HomeMy WebLinkAboutOWTS Permit Card
Garfield County Public Health
2014 Blake Ave.
Glenwood Springs, CO 81601
Phone: (970) 945-6614 ext. 8150
For inspections, call: 970-945-6614 ext. 8150 and call the Design Engineer, if applicable
Project Address: TBD Rapids View Lane, New Castle Parcel No.: _218104307003
Owner Name: Ben & Erika Coon Owner Phone: (970) 618-8356
Designed By: CBO Inc. Designer Phone: (970) 309-5259
Number of Bedrooms: _5 Minimum Tank Capacity: 1,500-gallon Minimum Absorption: 787.5 ft2
OWTS PERMIT
KEEP AVAILABLE AT PROJECT SITE
Permit Number _SEPT-9349_______________________________
Permit Type X New X Repair X Remodel/addition X Tank only
Issue Date _08/14/2025____________________ Expiration Date_08/14/2026_________________
Permit Conditions:
This OWTS Permit is approved on the condition of compliance with the report and design as
submitted by CBO, Inc. dated January 1, 2022. Changes to the design and permit must be approved
by Garfield County Public Health and the designer prior to construction.
The new OWTS will serve a four-bedroom residence and a proposed fifth bedroom. The system will
consist of a new, two-compartment 2,000-gallon septic tank on the CDPHE approved tank list set
level with access at grade and a screened high-head pump in the second chamber. Effluent will be
pumped to an ADV at the high point of the system that will distribute effluent to 816 ft2 of STA. The
new STA will consist of two 68 foot by 6-foot gravelless chamber beds consisting of 2 rows of 17
‘Quick 4’ chambers (68 chambers total). Distribution laterals are to be 1 1/2-inch Schedule 40 PVC,
with 5/32-inch orifices every 3 -feet on center and the laterals ending in 90-degree sweeping bends
and flushing valves at the distal end of the laterals. The orifices are to be facing upward, except for
the first and last orifices (which shall face downward and be equipped with splash plates). Inspection
ports are to be installed at each end of each chamber row (one in each corner of the bed at
minimum). The residual head (squirt height) at the end of the system is to be 5-feet. Maintain all
setbacks and elevations as designed.
To assist in scheduling, please contact Garfield County Public Health (970-945-6614 ext. 8150) to
notify the start of OWTS construction. Contact the designer and Garfield County Public Health at
least 48 hours prior to requesting final inspection of the installed system prior to backfill. NO OWTS
COMPONENT SHALL BE BACKFILLED WITHOUT PRIOR APPROVAL FROM GARFIELD COUNTY PUBLIC
HEALTH AND THE DESIGNER.
Agreement
All installations must comply with all requirements of the Garfield County OWTS regulations
including but not limited to the conditions specified above.
In consideration of the issuance of the permit, the applicant hereby agrees to comply with all
laws and regulations related to the zoning, location, construction, and erection of the proposed
OWTS and associated structures for which this permit is granted. The applicant further agrees
that if the above said regulations are not fully complied with in the zoning, location, erection,
and construction of the above described OWTS and structure, the permit may then be revoked
by notice from the Health Department and immediately become null and void.
The issuance of a permit and specifications of terms and conditions therein will not constitute
assumption of liability, nor create presumption that the local public health agency or its
employees may be liable for the failure or malfunctioning of any system. Permit issuance will
not constitute a certification that the system, the equipment used in the system, or any
component used for system operation will ensure continuous compliance with the provision of
the OWTS Act, the regulations adopted thereunder, or any terms and conditions of a permit.
Permit Approval
Plans and specifications for the proposed OWTS have been reviewed and are considered
satisfactory. Permission is hereby given to the property owner(s) to perform the work indicated
in accordance with the Garfield County OWTS Regulation. This Permit will expire 1 year from
the date of issuance unless construction on the system has commenced. An "as-built" drawing
must be submitted and inspection of the system must be completed by GCPH before final
approval of the system will be issued.
08/14/2025
Issued By: Garfield County Environmental Health
Department
Date