HomeMy WebLinkAboutComCheck ComplianceCOMcheck Software Version 4.L.5.5
Envelope Gompl iance Gertificate
Project lnformation
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
Construction Sile:
375 CR 352
R|FLE, CO 81650
Additional Efficiency Package(s)
Credits: 1.0 Required 1.0 Proposed
Reduced Lighting Power, 1.0 credit
Building Area
2015|ECC
Bravo Hanger
Rifle, Colorado
5b
New Construction
Owner/Agent Designer/Contractor:
Bighorn Consulting Engineers
386 lndian Road
Grand Junction, CO 8L501
970-24r-8709
Floor Area
1 -Transportation : Nonresidential 1 0598
Envelope Assemblies
Assembly Gross Area
or
Perimeter
Cavity
R-Value
Gont.
R-Value
Proposed
U-Factor
Budget U-
Factorr"r
Roof 1: Metal Building, Standing Seam, Double lnsulation Layer with
Thermal Blocks (c), [Bldg. Use 1 - Transportation]
NORTH
Exterior Wall 1: Metal Building Wall, Single Layer Mineral Fiber
(compressed at girt), [Bldg. Use 1 - Transportation]
Door 1: Uninsulated Single-Layer Metal, Swinging, [Bldg. Use 1 -
Transportationj
EAST
Exterior Wall 4: Metal Building Wall, Single Layer Mineral Fiber
(compressed at girt), [Bldg. Use 1 - Transportation]
Door 5: Other Door, Garage door 14/o glazing, [Bldg. Use 1 -
Transportationl
SOUTH
Exterior Wall 2: Metal Building Wall, Single Layer Mineral Fiber
(compressed at girt), lBldg. Use 1 - Transportation]
Door 2: Uninsulated Single-Layer Metal, Swinging, [Bldg. Use 1 -
Transportationl
WEST
Exterior Wall 3: Metal Building Wall, Single Layer Mineral Fiber
(compressed at girt), [Bldg. Use 1 - Transportation]
Door 3: Uninsulated Single-Layer Metal, Swinging, [Bldg. Use 1 -
Transportationl
Door 4: Other Door, Garage door 14/" glazing, [Bldg. Use 1 -
Transportationl
1 0598
1787
32
4342
3239
1787
32
4342
32
319
20.0 0.0
0.0 49.0
20.o 0.0
0.020
0.147
0.500
0.147
0.050
0.147
0.500
0.147
0.500
0.050
0.035
0.052
0.370
0.052
0.370
0.052
0.370
0.052
0.370
0.370
20.0 0.0
20.o 0.0
Project Title: Bravo Hanger Report date: 07 128125
Data filename: 7:\2025 Projects\25216 Garco Premier Hangars\Energy - Com Check\25216 - Bravo hanger.cck Page 1 of 19
Envelope PASSES: Deslgn 22% better than code
(a) Budget U-factors are used for software baseline calculations ONLY, and are not code requirements.
(b) 'Other' componenls require supporting documentation lor proposed UJactors.
(c) Thermal spacer block with minimum R-3.5 must be installed above the purlin/batt, and the roof deck secured lo the purlins.
Envelope Gompliance Statement
Compliance Statementi The proposed envelope design represented in this document is consistent with the building plans,
speclflcatlons, and other calculatlons submltted wlth thls permlt appllcatlon, The proposed envelope systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.1.5.5 and to comply with any applicable mandatory
rcquircmcnts listcd in thc lnspcction Chccklist.
