Loading...
HomeMy WebLinkAboutDemo PermitGarfield County i Gtdinmunity Development Department 108 8th Street, Suite 401 '",1 3 [i .l[J2hten*ood springs, co 81601 ! ,r r_.{'!i. (9701945-8212 www.ga rfieldcountvco,gov $ $It S*\ -\\\$ BUILDING PERMIT APPLICATION TYPE OF CONSTRUCTION Commercial/Multi-Family I Demolition Manufactured Home or Tiny Home (Single or Multi-Level) I Residential (SF, Duplex or Townhome)Reroof Accessory Dwelling Unit (ADU) - MAXIMUM SIZE OF 1,200 SQUARE FEET INVOTVED PARTIES Property Owner: Mailing Address: ;rt Phone: tfiO t 6/[' i/59 ( J Email Address 0 Contractori Phone: (_) Mailing Address: Email Address: Architect:Phone: Mailing Address Email Address: Engineer:Phone: ( ) Mailing Address Email Address: Manufactured Home lnstaller:Phone: ( ) Mailing Address Email Address: PROJECT DETAITS Describework: fuA,rt old lautrt Job Address:L Assessor's Parcel Number: Sub.Lot _ Block _ Owner's Valuation of Work:(Property Size (Sq. Ft. or Acres)Lq, Sq. Ft. of Building:110 0 Height:# of Floors: 'L o Class of Work:New Remodel/Alteration flnooition Garage Attached Detached f I PROJECT DETAILS CONTINUED Septic:f,WTS Community Type of Heat:Natural Gas Propane Driveway Pcrmiti Authoriw. ThisapplicationforaBuildingPermitmustbesignedbytheOwneroftheproperty,describedabove, oranauthorizedagent. lfthesignaturebelowisnotthatoftheOwner,aseparateletterofauthority,signedby the Owner, must be provided with this Application. Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for purposes of inspections by the Building Division. Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit, (3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or a State Wastewater Discharge Permit. Void Permit. A Building l,ermit becomes null and void if the work aurhorlzed ls not commenced wlthln 180 days of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement. Other CERTIFICATION Electric Permit #: NOTICE I hereby certify that I have read this Application and that the information contained above is true and correct. I understand that the Building Division accepts the Application, along with the plans and specifications and other data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming completeness of the submittals and approval of this Application, a Building Permit will be issued granting permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the Building Division. ln consideration of the issuance of the Building Permit, I agree that I and my agents willcomply with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, OWTS regulations and applicable land use regulations (County Regulation(s)). All County development requiring a permit, except for residential uses are subject to Article 7 of the Land Use and Development Code. I acknowledge that the Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other appiicabie law. I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1) requiring the correction of errors in the submittals, ifany, discovered after issuance; or (2) stopping construction or use ofthe structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law. Review of this Application, including submittals, and inspections of the work by the Building Division do not constitute an acceptance of responsibility or liability by the County of errors, omissions, or discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or builder. I hereby acknowledge that I have read and understand the Notice and Certification above, as well as, have provided the required information which is correct and accurate to the best of my knowledge, [,-10 - Ls Pro Date t ?- Owner Print USE ONLY "#;"X"il &tlb /77 flM 5 n n SLE o z*;?e q'zrc Adjusted Valuation:Plan Check Fee:Permit Fee: -C<i oo Manu. Home Fee: -t-€ Misc. Fees - BP No; T>rrvrq4j+L OWTS No:Total Fees: a5.oo Fees Paid: 's,oo Balance Due:J4-- Setbacks:OCC Group:Const. Type:'"'(t' (ft,',"t , gc6% BUILDING / PTANNING DIVISION Signed Approval Date ASBESTOS ABATEMENT NOTIFICATION and PERMIT APPLICATION FORM FEE MUST ACCOMPANY THIS FORM. INCOMPLETE APPLICATIONS WILL BE RETURNED. C-olorado Department of PublicHeal& and f,nl'ironment Submit form to: Permit Coordinator Colorado Dept. of Public Health and Environment APCD-IE-B1 4300 Cherry Creek Drive South Denver, CO 80245-1530 Phone:303-692-3'100 Fa\:. 