Loading...
HomeMy WebLinkAboutEngineer's OWTS Design PlanProposed Onsite Wastewater Treatment System Design s-BR Single-Family Residence & 2-BR Accessory Dwelling Unit TBD Colorado River Road New Castle, CO 81647 Parcel No. 218L-072-03-009 Prepared for: Vanessa Evenden July, 2025 Prepared by: tegr:ng 2516 Foresight Circle #1, Grand Junction, CO 81505 Telephone: (970)241-7076 1.0 SCOPE This report presents the findings of an On-Site Wastewater Treatment System (OWTS) design for a proposed five-bedroom (5-BR) single-family residence and two-bedroom (2-BR) Accessory Dwelling Unit (ADU) at TBD Colorado River Road (Parcel No. 218l-072-03-009) in New Castle, Colorado. The purpose of this report was to establish design criteria for a new OWTS system. The report includes an assessment of observed subsoil and groundwater conditions, percolation test results, and the design and construction parameters for the OWTS. The findings are based on data gathered from field percolation testing and engineering evaluation based on experience with similar site conditions. 2.0 DESIGN SUMMARY 1. Encountered subsurface conditions in the test pits consisted of 1 foot of topsoil underlain by gravelly sand with cobbles (<35% rock) to the maximum depth explored of 8 feet below ground surface (Appendix A for visual and tactile evaluation). Groundwater was not encountered at the time of observation to 8 feet below ground surface. 2. The percolation result at the elevation of infiltration was 9.9 minutes per inch. We determined from Table 10-l of Garfield County's On-Site Wastewater Treatment System Regulation (Regulations) that the treatment area soil type is Type I and used "Long Term Acceptance Rate" (LTAR) :0.8 gallons per day per square foot. 3. The design system will utilize two new CDPHE approved septic tanks; one 1,500 gallon tank servicing the 5-BR dwelling and one 1,000 gallon tank servicing the 2-BR ADU. Both tanks will jointly discharge effluent to four (4) new Quick 4 Plus Infiltrator trenches, each with seventeen (17) units, for a total minimum disturbed area of about24 feet by 7l feet, including 4 feet separation distance between trenches and chamber end caps. requirements, which must be confirmed prior to installation by the licensed installation contractor 3.0 EXISTING SITE CONDITIONS The 7.}9-acre parcel located at TBD Colorado River Road was a barren lot with an irrigation pond as well as a steep bluff which separated the buildable area of the lot from the adjacent Colorado River. In the vicinity of the new construction, the lot slope down to the northwest at approximately 2o/o. 4.0 PROPOSED SITE IMPROVEMENTS A proposed 5-BR single-family residence and 2-BR ADU are to be constructed. The structures will have no below grade/basement areas. If the proposed construction is different than what is described above, WestWater Engineering should be notified to re-evaluate the recommendations made herein. The new 5-BR dwelling will be served by a new 1,50O-gallon septic tank (minimum) while the 2-BR ADU will be served by a new 1,000-gallon septic tank (minimum). The structures will jointly discharge to a total of 68 new Standard Plus Quick4 Infiltrator@ units configured in four (4) trenches, eachwith seventeen (17) Q4 Plus units for a minimum 24' x7l' footprint including 4 feet separation distance between trenches and chamber end caps (Figure B2). 