Blaine Buck pE "6ro;nu"6o.E{,8 7l2gl202|
Name - Title Signature Date
Project Title: Bravo Hanger Report date: 07 128175
Data filename: Z:\2O25 Projects\25216 Garco Premier Hangars\Energy - Com Check\25216 - Bravo hanger.cck Page 2 of L9
COMcheck Software Version 4.L.5.5
lnterior Lighting Gompliance Certificate
Project lnformation
Energy Code:
Project Title:
Project Type:
2015|ECC
Bravo Hanger
New Construction
Owner/Agent:Construction Site:
375 CR 352
RtFLE, CO 81650
Additional Eff iciency Package(s)
Credits: 1.0 Required 1.0 ProPosed
Reduced Lighting Power, 1.0 credit
Allowed Interior Lighting Power
A
Area Gategory
Designer/Contractor:
Bighorn Consulting Engineers
386 lndian Road
Grand Junction, CO 81501
970-241,-8709
B
Floor Area
(fr2)
c
Allowed
Watts / ft2
D
Allowed Watts
(Bxc)
1 -Transportation 1 0598 0.63 6677
Total Allowed Watts = 6677
Proposed lnterior Lighting Power
A
Fixture lD : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
c
#of
Fixtures
D
Fixture
Watt.
E
(cxD)
1-Transportation
LED 1: A: LED High Bay: Other:18
2
284
24
5112
48LED 2: C: LED downlioht: LED A Lam p 25W:
nterior Lighting PASSES: Design 23% better than code
Total Proposed Watts = 5160
lnterior Lighting Gompliance Statement
Compliance Statemenf; The proposed interior lighting design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been
designed to meetthe 2015 IECC requirements in COMcheckVersion 4.1.5.5 and to complywith any applicable mandatory
requirements listed in the lnspection Checklist.
Blaine Buck PE .6Iao"fi*"{fE 712812025
Name - Title Signature Date
Project Title: Bravo Hangel Report date: 07 128125
Data filename: 2:\2025 Projects\25216 Garco Premier Hangars\Energy - Com Check\25216 - Bravo hanger'cck Page 3 of 19
COMcheck Software Version 4.L.5.5
Exterior Lighting Compliance Certificate
Project Information
Energy Code:
Project Title:
Project Type:
Exterior Lighting Zone
Construction Site:
375 CR 352
R|FLE, CO 81650
Allowed Exterior Lighting Power
A
Area/Surface Category
2015 |ECC
Bravo Hanger
New Construction
3 (Other (LZ3))
Owner/Agent:Designer/Contractor:
Bighorrr Consulting Engineers
386 lndian Road
Grand Junction, CO 81501
970-24L-8709
Quantity
c
Allowed
Watts / Unit
D
Tradable
Wattage
E
Allowed Watts
(BXC)
B
Main entrv 184 lt of 30 Yes 5520
Total Tradable Watts (a) = 5520
Total Allowed Watts = 5520
Total Allowed Supplemental Watts (b) = 750
(a) Wattage tradeoffs are only allowed between tradable areas/surfaces.
(b) A supplemental allowance equal to 750 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces.
Proposed Exterior Lighting Power
A
Fixture lD : Description / Lamp / Wattage Per Lamp / Ballast
E
(cxD)
B
Lamps/
Fixture
c
#ol
Fixtures
D
Fixture
Watt.
Pedestrian and vehicular entrances and exits (184 ft of door width): Tradable Wattage
LED 1: LED PAR 12W:12 27 324
Exterior Lighting PASSES: Design 95% better than code
Total Tradable Proposed Watts = 324
Exterior Lighting Compliance Statement
ComplianceStatementj Theproposedexteriorlightingdesignrepresentedinthisdocumentisconsistentwiththebuildingplans,
specifications, and other calculations submitted with thls permit application. The proposed exterior lighting systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.1.5.5 and to comply with any applicable mandatory
requirements listed in the lnspection Checklist.
