Loading...
HomeMy WebLinkAboutObservation of Excavation 08.14.25Geo Quest G*oteclurical Errgineering and Testing i97CJ 3l 8.5784 PO Bo:c i 372 R'ile. CC: 81650 georlu sstcoiii) !r'n1. r1r* August L4,2025 Geo Quest Project No.25-140 Patrick Gilson 110b cR 121 Carbondale, Colorado 8t623 Subject: Open Hole lnspection Mr. Gilson, Geo Quest (GQ) visited the project at 8339 CR 31.1 on August LL,2A25 to observe the foundation excavation for single family residence referenced in the geotechnical investigation report produced by Geo Quest with project number 24-L56 and dated June X.9, 2924. At the time of the site visit the structure footprint was excavated to the native subgrade footing elevation. The surface had been compacted with a rernote control, walk behind, sheepsfoot roller. GQ was not present for the excavation or compaction process. The soil conditions observed are consistent with those encountered in the geotechnical investigation and the allowable bearing capacity value listed in the plan set dated 6/26/25 prepared by others. The attached photos show the subgrade surface on the day of the site visit. Proper drainage should be maintained throughout the construction process to direct water away from the excavation and subgrade soil. GQ should be contacted for review if soil conditions change before foundation elements are placed. Respectfully submitted, Geo Quest, LLC Kevin E. Dye, P.E. -1 L 5: 57139 Attachments: Site Visit Photos Geo Quest Geotechnical Engineering and Testing (970) 318-6784 PO Box 1372 Rifte.CO 81650 geague$tco@pm.me Photo 1'View of excanation looking south i_: Photo 2 - View looking north