Loading...
HomeMy WebLinkAboutHeating and Cooling Spec SheetHVAC Design Outline: Mitsubishi Multr-Zone Heating and Cooling Ducted Heat Pump System - Design Intent & Component Information Project: 555 Wooden Deer - Carbondale, CO - High-Performance New Construction System Type: Mitsubishi Multi-Zone Hyper-Heat, Fully Ducted Zones: 5 (4 heating and cooling; I heat-only) Created July 1, 2025 by HD Construction Aspen, LLC Reference: Manual J Dated July 1,2025 System Load Summary: . Total Heating Load: 158,200 BTU/hr . Total Cooling Load:91,250 BTU/hr (-7.6 tons) \ $ .-a \ .\t \$Zone Load & Airflow Requirements: Zone Cooling Load (BTU/hr) Main Living 36,000 Master Wing 14,500 Her Office / Back of House 5,750 Lower Level I 9,000 Lower Level2 0 Required CFM 1666.7 671.3 266.2 416.7 0.0 Recommended Outdoor Unit(s): . MitsubishiPUZ-HA60NKAl (Hyper-Hea| - 60,000 BTU cooling / 68,000 BTU heating . Consider adding aPUZ-HA42NKA1 for supplemental capacity, or split into two 3-zone systems Recommended Indoor Units: . Main Living ---+ PEAD-A42AA7 or SVZ-KP36NA (3-3.5 ton class) . Master Wing --- PEAD-AI8AA7 or SVZ-KPI SNA (1.5 ton) . Her Office / Back of House ---+ PEAD-AD9AA7 or SVZ-KP09NA (0.75 ton) . Lower Level I ---+ PEAD-Al2AA7 (1 ton) . Lower Level2 -' PEAD-A}9AA7 (heat-only configuration) Manual D - Duct Design Recommendations: . Ductwork should be sized to handle the required CFM per zone with <0.5 in. w.c. total ESP . Use hard duct where possible to minimize pressure losses. . Target duct velocities: 700-900 FPM in trunks, <500 FPM at terminals. . Use balancing dampers for proper airflow zoning. Smart Thermostat Recommendations : . Mitsubishi Kumo Cloud (PAC-USWHS002-WF-2) - zone-level smaft control . 3rd Party Options: Ecobee Premium or Honeywell RedLINK with interface module . Integrate with CNl05 or use Mitsubishi PAC-US444CN-l adapter Electrical Requirements : . PUZ-HA60NKA1 :2081230Y, l-phase, MCA: 39A, Max Fuse: 50A . PEAD Units: 2081230V, MCA 1 .l-25A depending on model, Max Fuse: l5A . Branch Box: Powered by outdoor unit . Thermostats: Low voltage or Wi-Fi powered ERV/IIRV Ventilation System Specification: . Model: Panasonic Intelli-BalancerM 200 ERV - Airflow Range: 50-200 CFM (balanced intake/exhaust) - ERV core with latent/sensible recovery - Voltage: l20V lAmps: 1.5A I Duct: 6" - Alt: Broan AI Series (AI200 or AI250) Make-Up Air System for 11200 CFM Kitchen Hood: . System: Fantech MUAS 160 or 250 with inline duct heater - Up to 1,200+ CFM with pressure sensor + damper - Heater: 5-10 kW recommended I l20V or 240Y - Interlocked with hood; consider pre-filtration Manual J Heating & Cooling Load Report Location: 555 Wooden Deer, Carbondale,CO 81623 Home Type: New Construction, 2-Story, 4271 sq. ft.. Created July 1, 2025 by HD Construction Aspen ,LLC Indoor Design Setpoints: - Heating: 75oF (Outdoor: -5oF) - Cooling: 65'F (Outdoor: 95oF) Ceiling Heights: - 10 ft throughout, except for 12 ft in 1296 sq. ft. - Average ceiling height: 10.61 ft Envelope Construction : - Walls: 2x6 wl R-21 batts + I " rigid continuous exterior insulation (R-5.5) ---+ Effective R= 4.36 - Roof: R-49 + tapered insulation (R-5) --- Effective R = 4.54 - Windows/Doors: Weighted U-Factor:0.29, SHGC :0.28 - Foundation: 840 sq. ft. slab-on-grade (R-10), remainder over conditioned crawlspace (R-19) Windows (includes glazed doors): - South: 574 sq. ft. - East: 62.5 sq. ft. - West: 194.2 sq. ft. - North: 65.3 sq. ft. - Total: 896.0 sq. ft. $ ,.* $\s Mechanical Ventilation : ERV/HRV rated at 75 CFM Occupancy & Internals: 4 occupants LED lighting throughout No combustion appliances (all-electric house; wood-burning fireplace considered "decorative" for heating/cooling load calculation purposes) HEATING LOAD (BTU/hr): - Wall Loss: 34448 - Window Loss: 20787 - RoofLoss:75309 - Slab Loss: 6720 - Crawlspace Loss: 14446 - Ventilation Loss: 6480 ,---+ Total Heating Load: 158191 .0 BTU/hr COOLING LOAD (BTU/hr): - Wall Gain: 12918 - Window Gain (conductive):7795 - Solar Gain (south/east/west): 38146 - Roof Gain:28241 - Ventilation Gain: 2430 - Internal Gains (People - Sensible + Latent): 1720 ---+ Total Cooling Load:91250.0 BTU/hr --' Cooling Load in Tons: 7.6 tons Notes: Loads are based on Manual J methodology and typical assumptions for tight construction Actual HVAC system sizing may be adjusted based on zoning, equipment type, other design/livability considerations and Manual S specifications.