303-782-0278 asbeslos@state.co.us Public and Commercial Building, School, and Single-F amily Residential owettlno: > 260 LF or 160 SF or a S5-qallon drum Courtesv Notice Non-Public Access Notice Notice 3O-Dav P&C/SFRD Perm|t 90-Day P&C/SFRD Permit 365-Dav P&C/SFRD Permit Phase of Multiple Phase Permit # $0 $80 $80 $400 $800 $1200 $80 code 100 code 105 code110ll I code 1901292 code 165/267 I code 177 ] Ll Single Family Residential Dwelling (SFRD) > 50 LF or 32 SF or a 55-gal. drum, but < 260 LF or 160 SF or a S5-gallon drum Courtesv Notice Non-Public Access Notice (Opt Out) Notice 30-Dav Permit 90-Dav Permit 365-Dav Permit Notice or Permit Transfer $0 $60 $60 $1 80 $300 $420 $55 code 200 code 205 code 210 code230ll I I code 290 I Ll code 265 I code 1 80/280 ] Ll Buildinq Owner Owner Name Contact Street Address Zip code Fax#() Disposal Site Landfill Name Street Address Zip code CDPHE Use Only Approved by: PM req'd? N W Date lssued State State City City Postmark or Delivery date Form of Payment & # Record # Telephone #() Permit # Abatement Site Building Name Specify location in the building where work will take place (e.9. floor, room, wing, etc.) Street Address Zip code Cell Phone #() Project lnformation End Date End Time AM PM Check the day(s) of operation: Sun MTUWThFSan n! nnn Type of ACM: TSl, Texture, VAT, etc. 55 gal. Drums County Square Feet / Type Building Contact Start Date Start Time PM AM City Emergency?Ytl Ntl Linear Feet / Type Abatement Contractor Company Name Street Address Zip code Fax#() CO. Cert # Project Personnel CO Project Mgr. Name CO Project Designer # CO Project Designer Name CO Project Designer # Registration # A.M.S. Name CO A.M.S. Cert # State Project Supervisor Consulting Firm Name City Telephone # t) Cell Phone #() Cell Phone #() Cell Phone #(t describe below the work practices and procedures to be employed in conducting the abatement of asbestos. BE ceiling tile, TSl, etc.)" Use another page if necessary to .s. Fom: AANPAo8 Rev.0l/30/2008 Asbestos PermiUNotice Application Form lnformation and lnstructions: 1. There is a 10 working-day advance notification requirement for permit applications. Day 1 is the 1't business day following the postmark or hand-delivery date. (Working Day means Monday through Friday and including holidays that falls or any of the days Monday through Friday.) 2. lf you wish to request a deviation from Colorado Regulation No. 8, Part B, a Variance Request Form must be completed and submitted to the Division with a $50 review fee. Variances rnust be submitted on the Division's form to be accepied. 3. Please be specific on the types of materials to be abated and the work practices to be used 4. All spaces must be filled in on the permit. lf the information is not applicable, please write N/A. Incomplete information may result in a delay in processing the application, which may delay your project. 5. ln the "Abatement Site" box, we must have a building contact telephone number on the permit application before it can be processed This must be someone other than the GAC or its employee who can provide the Division access to the site if the GAC is not on site. 6. lf there needs to be modifications to the notice after the application has been submitted, notify the Asbestos Unit by fax at 303-782- O278 or e-mail at asbestos@state.co. us before the end of the next regular state business day following the modif cation. Project modifications include changes in scope of work, AMS, superuisor, the scheduled work dates or.scheduled work times. Please use the PermiUNotice Modification Form. 7. Supporting digital photographs or documentation may be e-mailed to: asbestos@state.co.us 8. Prior to the start of any asbestos abatement in an area of public access of a non-school building, in which the amourt of asbestos- containing material to be abated exceeds 1,000 linear feet on pipes or 3,000 square feet on other surfaces, a Project Designer certified under Regulation No. 8, Part B, shall develop a written project design. 