Loading...
HomeMy WebLinkAboutConditions of PermitCONDITION OF PERMIT BLRE-07 -25-937 6 DANIEL GOLDMAN & BETTINA SLUSAR New Single-family dwelling w/ attached garage 555 Wooden Deer, Carbondale Wooden Deer Sub, Lot 1 1 - 239325204011 1 ) ALL WORK SHALL COMPLY WITH THE 201 5 INTERNATIONAL RESIDENTIAL CODE (I.R.C.) AND 2018 I NTERNATIONAL ENERGY CONSERVATION CODE ( I.E.C.C.) 2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRTCAL pERMtTTtNG AND tNSpECTtONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINALAPPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 4) ALL EXTERIOR LIGHTING TO BE DOWNCASTAND SHIELDED. 5) WtLDF|RE MITtcATtON REOUTREMENTS SHOWN ON SHEET 2.1 AND PLAT NOTE #1 (STAPLED TO FIELD COPY): COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNITY DEVELOPMENT WEBSITE FOR ADDITIONAL INFORMATION. 6) OPEN HOLE SOTLS REPORT rS REOUTRED AT FOOTTNG TNSPECTION AND PRIOR TO ANY CONCRETE POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR. 1,500 PSF soil bearing on Structural S1.01. 7) SEPTIC SYSTEM REVIEW / APPROVALS: PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY PROVIDE FINAL APPROVAL / SIGN-OFF FROM GARFIELD COUNry'S PUBLIC HEALTH DEPT. 8) AN ELEVATION SURVEY, SEALED BY A COLORADO PROFESSIONAL LICENSED SURVEYOR, IS REOUIRED AT FRAME INSPECTION TO VERIFY THAT AS-BUILT ROOFS COMPLY WITH GARFIELD COUNTY'S 25-FOOT BUILDING HEIGHT LIMIT AS DEFINED IN THE LAND USE DEVELOPMENT CODE. 9) BATTERY STORAGE FOR ROOF-MOUNTED SOLAR rN BASEMENT MECHANICAL ROON4 "014',. 2021 IRC SECTION R328 ENERGY STORAGE SYSTEM CODE REFERENCES PROVIDED FOR THE GENERAL CONTRACTOR / INSTALLERS ON LOWER LEVEL FLOOR PLAN 3.1. 10) vERtFy SECONDARY OVERFLOW ROOF SCUPPERS TNSTALLED ON FLAT ROOF, SEE ROOF PLAN 3.3. 1 1) BLOWER DOOR TEST tS REOU|RED. MUST SUBMTT BLOWER DOOR TEST REPORT TO GARFIELD COUNTY COMMUNITY DEVELOPMENT DEPT. OFFICE PRIOR TO SCHEDULING FINAL BUILDING INSPECTION / C.O. FINAL. 12) PRESCR|pTtVE PATH USING 2018 rECC TABLE R402.1.2 rS CHOSEN FOR ENERGY COMPLIANCE OF THIS HOME. MANUAL J REPORT ALSO ATTACHED FOR REFERENCE. ALL NEW HOMES TO HAVE WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM INSTALLED (2015 IRC TABLE m1507.3.3(1)AND (2)SHOWN ON COVER SHEET. $ N S.. \\ \s s$