5.0 SOIL INVESTIGATION WestWater Engineering collected soil and percolation data on April22,2025,in accordance with the Regulations. The soil profile in the vicinity of the proposed Soil Treatment Area (STA) shows topsoil 1 foot below ground surface underlain by gravelly sand with cobbles to the maximum depth explored of 8 feet below ground surface. No groundwater was encountered at the time of observation (Appendix A). Percolation rates ranged from 11.1 to 8.7 minutes per inch (Appendix A). WestWater Engineering finds the average percolation rate of 9.9 minutes per inch to be most applicable. Based on the Garfield County, On-Site Wastewater Treatment System Regulations effective Apri120,2023, Table 10-1, the soil type was determined as Soil Type l, Long Term Acceptance Rate (LTAR) :0.8 gallons per day per square foot, which most nearly describes the condition for this site and proposed construction. 6.0 OWTS w DE,SIGN FLOW As per guidelines, the occupancy is twelve (12) persons, tabulated as 2 people per bedroom for the first 3 bedrooms of both structures and one additional person for every additional bedroom beyond the first three in each structure. The design flow is twelve (12) persons x 75 gallons per day per person : 900 gallons per day. 7.0 OWTS DESIGN Septic Tank The minimum septic tank capacity required to service a total of five (5) and two (2) bedrooms are 1,500 gallons and 1,000 gallons respectively in accordance with Table 9-l of the Regulations. The minimum required septic tank volumes will provide a 48-hour (2-day) particle detention time for the wastewater flow capacity of the proposed OWTS. The required capacities of 1,500 and 1,000 gallons individually exceed their respective estimated daily wastewater flow of 600 and 300 gallons per day (GPD) over a two-day period (600 GPD x 2 days :1,200 gallons. 300 GPD x 2 days: 600 gallons), ensuring compliance with the Regulations. The tanks shall be equipped with locking or secured access lids to prevent unintended access, as well as an effluent screen (or filter) at the tank outlets. Furthermore, the proposed septic tanks for the OWTS shall be selected from the current Colorado Department of Public Health and Environment (CDPHE) approved septic tank list. Page2 Distribution Box For this design, use a new distribution box (D-box) approved for use in Garfield County. Ensure that the flow is equal between laterals by using flow equalizers in the D-box, and access is available for maintenance and inspection via an approved riser assembly with a locking lid. Soil Treatment Area (STA) Gravelly sand occurring at the 4.0-foot depth interval will be used for the upper infiltrative surface for the proposed STA (Figure B3). Maximum trench depth must not exceed 4 feet in accordance with the Regulations. Trench excavation will remove approximately 4.0 feet of soil and upper root mass to prepare the level surface for installing infiltrators on the receiving soil infiltrative surface, providing secondary treatment of discharged wastewater. Soil should not be wet at the time of excavation. Soil covering the STA must be crowned over proposed trenches or match the existing grade so water runs off and is not ponded over any area of the STA. Prior to backfilling the final soil cover, a pervious soil barrier of non-woven geotextile fabric (2 ozlyd2 minimum) or similar pervious material shall be installed over the STA to prohibit soil intrusion (See Figure B3 - OWTS Cross Section). All setback distances per the Regulations apply to septic system installation. The following design calculations propose to discharge septic tank effluent to four (a) Quick4 Plus Infiltrator trenches, each with seventeen (17) units, for a total minimum disturbed area of about 24 feetby 7l feet, including 4 feet separation distance between trenches and chamber end caps. A total of 68 Quick 4 Standard Plus Infiltrator units will be installed in the four-trench configuration, which is generally oriented northeast and southwest. It should be noted that other manufacturers of infiltrators can be used, but the use of alternative system components will require verification by the Engineer to determine conformance with design requirements for this system. Desian FlowSTA: L.AR x Method x Media (1) Where: STA: Design Flow: LTAR: Method: Media: Total surface area required to effectively discharge sewage effluent Estimated volume of wastewater per day Long-Term Acceptance Rate of soil treatment area Method of effluent application and type of soil treatment area Type of distribution media Page 3 STATotalchambers: m.