HomeMy WebLinkAboutConditions of PermitCONDITION S OF PERMIT
BLRE-07 -25-9389
Don & Lucinda Westerlind, Kylie & Fritz Gonzalez
Alteration of an existing detached garage; remodel conversion into
995 SO FT Accessory Dwelling Unit (ADU)
1 359 CR 294, Rifle
2177 1 0400008
1) ALL WORK SHALL COMply W|TH THE 2015 INTERNATTONAL RESIDENTIAL CODE
(r.R.c.)AND 2018 TNTERNATIONAL ENERGY CONSERVATION CODE (l.E.C.C.)
2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED
IN THE ATTACHED "GARFIELD COUNry BUILDING REOUIREMENTS". NUMBER
REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
3) ELECTRTCAL PERM|TTTNG AND TNSPECTIONS BY COLORADO STATE ELECTRIC
BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION.
ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION &
CERTI FICATE OF OCCU PANCY.
4) ALL EXTERIOR LIGHTING TO BE DOWNCAST AND SHIELDED.
5) WILDFIRE MITIGATION RECOMMENDATIONS: SHALL COMPLY WITH WILDFIRE
MITIGATION AND DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO
STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. PLEASE REFER TO THE
GARFIELD COUNry COMMUNIry DEVELOPMENT WEBSITE FOR ADDITIONAL
INFORMATION.
6) FIELD VERIFY NEW CONSTRUCTION: OPEN HOLE SOILS REPORT MAY PERTAIN AT
FOOTING INSPECTION PRIOR TO CONCRETE POUR. PROVIDE GEOTECHNICAL
REPORT TO BUILDING INSPECTOR. 1,500 SOIL BEARING
7) SEPTIC SYSTEM REVIEW / APPROVALS: PRIOR TO FINAL BUILDING INSPECTION &
CERTIFICATE OF OCCUPANCY PROVIDE FINAL APPROVAL / SIGN-OFF FROM
GARFIELD COUNry'S PUBLIC HEALTH DEPT.
8) BLOWER DOOR TEST tS REOUTRED. MUST SUBMTT BLOWER DOOR TEST REPORT
TO GARFIELD COUNry COMMUNITY DEVELOPMENT DEPT. OFFICE PRIOR TO
SCHEDULING FINAL BUILDING INSPECTION / C.O. FINAL. SEE PLAN ATTACHMENT
FOR SMALL HABITABLE STRUCTURES.
9) PRESCR|pTtVE PATH WITH 2018 |ECC TABLE R402.1.2 CHOSEN FOR ENERGY
COMPLIANCE OF THE HOME. NEW HOMES TO HAVE WHOLE-HOUSE
MECHANICAL VENTILATION SYSTEM INSTALLED (2015 IRC TABLE m1507.3.3(1)
AND (2)AS STAMPED ON COVER SHEET)
,$
N
$
s'