9. Prior to the start of any asbestos abatement in a school building in which the amount of friable asbestos-containing material to be abated exceeds 3 linear feet on pipes or 3 square feet on other surfaces, a written project design shall be developed by a Project Designer certified under these regulations, in accordance with paragraph IV.G.7 of Regulation No. 8, Part B. 1C. A Project Manager is required on all projects where the amounts of friable asbestos-containing materials to be abated exceed 1,000 linear feet and/or 3,000 square feet. The Project Manager requirement may be waived; please see section lll.B.E of the CAQCC's Regulation No. 8, Part B, for more information. 11. All provisions of larvs and ordinances governing this type of work shall be complied with whether specified herein or not. Abatement permits or approval notices appearing to give authority to violate or override the provisions of any other laws or crdinances shall be invalid. Furthermore, abatement permits or approval notices issued in error or based upon incorrect information supplied to the Division shall also ce invalid. Fomr AAWAo8 Rw. 0l/30/2008 GENERAL INFORMATION ON ASBESTOS What rs Asbestos? Asbestos is the name given to a number of naturally occurring minerals that have been mined for their useful properties such as thermal insulation, chemical and thermal stability, and high tensile strength. The types of asbestos that are regulated are: Chrysotile, Amosite, Crocidolite, Anthophyllite, Tremolite, and Actinolite. Asbestos deposits can be found throughout the world and are still mined in South America, Australia, Canada, South Africa, and the former Soviet Union. Why is Asbesfos a hazard? Asbestos is made up of microscopic bundles of fibers that may become airborne when disturbed. lf these fibers get into the air, they can be inhaled into the lungs where they may cause significant health problems. Researchers still have not determined a "safe level" of exposure but we do know that the higher the concentration of fibers and the longer the exposure, the greater the risk of contracting an asbestos-related disease. Some of these health problems include: Asbestosis - a lung disease that causes scarring of the lungs. Eventually, this scarring may become so severe that the lungs cannot function. The latency period (meaning the time between the exposure and the onset of disease) is often 25-40 years. Mesothelioma - a cancer of the lining of the lung and chest and/or the lining of the abdominal wall. Asbestos exposure is one of the few causes of this cancer. The latency period for mesothelioma is often 15-50 years. Lung Cancer- Lung cancer can be caused by exposure to asbestos. A person has a much greater chance (50 to 84 times greater) of developing lung cancer if they are exposed to asbestos and they smoke. Cancer of the gastrointestinaltract can also be caused by asbestos exposure. The latency period for these cancers is often 15-30 years. Despite the common misconception, elposuretoasbestos fibers does not cause headaches, upper respiratory irritation or other immediate symptoms. As mentioned above, the effects often go unnoticed for 15-50 years. When is Asbesfos a hazard? Asbestos-containing materials (ACM) in good condition should not pose a hazard to building occupants. lf these materials can be maintained in good condition, it is recommended that they be left alone and periodic surveillance performed to monitor their condition. lt is only when ACM is disturbed or the materials become damaged that it becomes ahazard. When the materials become damaged, the fibers separate and may then become airborne. ln the asbestos industry, the term 'friable' is used to describe an ACM that can be reduced to powder by hand pressure. 