(2) Where: Chamber Area:The County and State approved bottom chamber area for Quick 4 Plus Standard Infiltrator lJnit,12 ff If, Per Regulations Table 6-1, 5-BR Flow: 600 Gallons/Day 2-BR Flow: 300 Gallons/Day Therefore, Design Flow : 900 Gallons/Day Long Term Acceptance Rate (LTAR) review of Regulations Table 10-1, LTAR : 0.8 Gallons/DaylFoot2 The type of application for this system is a gravity-fed trench system, per Regulations Table l0- ) Method: 1.0 Distribution media is chosen as chambers, per Regulation Table l0-3, Media:0.7 Then, 900STA= 0S "1.0 x0.7 The minimum STA Area is 757.5 ff. (1) (2)787.5Total Chambers :n The minimum number of Quick 4 Plus Infiltrators is 65.6. As 65.6Infiltrators cannot be evenly divided between four trenches to ensure equal effluent flow, the design increases the number of Quick 4 Plus Infiltrators to a total of 68, divided between four trenches with seventeen (17) units each. Page 4 8.0 SYSTEMINSTALLATIONREOUIREMENTS The installer should confirm the feasibility of gravity discharge of sewage effluent from the proposed residence to the STA. If field measurements do not confirm the design assumptions for gravity discharge of sewage effluent from the proposed residence to the STA, or if the installer does not consider the above design assumptions practical, please contact the design engineer to address any design modifications necessary for the effective operation of the OWTS. The installer must also confirm all setbacks from property lines, building envelopes, and existing easements are maintained. Additionally, any unknown utility lines, easements, or other adverse conditions disclosed during construction must maintain at the required minimum setbacks. All sewer pipe couplings must be completed with primed and glued or bell and spigot joints using 4-inch SDR 35 PVC pipe. Schedule 40 PVC 4-inch pipe with a minimum 1-foot soil cover must be used if pipe is installed in a vehicular traffic crossing. Drain-waste-vent (DWV) rated Schedule 40 PVC pipe is called out for crossings but may also be used instead of SDR 35 PVC pipe. Building sewer pipe must be installed at a slope between %-inch andl+-inch per foot slope (l to 2o/o), preferably using the %-inch per foot slope as recommended by the Intemational Plumbing Code (IPC) as administered by the County. Fittings shall be sweep 9O-degree curves or two (2) 45-degree elbows at all influent pipe turns. Fittings must be DWV for schedule 40 PVC pipe. Two-way clean-outs are required between dwelling and tank and beyond tank where pipe lengths exceed 100-feet from tank to STA and at all pipe bends greater than 45 degrees. Clean outs shall be installed with screw caps at finished grade with a protective housing for easy access by homeowner The installer must adhere to the minimum and maximum depth requirements for the STA. System components must be placed on native soils or re-stabilized soils, as specified by the engineered OWTS reports, in excavated areas. The owner will ultimately be responsible for septic system maintenance including pumping the septic tank once every 2-3 years and cleaning the effluent filter every 6 months. 