Loading...
HomeMy WebLinkAboutConditions of PermitCONDITION OF PERMIT BLRE-05 -25-9259 N ew si ns r " t",,]ffiffi:ifi.ached sa rase fBD CR 230, Rifle Sec 34, Twns06, R94 - 217534300219 1) ALL WORK SHALL COMply W|TH THE 201s TNTERNATTONAL RESTDENTIAL CODE (l.R.C.)AND 2018 I NTERNATIONAL ENERGY CONSERVATION CODE (I. E.C.C.) 2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNry BUILDING REQUIREMENTS". NUMBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRTCAL pERMTTTTNG AND TNSPECTTONS BY COLORADO STATE ELECTRTC BOARD. ELECTRICAL ROUGH.IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 4) ALL EXTERIOR LIGHTTNG TO BE DOWNCAST AND SHIELDED. 5) PROPANE FUEL TYPE SPECIFIED: SEE GUIDE ATTACHED. 6) WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE RECOMMENDATIONS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNITY DEVELOPMENT WEBSITE FOR ADDITIONAL I N FORMATION. 7) OPEN HOLE SOTLS REPORT rS REOUTRED AT FOOTTNG INSPECTION AND PRrOR TO ANY CONCRETE POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR. 1,500 PSF soil bearing. Provide compaction report for any structural fill. 8) ALL HlcH STRENGTH BOLTTNG AND FrELD WELDING REOUIRES SPECTAL INSPECTOR. PROVTDE APPROVAL REPORT AT FRAMING INSPECTION. 9) SEPTIC SYSTEM REVIEW / APPROVAL: PRIOR TO FINAL BUILDING & CERTIFICATE OF OCCUPANCY PROVIDE FINAL APPROVAL / SIGN OFF FROM GARFIELD COUNTY'S PUBLIC HEALTH DEPT. 10) BLOWER DOOR TEST tS REOU|RED. MUST SUBMIT BLOWER DOOR TEST REPORT TO GARFIELD COUNry COMMUNITY DEVELOPMENT DEPT. OFFICE PRIOR TO SCHEDULING FINAL BUILDING INSPECTION / C.O. FINAL. 1 'l) PRESCR|pTtVE PATH USrNG 2018 tECC TABLE R402.1.2 lS CHOSEN FOR ENERGY COMPLIANCE OF THIS HOME. MANUAL J REPORT ALSO ATTACHED FOR REFERENCE. ALL NEW HOMES TO HAVE WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM INSTALLED (2015 IRC TABLE m1507.3.3(1)AND (2)SHOWN ON COVER SHEET. a R \ .\ N