'Non-friable'means an ACM that is too hard to be reduced to powder by hand pressure. Mechanical grinding, sanding and dry-buffing are some ways of causing non-friable materials to become friable. cotoRAoo Revised 3/24ll 5 1tffi Where Can Asbesfos Be Found? Asbestos was, and still is, used in building materials for a variety of reasons. Asbestos fibers are incredibly strong and have properties that make them resistant to heat, chemical damage and insulate against electricity as well as adding durability to a product. Asbestos was added to thermal and acoustic insulation, fireproofing, roofing products and flooring. Some of the more common products that may contaln asbestos lnclude: Wasn't Asbesfo s Ban n ed? There are common misunderstandings about an Environmental Protection Agency (EPA) ban on ACM products or uses from 1989. Many sources incorrectly report that all asbestos- nnntaininnnrnr{rrntcharrahaanhannar{ ln4OO'l fhallQ triffh/^irnrrif(^nrrrf nf Annaalc '''.vl-'l'lllvv.v.lvl,rt,},vglv vacated much of the so-called "Asbestos Ban and Phaseout" rule and remanded it to the EPA. Thus, much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing, or distribution in commerce of many asbestos-containing product categories was set aside and did not take effect. Six asbestos-containing product categories are still subject to the 1989 asbestos ban. However, EPA has no existing bans on other asbestos-containing products or uses. Products manufactured in other countries may also contain asbestos and can be imported into the United States. EPA does NOT track the manufacture, processing, or distribution in commerce of asbestos-containing products. lt would be prudent for a consumer or other buyer to inquire as to the presence of asbestos in particular products. Possible sources of that information would include inquiring of the dealer/supplier or manufacturer, refer to the product's "Safety Data Sheet" (SDS), or consider having the material tested by an accredited laboratory before installing it in your building. For More Informatian, please contact: Asbestos Compliance Assistance Group Phone: (303) 692-3100 Fax: (303) 782-0278 Toll Free: 1-800-886-7689 Web page: wunv. colorado.qov/cd phe/asbestos Email address: cdphe.asbestos@s aOLORAfro Acoustical Plaster Decorative Plaster Joint Compounds Adhesives and Mastics Ductwork Flexible Fabric Connections -aboratory Gloves Asphalt Floor Tile Electric Wirinq lnsulation -aboratorv Hoods/Table Tops Base Flashing Electrical Cloth Packing Materials (for wall/floor renetrations) Blown-in lnsulation llectrical Panel Partitions Pipe lnsulation (corrugated air-cell, rlock, etc.) Boiler lnsulation llevator Brake Shoes Roofinq Felt Breaching lnsulation Carpet Backinqs ilevator Equipment Panels :ire Blankets Roofing Shingles Soacklino Compounds Caulkino/Putties =ire Curtains Sorav-Applied lnsulation Ceilinq Tiles and Lav-in Panels Fire Doors Taoino Comoounds (thermal) Cement Pipes ;ireoroofino Materials fextured Paints/Coatinos Cement Sidinq =loorinq Backinq Ihermal Paper Products Cement Wallboard ieatinq and Electrical Ducts y'invl Floor Tile Chalkboards Hiqh Temperature Gaskets /invl Sheet Floorinq Construction Mastics (floor tile, carpet, oeilinq tile. etc.) High Temperature Paper Products Vinyl Wall Goverings Coolinq Towers HVAC Duct lnsulation Wallboard Revised 3/24115 2 tlv STATE OF COLORADO Bill Owens, Governor Dennis E. Ellis, Executive Director Dedicated to protecting and improving lhe health and envlronment ol the people of Colorado 4300 Cherry Creek Dr. S, Laboratory Services Division Denver, Colorado 80246-1530 8100 Lowry Blvd. Phon6 {30s} 692-2000 Denver, Colorado 80230-6928 TDD Line (303) 691-200 (303)692-3090 Located in Glendale, Colorado http;//www. odphe.6tate. oo. us Colorado Department ofPublicHealth andEnvironment BUILDING RENOVATION AND DEMOLITION WHAT YOU NEED TO KNOW! Are you Remodeling, Renovating or Demolishing? You