9.0 SYSTEM INSPECTION WestWater Engineering is responsible for inspecting the OWTS to ensure construction conforms to the design plan and meets all aspects of County Regulations, including: o Inspect and measure the system before backfilling, including piping and septic system components. . Complete the as-built drawing of the system and submit it to Garfield County for approval. o Reviewing and approving any submitted changes necessary for installation of the OWTS as deemed necessary by the owner or their contractor. Any system changes installed by Page 5 the owner/contractor that were not approved by the Engineer are the responsibility of the owner. 1O.O DESIGNLIMITATIONS The OWTS design is based on site-specific soil conditions and percolation data collected in the vicinity of the proposed STA, as well as local experience in designing OWTSs in Colorado. The design is only valid for the proposed new OWTS serving the proposed 5-BR dwelling at the referenced location provided in this report. WestWater Engineering assumes no liability for inaccurate information or conditions that vary from the design assumptions listed above. Additionally, WestWater Engineering is not responsible for the quality of work for any person(s) or entity performing or supporting construction activities relating to the project, or for any contractor's failure to furnish or perform its work in accordance with the plans, specifications or the Regulations. The owner/contractor is to notiff WestWater Engineering and/or Garfield County immediately if actual site conditions differ from those described herein. Please do not hesitate to contact us if you have any questions regarding this report. Page 6 APPENDIX A SOIS AND PERCOLATION DATA Q\Nest Water En g i neering e consutting rngineers & Scientiits 251 6 FORESIGHT CIRCLE, #'I GRAND JUNCTION, COIORADO 8T5O5 t970l 241-7076 - FAX (97O) 241-7097 SOILS AND PERCOLATION REPORT Date:July 17,2025 Consultant:Curtis Beckel, EIT WestWater Engineering 2516 Foresight Circle #1 Grand Junction, CO 81505 (970) 24r-7076 Client:Vanessa Evenden Land Parcel: TBD Colorado River Road, New Castle, CO 81647 2l8t-072-03-009 SECTIONl-SOILSLOG Two test pits were evaluated at the empty 7.}9-acre parcel for an onsite wastewater treatment system (OWTS) that will serve a new proposed 5-BR single-family dwelling and new proposed 2-BR Accessory Dwelling Unit located at TBD Colorado River Road, New Castle, Colorado. The first Test Pit (TP-l) was located approximately 90 feet south of the north property line and l7 feet east of the west property line (see Figure B1 of the Design Report). The second Test Pit (TP-2) was located approximately south of the north property line and feet ease of the west property lie. The benched test pits were in general conformance with Figure A1 with a maximum depth of8 feet (96 inches) below ground surface. The visual description of the profile soils, with ASTM D 2488 "Standard Practice for Description and Identification of Soils (Visual-Manual Procedures)" used for guidance, is summarized below and in Table I - Log of Exploratory Test Pits. ASTM D 2488 identifies soils based on visual examination and manual tests. A1 Table L - Log of Exploratory Test Pit 1 TBD Colorado River Road New Castle, Colorado Test Pit I Location: See Figure B-1 Date:4-22-25 Depth (f0 Description Interval (f0 Notes 0 Stiff, dry, tan and grey, low plasticity, silty CLAY 0-1 Topsoil Dense, dry, grey and brown, gravelly SAND with cobble (Alluvium) Total Depth: 8 feet below ground surface 1-8 5 A2 TBD Colorado River Road New Castle, Colorado Test Pit 2 Location: See Figure B-1 Date:4-22-25 Depth (f0 Description Interval (f0 Notes 0 Stiff, dry, tan and grey, low plasticity, silty CLAY 0-l Topsoil Dense, dry, grey and brown, gravelly SAND with cobble (Alluvium) Total Depth : 8 feet below ground surface 1-8 5 Table 2 -Log of Exploratory Test Pit 2 Subsurface conditions encountered in the test pits consisted of one foot of silty clay topsoil underlain by gravelly sand to the maximum depth explored