HomeMy WebLinkAboutConditions of PermitF PERMIT
BLRE-07 -25-9373
ZACH SMITH
New Single-family dwelling w/ attached garage
12 River Park Ln, Carbondale
Aspen Glen Flg 1, Lot F-l 1 - 23932030501 1
1) ALL WORK SHALL COMply W|TH THE 201s TNTERNATTONAL RESTDENTTAL CODE (l.R.C.)AND 2018
I NTERNATIONAL ENERGY CONSERVATION CODE (I.E.C.C.)
2) PROPOSED TMpROVEMENTS ARE SUBJECT TO ALL APPLTCABLE rrEMS CONTAINED lN THE
ATTACHED "GARFIELD COUNry BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON
PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
3) ELECTRTCAL PERMTTTTNG AND TNSPECTTONS BY COLORADO STATE ELECTRTC BOARD. ELECTRICAL
ROUGH,IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS
REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.
4) ALL EXTERIOR LIGHTING TO BE DOWNCAST AND SHIELDED.
5) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND
DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE
DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNIry DEVELQPMENT WEBSITE FOR
ADDITIONAL I N FORMATION.
6) OPEN HOLE SOTLS REPORT rS REOUTRED AT FOOTTNG TNSPECTTON AND PRIOR TO ANY CONCRETE
POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR.
3,000 PSF soil bearing.
7) PRE-ENGTNEERED ROOF TRUSSES. HAVE ENGTNEERTNG FOR BUTLDTNG INSPECTOR AT TrME OF
FRAME INSPECTION.
8) A LOT TMPROVEMENT CERTTFTCATE, SEALED BY A COLORADO LTCENSED SURVEYOR, rS REOUTRED AT
FOUNDATION INSPECTION TO VERIFY STRUCTURE IS IN COMPLIANCE WITH MINIMUM SETBACK
REOUIREMENTS i BUILDING ENVELOPE.
9) AN ELEVATION SURVEY, SEALED BY A COLORADO PROFESSIONAL LICENSED SURVEYOR, IS
REOUIRED AT FRAME INSPECTION TO VERIFY THAT AS.BUILT ROOFS COMPLY WITH GARFIELD
COUNry'S 25-FOOT BUILDING HEIGHT LIMIT AS DEFINED IN THE LAND USE DEVELOPMENT CODE.
10) BLOWER DOOR TEST tS REOUTRED. MUST SUBMTT BLOWER DOOR TEST REPORT TO GARFTELD
COUNry COMMUNITY DEVELOPMENT DEPT. OFFICE PRIOR TO SCHEDULING FINAL BUILDING
INSPECTION / C.O. FINAL.
1 1 ) PRESCR|pTtVE PATH USrNG 2018 tECC TABLE R402.1.2 rS CHOSEN FOR ENERGY COMPLTANCE OF
THIS HOME. MANUAL J REPORT ALSO ATTACHED FOR REFERENCE. ALL NEW HOMES TO HAVE
WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM INSTALLED (2015 IRC TABLE m1507.3.3(1)AND
(2)SHOWN ON COVER SHEET.
$
.{,q
$\
$N