are subject to Statg,qn4 FPderal Regulations reqqifinqinspection for asbestos. Avoid penalties and delays: have your project inspected for asbestos by a Cotorado-certifled asbestos building inspector before commencing work. It is illegal to improperly disturb asbestos cantaining materials! Asbestos can be found in these and other common building materials: Ceiting textures, vinyl floor coverings and mastic, boiler and pipe insulation, healing and cooling duct insulation, ceiling tile, rooflng products, clapboard shingles, etcetera. These materials are regulated; a certified asbeslos inspector can determine which materials contain asbestos and which are regulated. Buildings ot any age may contain asbestos; even those newly built may have asbestos-containing materials, Far ALL Renovation Projects: " Buildingsof any age may contain ashestos; even those newty built may have asbestos containing material$.. lnspection: the structures/components to be disturbed musf be lnspecfed for asbesaos by a state- ceftified asbestos inspector. Contaci CDPHE or go to ourweb site for a current list of Asbestos lnspectors http:{www.,sdple,state.co.UF/ap/a-sbeshom-asp or Asbestos Building lnspector Consulting firms can be found in ihe yellow pages section of most telephone books, under the heading -Asbestos Consulting and Testing". ' lf the amount of asbestos-containing material to be disturbed exceeds the following trigger levels than an abatement contractor must remove the material.o Trigger levels means amounts of material as follows:. With regard to single-family residential dweltings, the trigger levels are 50 linear feet on pipes, 32 square feet on other surfaces, or the volume equivalent of a S5-gallon drum. ' With regard to all areas other than single-family residential dwellings, the trigger levels are 260 linear feet on pipes, 160 square feet on other surfaces, or the volume equivalent of a 55-gallon drum.r A certified removal contractor (GeneralAbatement Conttactor) must remove asbestos-containing materials that are regulated or may become regulated before they are disturbed by renovation or demolition activities. Contact CDPHE or go to our web eite for a current list of General Abatement Contractors httB;l{WW.W.odph.-e.state.co.usiap/asbeshom.asp or Contractors can be found in the yellow pages section of most telephone books, underthe heading 'Asbestos Abatement".o Notification: A written notification to CDPHE, payment of a notification fee and tan {10} working day waiting period is required before the removal (abatement) of regulated asbestos containing materials. Page 1 of 3 J:\Asbeibs and Lead Unlts\Asbeshs Foms\CDPHARenovsdon and Demolltlon.doc ' Regulated asbestos-containing waste material must be disposed of at an approved asbeEtos wastedisposat site. lemalition$, Destructive Salvage , House Moving lf y9u. demolish, perform destructive salvage, fertorm de-construction, Furn, destroy, dismanle, dynamite,implode' knock down, lovel, putt down, pulveiize, raze, tear Jowrr, ffi;k ;i of'l' gtructure or struc-turalcomponents 9r y9u move a house you are subiect to State and Fedeial negulations evon when there lr NOasbostos in thc frcillty. Prior to Demolition: ' lnspection: the building must_be lnspec!1d.fo1.aqficgtos by a state-cerlified asbestos inspector. contact 9DPHE or go to our web site for a current list of Asbestos lnspectors orAsbestosBuiIdinglnspectorConsultingfirmscanbe found in the yellow page section ot most telepnone books, under the- heauing ,nibestos ionsu}irg ,rdTesting". ' Asbestos Removal (if neeessary) rnust be perlormed by a colorado-certified GeneralAbatementconlractor. Any'asbestos conlaining materialthat is friaLte orwillbe made friable ouring dema,litionactlvltles must be removed prior to dlemolition. Removal, in accordance wilh Regulation-No. e, ii iequireo irthe amount of asbestos-containing material that is friable or wilt become friable o-uring demolition exceedsthe trigger tevels. " Ng!|flgqligt!