of 8 feet below ground surface. The silty clay topsoil was stiff, dry,tan and grey. The gravelly sand was dense, dry, grey and brown with maximum grain size nearing 3-inch (cobble) indicative of Alluvium deposit (<35% rock). No groundwater was encountered at the time of observation. A3 SECTION 2 _ PERCOLATION TEST Four standard percolation rate tests were performed at the site referenced. TP-l and TP-2 each contained 2 percolation test holes, approximately I foot in depth each, herein referred to as P-l thru P-4. P'l was located in TP-l at2 feet below ground surface gravelly sand. P-2 was located in TP-l at 4 feet below ground surface in gravelly sand. P-3 was located in TP-2 at2 feet below ground surface in gravelly sand. P-4 was located in TP-2 at 4 feet below ground surface in gravelly sand. All percolation holes were saturated 24 hours before testing. The percolation rates encountered ranged from to min/in. WestWater Engineering finds the average percolation rate of 9.2 most nearly describes the behavior of the soils at the expected infiltration elevation of 3 feet below ground surface. A4 PERCOLATION TEST RESULTS TBD Colorado River Road, New Castle SATURATION AND PREPARATION DATE: 4-21-25 PERCOLATION TEST DATE: 4-22-25 HOLE REFERENCE NO: P-l PERC HOLE DEPTH: 2feet TIME INTERVALS: l0 minutes AVERAGE PERCOLATION RATE (MIN/INCH)11.1 TIME AT START OF INTERVAL START OF INTERVAL (rNCrr) END OF INTERVAL (rNCrI) WATER DEPTH CHAi\GE (rNCrr) PERCOLATION RATE (MrN/rNCrI) 1 130 t0 0 1.5 1.5 I 140 10 1.5 2.75 t.25 1 150 10 2.75 4 1.25 t200 10 0 I I r2t0 10 I 2 I t220 10 2 J 1 t230 t0 J 3.75 0.75 1240 10 3.7s 4.5 0.75 1250 10 0 0.75 0.75 1300 10 0.75 1.5 0.75 13 10 l0 1.5 2,2s 0.75 1320 l0 2.25 J 0.7s A5 HOLE REFERENCE NO: P-2 PERC HOLE DEPTH: 4feet TIME INTERVALS: 10 minutes TIME AT START OF INTERVAL START OF INTERVAL (rNCrr) END OF INTERVAL (TNCII) WATER DEPTH CHANGE (rNCrr) PERCOLATION RATE (MrN/rNCH) 1 130 0 1.5 1.5 6.67 1140 1.5 J 1.5 6.67 1 150 J 4.2s 1.25 8 1200 4.25 5.25 1 10 I2IO 0 ,| 1 10 1220 1 2 1 10 r230 2 J I t0 t240 J 3.75 0.75 13.33 t250 3.75 4.5 0.75 13.33 1300 0 0.7s 0.75 13.33 13 10 0.75 1.5 0.75 13.33 r320 1.5 2.25 0.7s 13.33 AVERAGE PERCOLATTON RATE (MIN/INCH)10.7 A6 HOLE REFERENCE NO: P-3 PERC HOLE DEPTH: 2feet TIME INTERVALS: 10 minutes TIME AT START OF INTERVAL START OF INTERVAL (rNCrr) END OF INTERVAL (rNcrr) WATER DEPTH CHAIIGE (rNCH) PERCOLATION RATE (MrN/rNCH) 1 130 0 1.5 1.5 6.66 1140 1.5 J 1.5 6.66 I 1s0 4.25 1.2s 8 1200 4.2s 5.5 1.25 8 I2IO 5.5 6.75 1.25 8 1220 6.75 7.75 1 10 r230 0 I 1 10 1240 1 2 1 l0 1250 2 J I l0 1300 J 4 1 t0 13 10 4 5 I 10 t320 5 6 I t0 AVERAGE PERCOLATION RATE (MIN/INCH)8.9 A7 HOLE REFERENCE NO: P-4 PERC HOLE DEPTH: 4feet TIME INTERVALS: 10 minutes TIME AT START OF INTERVAL START OF INTERVAL (rNCH) END OF INTERVAL (rNCrr) WATER DEPTH CHANGE (rNcrr) PERCOLATION RATE (MrN/rNCH) 1 130 0 1.5 1.5 6.66 1 140 1.5 J 1.5 6.66 1 150 J 4.5 1.5 6.66 r200 4.5 5.75 t.25 8 12r0 5.75 7 1.25 8 1220 7 8.25 t.25 8 1230 0 I 1 10 t240 1 2 1 10 t250 2 J 1 10 1300 J 4 1 10 1310 4 5 I 10 r320 5 6 1 i0 AVERAGE PERCOLATION RATE (MIN/INCH)8.7 A8 FIGURE 1 PERCOLATION TEST PIT Wflstw@ter Engineering 2516 Foresight Circle, jt1 Grond Junction, C0 81505 (e7o) 241-7076 A = SOILS AND PERCOLATION TEST PIT SCHEMATIC Profile View EXISTING GROUND SURFACE HOLE SURF 15'____+l , 1 5 8' Plon View o Cylindricol Percolotion Test Holes 4-8" Diometer 1-Foot Deep Oll l + 15' 15' Percolotion Test Pit Plon View & Cross Section Scole 1":10' o o APPENDIX B FIGURES ELD AP 1 APPROXI ISTI I & RIVER i. R I!/E n\ibstYltrkrr €Engineering 2516 Foresight Circle, # I Grand Junction, CO 81505 (970) 24r-7076 \m.westwaterco.com FIGURE 81 TBD COLORADO RIVER RD DfiSNNG OWTS SNE PI.AN \!)