Blaine Buck pE "6Ianu,fr*,F9* TlZglZOZs
Name - Title Signature Date
ProjectTitle: Bravo Hanger Report dale: e7 lZBl25
Data filename: 7:\2025 Projects\25216 Garco Premier Hangars\Energy - Com Check\25216 - Bravo hanger.cck Page 4 of t 9
COMcheck Software Version 4.L,5.5
Mechanical Compliance Gertificate
Project lnformation
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
Construction Site:
375 CR 352
RtFLE, CO 81650
Additional Eff iciency Package(s)
2015|ECC
Bravo Hanger
Rifle, Colorado
5b
New Construction
Owner/Agent:Designer/Contractor:
Bighorn Consulting Engineers
386 lndian Road
Grand Junction, CO 81501
970-24L-8709
Credits: 1.0 Required 1.0 Proposed
Reduced Lighting Power, 1.0 credit
Mechanical Systems List
Quantity System Type & Description
1 HVAC System 1 (Single Zone wl PerimeterSystem):
Heating: 4 each - Radiant Heater, Gas, Capacity = 200 kBtu/h
No minimum efficiency requirement applies
Fan System: None
HVAC System 2 (Single Zone):
Heating: 1 each - Unit Heater, Electric, Capacity = 10 kBtu/h
No minimum efficiency requirement applies
Fan System: FAN SYSTEM 1 | restroom -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 1 Supply, Constant Volume, 245 CFM, 0.1 motor nameplate hp, 0.0 fan efficiency grade
Mechanical Gompliance Statement
Compliance StatemenL The proposed mechanical design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been
designed to meet the 2015 IECC requirements in COMcheckVersion 4.1.5.5 and to comply with any applicable mandatory
requirements listed in the lnspection Checklist.
Blaine Buck PE .6ran"6..8{'E 712812025
Name - Title Signature Date
Project Title:
Data filename
Bravo Hanger RePort date: 07 128125
2:\2025 Projects\25216 Garco Premier Hangars\Energy - Com Check\25216 - Bravo hanger.cck Page 5 of 19
COMcheck Software Version 4,L"5"5
lnspection Checklist
Energy Code: 20L5 IECC
Requirements: l-.0% were addressed directly in the COMcheck software
Text in the "Comments/Assrrmptions" r:olr-rmn is provided by the lrser in the COMcheck Reqr,rirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is heing clainrerl. Wlrerp rnrrrpliarrre is iternizer:l irr a separate fable, a refererrr:e trr flrat tal-rlc is Frr-rvidFd.
1 High lmpact (Tier 1)2 Medium lmpact (Tier 2)Low lmpact (Tier 3)
Project Title: Bravo Hanger Report date: 07 128125
Data filename: Z:\2O25 Projects\252L6 Garco Premier Hangars\Energy - Com Check\25216 - Bravo hanger.cck Page 6 of L9
Section
#
& Req.lD
Plan Review Complies?Comments/Assumptions
Plans and/or specifications provide all
information with which compliance
can be determined for the building
envelope and document where
exceptions to the standard are
clalmed.
:Ecomplies :
,EDoes Not
ENot Observable
nNot Applicable :
c103.2
lPR1l1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the mechanical
systems and equipment and
document where exceptions to the
standard are claimed. Load
calculations per acceptable
engineering standards and
handbooks.
c103.2
lPR2l1
:nComplies
nDoes Not'nNot Observable ,
lnruot npplicable ,
Plans, specifications, and/or nComplies ,
calculations provide all information :EDoes Not
with which compliance can be
determined for the inteiioi fiotrtino ENot observable
and electrical systems and e-quiprie6l LJNot Applicable
and document where exceptions to . :
lha clrnalrrel rr^ rlri*^n lnfarmrtinn
provided should include interior
lighting powcr calculations, wattage of
bulbs and ballasts, transformers and ,
control devices.
c103.2
lPR4l1
'calculations provide all information DDoes Not
with which compliance can be
determined for the exterioi tiqhtino LlNot observable
and electrical systems and eqiuipm-e61 LJNot Applicable
:and document where exceptions to
the standard are claimed, lnformation
provided should include exterior
lighting power calculations, wattage of
bulbs and ballasts, transformers and
.control devices.
area
Plans, specifications, and/or Compliesc103.2
lPR8l1
c402.4.1
lPR10l1
The vertical fenestration area <= 30 ,nComplies
percent of the gross above-grade wall inDoes Not
,nNst Observable ,
:nNot Applicable :
The skyiight area <= 3 percent of ihe
gross roof area.IDoes Not
!Not Observable
nNot Applicable
CompiiesC4A2.t+.1
lPR1111