HomeMy WebLinkAboutConditions of PermitCONDITION S OF PERMIT
BLRE-07 -25-9348
BEN & ERICA COON
New Single-family dwelling w/ attached garage
TBD Rapids View Ln, New Castle
Rapids on the Colorado, Lot 3 - 21 B1 04307003
1 ) ALL WORK SHALL COMpLy W|TH THE 2015 TNTERNATTONAL RESTDENTTAL CODE (l.R.C.) AND 2018
I NTERNATIONAL ENERGY CONSERVATION CODE ( I.E.C,C.)
2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE
ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON
PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
3) ELECTRTCAL PERMtTTtNG AND TNSPECTTONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL
ROUGH.IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS
REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.
4) ALL EXTERIOR LIGHTING TO BE DOWNCAST AND SHIELDED.
5) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND
DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE
DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNIry DEVELOPMENT WEBSITE FOR
ADDITIONAL I N FORMATION.
6) OPEN HOLE SOTLS REPORT rS REOUTRED AT FOOTTNG TNSPECTTON AND PRIOR TO ANY CONCRETE
POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR.
1,500 PSF soil bearing.
7) PRE-ENGINEERED ROOF TRUSSES. HAVE ENGINEERTNG FOR BUTLDING INSPECTOR AT TIME OF
FRAME INSPECTION.
8) CAREFUL: MUST NOT REMOVE VEGETATION FROM 35 FT RIPARIAN ZONE - MEASURES FOR HIGH
WATER MARK OF COLORADO RIVER.
9) ANY CONSTRUCTION ACTIVITY THAT CHANGES THE BASIC CHARACTER OR TOPOGRAPHY OF THE
NATURAL LAND LOCATED IN THE 1OO-YEAR FLOODPLAIN MUST FIRST OBTAIN A'FLOODPLAIN
DEVELOPMENT PERMIT' THROUGH GARFIELD COUNry'S PLANNING DEPT.
10) AN ELEVATTON SURVEY, SEALED BY A COLORADO PROFESSTONAL LICENSED SURVEYOR, lS
REOUIRED AT FRAME INSPECTION TO VERIFY THAT AS.BUILT ROOFS COMPLY WITH GARFIELD
COUNry'S 25-FOOT BUILDING HEIGHT LIMIT AS DEFINED IN THE LAND USE DEVELOPMENT CODE.
BUILDING HEIGHT CALCULATION GUIDE ATTACHED TO FIELD COPY FOR PROJECT TEAM
REFERENCE.
1 1) SEPTIC SYSTEM REVIEW / APPROVALS: PRIOR TO BUILDING INSPECTION & CERTIFICATE OF
OCCUPANCY PROVIDE FINAL APPROVAL/SIGN-OFF FROM GARFIELD COUNTY'S PUBLIC HEALTH
DEPT.
12) BLOWERDOORTESTTSREOUTRED. MUSTSUBMTTBLOWERDOORTESTREPORTTOGARFIELD
COUNTY COMMUNITY DEVELOPMENT DEPT. OFFICE PRIOR TO SCHEDULING FINAL BUILDING
INSPECTION / C.O. FINAL,
13) PRESCRIPTIVE PATH USING ATTACHED RESCHECK REPORT HAS BEEN CHOSEN FOR ENERGY
COMPLIANCE OF THIS HOME DESIGN. MANUAL S REPORT ALSO ATTACHED FOR REFERENCE.
ALL NEW HOMES TO HAVE WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM INSTALLED (2015
IRC TABLE m1507.3.3('l)AND (2) SHOWN ON ,46.1 (TOTAL OF 4 BEDROOMS, 90 CFM).
$
N
$
N