-of Deryplit!9LFo,rm must be submitted to the cDpHE, even if no asbestos rr{as foundduring.the lnspection, payrnent or a notification fee and t"n itolworking day walting period is requiredbefore the demolition can proceed. Duing Demolitisn: ' Recycling of materlals, such as concrete or woocl, that are bondecl or contarninated with asbestps-containing maierial (Aci\/l), such as floortile or masiic, is t'+or permitied." Demolition of a building that has non-friahle asbestos containing. VAT ortar-impregnated roofing materialsremalning musi be completed without eausing tho asbestos-coritaining nrateriate t6 b*.o,nu friable.Concfete floors covered lvith floor tile shall be femoved in gg !6rrna caa{innc .a ha^^ihr^ ^^---L!- - as crushing, pneumatic jacking, etc. ormaterials containing rr;J;to'r*;;',;"fiJil"iiir'rr*' L'rPsr':rlronssucn n when imploding or burning a structure, ALL ashestos-coni"ining material, regardless of quentity, must beremoved prior to demolition. F*r Nlare lntsrrnation, please conta#t: Asbestos Compliance Assistance Groun Asbeetos and Demolition permit Coordinator Fhune: (303) 694-9100 Fax: (303) 782-0ZTB Tall Free: 1-8fi0-SB6-2689 Web.page: L_pltqUry_c Hmait acjdress: Asneqtqs@gJ-Al g, qo..U$": All asbestos abaterneni and demolition permit applicaiion forms are ar,,ailable from our web site or by caltingthe asbestos program. I{AVE YOUR PRO"JHCT INSPECTHD BY A COLORADO.CHRTIFIED ASBESTI)$ B UI I-DI I\iG I |{SFECTOR BffiFORfr YOU BHGIN cafi !"esugt in rensnetnry ponaltie.s and project rJetaysVio{mtlon mf ashestos r@sulstions J:\Asbesbs and L€ad unrsBsbesbs Forms\Corruo**** I39rf,"?o?13 STATE OF COLORADO RENOVATION/DEMOLITION FACT SHEET Prior to ANY renovation or demolition in any public and commercial building that may disturb greater than the trigger levels of a suspect asbestos-containing material (ACM), an inspection must be performed to determine if abatement is required. Trigger Levels Single-family residential dwelling - 32 square feet (SFRD) 50 linear feet The volume of a 55-gallon drum All other areasexcluding a SFRD - 160 square feet 260 linear feet The volume of a 55-gallon drum Individuals performing these inspections shall be State of Colorado certified Building Inspectors. The inspection, sampling and assessments of the suspect materials must be performed as required by Colorado Regulation No. 8, Part B. Buildings, or those portions thbreof, that were constructed after October,72, 1988 shall be exempt from inspection requirements IF an architect or project engineer responsible for the construction of the building or a State of Colorado certified Building Inspector, signs a statement that no ACM was specified as a building material in any construction document for the building or that no ACM was used as a building material in the building. Building Inspectors must be independent of the General Abatement Contractor (GAC) who will be abating any asbestos found. Abatement, in accordance with Regulation No. 8, is required if the amount of ACM that will be disturbed in connection with the renovation exceeds the trigger levels. ANY ACM that is friable or will be made friable during demolition activities MUST be removed prior to demolition. Removal, in accordance with Regulation No. 8, is required if the amount of ACM that is friable or will become friable exceeds the trigger levels. A permit for abatement of friable ACM or demolition of a building, or a notice for the removal of non-friable ACM, must be applied for and received from the Division prior to commencing the activity. o Abatement and Demolition application forms can be obtained from: r www.cdphe.state.co.us/aplasbeshom.asp o Completed applications, along with the requisite fee, can be submitted to: o Permit Coordinator, CDPHE, APCD-SS-BI, 4300 Cherry Creek Drive S., Denver, CO 80246-1530, (303) 692-3100 by mail or in person There is a 10 working day waiting period from the postmark or hand-delivery date to start work on a project requiring a permit or notice. a a a a a a a a