resources. 4 FtG. C-2 CODE OF COLORADO REGIILATION Water Quality Control Commission 5 CCR 1002-43 2 Crossings or encroachments may be permifted at the points as noted above provided that the water or wastewater conveyance pipe is encased for the minimum setbackdistance on each side of the crossing. A length of pipe with a minimum Schedule 40 rating [ASTM Standard D 3034-16 (2016 version)] of sufiicient diameter to easily slide over andcompletely encase the conveyance must be used. Rigid end caps of at least schedule +o'riting [ASTM standard D 3034-1 6 (2016 version) must be glued or secured in a watertight the bottom of the encasement pipe. The area in which the pipe passes through the end caps must be sealed with an approved underground sealant compatible with the piping used.Other methods of encasement that provide equal protection are allowed. Thdse methods must be reviewed and approved by the local public health agency. 3 Add eight feet additional distance for each 100 g-allons per day of design flows between 1 ,000 and 2,000 gallons per day, unless it can be demonstrated by a professional required to minimize contamination as part of the Division site ipplication and permitting procl"s. 4 All horizontal setbacks to- a potable water supply cistem must be met unless a variance by the Board of Examiners of Water Well construction and pump lnstallation 1 1 '4 of the Water Well Construction Rules, as applicable. The minimum horizontal setback that may be jranted througn a variance is to 25 feet. 5 lf the structure is not used as a habitable unit, the isolation may be reduced by the local board of health to no less than S0 feet. 6. Building sewer installations shall meet the design requirements of the Colorado plumbing Code. 45 FrG. C-3