/ ' ON POND USE I .' j' 5610 200 100 0 SCALE: 1":2AO' 2AO n\hlestYlr.?ltnrt GEnglneering 25 I 6 Foresight Circle, #l Grand Junction, CO 81505 (970) 241-7076 www. westwaterco. com FIGURE 82 TBD COLORADO RIVER RD PROPOSED OWTS I.AY-OI,'T APPROXIMATE LINE-'a 7.09 COUNTY GIS, EXISTING PROPER.TY ACRES (PER GARFTELD JULY 2025) NEW L,F*._-t,.S ' - 22.5 ..EW.4" 'PVC OSED NEW ..1,0O0 N SEPTI c TANK R' i1 PROPOSED 2-B DWELLING NEW 4'' SDR 35. PVC SEWER SERVICEI (L:59.3 L.F.i.,S=2%) PROPOSED NEW GALLON SEPTIC I NEW 2-WAY: CLEANOUT (TrP) 1,500 TANK \II \I APPROXIMATE PROPOSED DRIVEWAY ', t. tr 50250 0 SCALE: 1 ":50' 5 a." APPROXIMATE LOGATION OF' OWTS CROSS SECNON FIGURE 83 n\lestlllhter €Engineering 2516 Foresight Circle, #l Grand Junction, CO 81505 (970) 241-7076 \W.westwaterco.com NEW 10" ROUND IRRIGATION VALVE BOX AT EACH PORT MOUNTED FLUSH WITH GROUN PLACE GEOTEXTTLE (2 OZ/yf) OVen TNFTLTRATORS (Typ) NEW 4,, SCH 40 PVC OBSERVATION PORT WITH CAP (TYP CROWN BACKFILL OVER TRENCHES APPROXIMATE EXISTING o + o() 8.0' 68 Q4 INFILTRATORS (4) TRENCHES (rz) ururrs EAcH TRENcH PROVIDE LEVEL SCARIFIED SURFACE ACROSS LENGTH OF TRENCH(S), NOTIry ENGiNEER rF TRENCH BOTTOM(S) ARE WEtV GROUNDWATER_ GREATER THAN 8.0' TRENCH NOTE: MMIMUM DEPTH 4.0 FEET MiNIMUM DEPTH 3.0 FEET INSTALI.ATION NOTES: 1 ) FoLLOW MANUFACTURERS iNSTRUCTION www.infiltrotorsystems.com 2) SCREW PrPE TOp PORT CHAMBER FACEP|-ATE 3) SCREW FACEPT-ATES AND UNrTS TOGETHER 4) INSTALL MONITORING PORTS TRENCH ENDS SCALE 1"=5' +.o'4.O' 3.0 +.o' TOPSOIL Oz a - JLI E 1,500 GALLON SEPTIC TANK FIGURE 84 A\{estVlhter;F Engineering 2516 Foresight Circle, #l Grand Junction, CO 81505 (970)241-7076 \W.westwaterco.com NW,I 24,,A ACCESS HATCHES WrTH LOCKTNG/ SECURE TANK LIDS FiNISHED GRADE NATIVE BACKFILL COMPATEDro 95% MSHTO T-99 *.2%oRENCO (OR EOUTVALENT) 4" EFFLUENT FILTEROPTIMUM SOIL MOISTURE GRAVITY FLOW FROM s-BR DWELLING + NEW 4" SCH 40 PVC SEWER LINE (L:59.J't, S:-2%) TO STA NEW 4,' SCH 40 PVC SEWER LINE NEW 4,, SCH 40 DISTRIBUTION BOX PVC WYE/TEE NEW 1,500 GALLON SEPTIC TANK NEW 7+" MINUS WASHED ROCK (8" INcH DEPTH MINIMUM) o, N xHWL 4, AFFv I'r) N x + v? N 1,OOO GALLON SEPNC TANK FIGURE 85 m\ihstUghter -FEngineeiing 25 16 Foresight Circle, #1 Grand Juction, CO 81505 (970) 241-7076 w.westwaterco-com NEW 24,,A ACCESS HATCHES WrTH LOCKTNG/ SECURE TANK LIDS FINISHED GRADE NATIVE BACKFILL COMPATED TO 95% MSHTO T-99 X2%oRENCO (OR EQUTVALENT) 4,, EFFLUENT FILTER OPTIMUM SOIL MOiSTURE GRAVITY FLOW FROM 2_BR ADU NEW 4" SCH 40 PVC SEWER LINE (L:7s.2't, S:-2%) TO STA NEW 4,, SCH 40 PVC SEWER LINE DISTRIBUTION BOX NEW 4" SCH 40 PVC WYE/TEE NEW 1,OOO GALLON SEPTIC TANK NEW 7+" MINUS WASHED ROCK (8" INCH DEPTH MINIMUM) NOTE: CONTRACTOR IS TO WRIFY SLOPE BET'TEEN SEPTIC TANK PUMP PIPE CONNECTION AND INFILTMTOR BED CONNECftON TO DETERTIINE IF SLOPE ADJUSTUENT IS REQUIRED PRIOR TO INSTALUNC FORCE TIAIN. I X + HWL 4, AFF r.o N v N rO rr) N APPENDIX C GARFIELD COUNTY ON.SITE WASTE WATER TREATMENT SYSTEM REGULATIONS, TABLE 7.1 FROM THE 2OI9 REGULATIONDOCUMENT CODE OF COLORADO REGULATION Water QualiU Control Commission 5 CCR 1002-43 Table 7-1 Minimum Horizontal Distances in Feet Between Components of an On-Site Wastewater Treatment System lnstalled After November 1 1973 and Water and Health Features Septic Tank, Higher level treatment Unit, Dosing Tank, Vault or Privy 5 5 5 10 10 Dry Gulch, Cut Bank, Fiil Area (from Crest) 10 102 25 50 502 503 25 25 Lake, Water Course, lrrigation Ditch, Stream, Wetland 10 102 25 10 10 Subsurface Drain, lntermittent lrrigation Lateral, Drywell, Stormwater Structure 102 10 10 10 Property Lines, Piped or Lined lrrigation Ditch, upslope curtain drain 10 Structure without basement, crawl space or footing drains 5 0 10 10 15 5 0 20 15 15 Structure w/basement, crawl space or footing drains 56 252 102 102 Potable Water Supply Line 2 102 502 100 3 