Loading...
HomeMy WebLinkAboutCorrespondence - Battlement Mesa Service Association,&r;,Service Association ATTLEMENT MEgA Ytrftlt ARCHITECTTIRAL REVIEW COMMITTEE (ARC) NEW HOME CONSTRUCTION APPLICATION StreetLoril Block # AJ lA Owner: General Contractor: Architect Or Draftsman: Name: !-! Address: Telephone: Cell Phone E-mail: Name Address: Telephone: Cell Phone E-mail Name LCity:CD zip,8t t'1,-r*b"r,A/iA G) zip, ,?l C.{L Number: h#/1 . U)WL City: Address: City:({) zip, tt Srt{ Teiephone: Celi Phone Nu-ber l4i1 rlI E-mail 7 Section L As the Architectural Standards are modified periodically and these modifications may not be listed on this Application, it is the responsibility of the owner or his authorized agent(s) to ensure that the design and construction of a project conform to the requirements of che Architectural Standards. The intent of this Application is to provide a guide for an olvner or the architect to ensure a complete submittal. However, this application shall be signed, dated and submitted rvith the plans package in order for the preliminary submittal to be deemed complete by the Architecrural Review Committee. Failure to do so may delay review of the proposal. The Architectural Standards are comprehensive in scope for designing homes within Battlement Mesa. Please review the Architectural Standards carefully prior to presenting a submittal to the Architectural Review Committee. Excavation at site mav not commence until the ARC has aporoved construction and foundation olans. ATTLEMENT MESA \-bdt&!Ged This portion of the Application Form is to be completed by the Architecmral (emnitrsg (not tle Applicant) CONDITIONS OF APPROVAL or DISAPPROVAL 1. No sitework or building construction may proceed on any Lot (including no preliminary site clearing, grubbing, grade alteration, storing of material, foundation excavation, extension of underground utilities, etc.) until the project has received a Project approval from the Architecrural Committee and has been issued a building permit (as required by Garfield counry for new home or Renovation projects). 2. All general building, site improvements, landscaping and revegation to specifically include the front, side and rear yard areas for any Project shail be completed and shall have passed a Final Compliance Inspection no later than eighteen (lg) months after Pro)ect approval by the Architectural Committee. It is the responsibility of the owrer or builder to furnish the Architecrural Committee a copy of the Cenificate of Occupancy within one (l) week of issuance of the Cenificate of Occupancy. 3 If the selections of colors and/or landscaping plans are not included with rhis application they must be submitted for approval before any action is taken to install rhe missing items. JE7 =,Service Association 4 5 6 Aool-ication Aooroval (lnitials of Architectural Co &-1/zBy,tuwry Application Approved for Coostnrction subiect to the conditious: By Chairman Date Aoolication Denied (lnitials of Architectural Cornmitree Members) By, Application Denied for reason(s) stated above: By Chairman:Date: Fa u,rytHxx, ATTLEMEf{T lvtESlt Service Association Aprrl17,2025 Ideal LLC 2399 46 %Rd DeBeque, CO 81630 RE: 178 Eagle Ridge Dr Dear Ideal LLC, This letter is regarding your application to the Architectural Committee to build a new home in Eagle's Point. The Architectural Committee met on Wednesday, April 16,2025. Your application has been approved. Please contact Alex Morris if you have any questions 970-285-9432 Regards, fl,k^r/^* fry* Alondra Loya Admin Assistant Enclosure Tie Cblor*rJo J)nrrrn 401 Arroyo Drive , Eattlernent Mesa, (alorado 81635 FHoHfti g?0,285.9411 fl.xr 970.?85,96]l cmrrur FMSA@EattlementMesaColorada.com wxa: www,BQttlemenfMesaColorado,corn April 17,2025 Ideal LLC 2399 46 %Rd DeBeque, CO 81630 RE: 178 Eagle Ridge Dr Dear Ideal LLC, Congratulations on your new home construction approval in Eaeles Point! We would like to inform you and give you some guidelines while you're building your new home. Backflow All backflow prevention devices for cross connection control (which are a requirement of the District) must be installed and maintained at the owner's expense. Backflow prevention devices must be inspected and tested yearly by a District Approved Certified Cross Connection Technician. 2. Connect Permits You must come into the office to purchase connect permits, one for water/sewer and one for irrigation. The permit fee of $75 covers the cost of ONE trip to inspect all services. If more than one inspection trip is required, you will be billed $35.00 per trip. Plans must be submitted to the District for approval PRIOR to this permit being issued to insure compliance with the District Rules and Regulations. Connections and installations must be in accordance with the approved plans. The District requires a 48 hour notice for all inspections (excluding weekends and holidays). No inspections will be performed on weekends or holidays. All connections and lines must be fully exposed for inspections. All service connections must be inspected and approved prior to the District providing water and sewer services. 3. Meters You are responsible for purchasing the water meter and, if needed, all the components 4, Landscaping Once your new home is built, you must fill out an Architectural Committee Application and have pictures/diagrams of your landscaping. The Architectural Committee meets on the first and third Wednesday of every month. Architectural Applications are due on the Thursday before the meeting. (i.e. Meeting is on July 20tr', applications are due on July rcfi,2022) Once your landscapingfirrigationftackflow is inspected and approved $3,500.00 of your deposit will be refunded. 5. Battlement Mesa Service Association will need a copy of your Certificate of Occupancy Please feel free to contact our office ifyou have any questions. Regards, Alondra Loya Office Coordinator