60 60 Spring, Well,1 Suction Line, Potable Water Supply Cisterna 502 Building Sewer or Effluent Lines STA Trench, STA Bed, Unlined Sand Filter, Sub- surface Dispersal System, Seepage Pit Lined Sand Filter Lined Evapo- transpiration Field or Outside of Berm of Lined Wastewater Pond Septic Tank, Higher Level Treatment Unit, Dosing Tank, Vault or Vault Privy 43 FIG. C.1 Septic Tank, Higher level treatment Unit, Dosing Tank, Vault or Privy 10 N/A 10 Dry Gulch, Cut Bank, Fiil Area (from Crest) 15 25 10 Lake, Water Course, lrrigation Ditch, Stream, Wetland 25 100 253 Subsurface Drain, lntermittent lrrigation Lateral, Drywell, Stormwater Structure 25 25 0 Property Lines, Piped or Lined lrrigation Ditch, upslope curtain drain 10 25 10 Structure without basement, crawl space^or footing drains 15 25 1255 Structure Wbasement, crawl space or footing drains 15 25 125 Potable Water Supply Line 2 252 502 102 Spring, Well,1 Suction Line, Potable Water Supply Cistern4 100 100 100 3 Unlined Sand Filter in SoilWith a Percolation Rate Slower than 60 Minutes per lnch, Unlined or Partially Lined Evapotrans- piration System, Outside of Berm of Unlined 1 Wastewater Pond, or System Not Relying on STA for Treatment Other than Aerosol Slit Trench Latrine, Pit Priw System Not Relying on STA for Dispersal CODE OF COLORADO REGULATION Water Qualitv Control Commission 5 CCR 1002-43 NOTE: The minimum distances shown above must be maintained between the OWTS components and the features described. Where soil, geological or other conditions warrant, or upgrading of existing OWTS where the size of lot precludes adherence to these distances, a repaired OWTS must not be closer to setback features than the existing OWTS, as reviewed and approved by the local public health agency. Components that are not \^,atertight should not extend into areas of the root system of nearby trees. 1 lncludes potable wells, irrigation wells and monitoring wells set within a potable aquifer and inflhation galleries permitted as wells by the Division of Water Resources. 4 FtG. C-2 CODE OF COLORADO REGULATION Water Qualitv Control Commission 5 CCR 100243 2 Crossings or encroachments may be permitted at the points as noted above provided that the water or wastewater conveyance pipe is encased for the minimum setback distance on each side of the crossing. A length of pipe with a minimum Schedule 40 rating [ASTM Standard D 3034-16 (2016 version)] of sufficient diameter to easily slide over and completely encase the conveyance must be used. Rigid end caps of at least Schedule 40 rating [ASTM Standard D 3034-16 (2016 version)] must be glued or secured in a watertight the bottom of the encasement pipe. The area in which the pipe passes through the end caps must be sealed with an approved underground sealant compatible with the piping used. Other methods of encasement that provide equal protection are allowed. These methods must be reviewed and approved by the local public health agency' 3 Add eight feet additional distance for each 100 gallons per day of design flows between 1,000 and 2,000 gallons per day, unless it can be demonstrated by a,professional required to minimize contamination as part of the Division site application and permitting process. 4 All horizontal setbacks to a potable water supply cistern must be met unless a variance by the Board of Examiners of Water Well Construction and Pump lnstallation 1 1 .4 of the Waier Well Construction Rules, as applicable. The minimum horizontal setback that may be granted through a variance is to 25 feet. 5 lf the structure is not used as a habitable unit, the isolation may be reduced by the local board of health to no less than 50 feet. 6. Building sewer installations shall meet the design requirements of the Colorado Plumbing Code. 45 FtG. C-3