Loading...
HomeMy WebLinkAboutBlower Door TestAccurate lnsulation Permit#: Job lnfornration Builder: A) V t"lCo vlt\a^Community:Lot: Adciress: qM 6r^nlu Qrl r(o City:State:zip: Air Leakage Test Results Passing results must meet either the Perfurmance, Prescriptive, or ERI Method Prescriptive Method- The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour at pressure of 0.2-inch w. g. {50 Pascals) in Climate Zones 1 and 2, Performance or ER! Method-The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding the selected ACH (50) value, as shown on Form R405-202 (Performance) or R406-2020 (ERl), section labeled as infiltration, subsection ACH50. ACH (50) specitied on Form R405-202-Energy Calc {Performance) or R406-2020 (ERl): 3 /kt( + cFnq (50) /o 3p Buildifrg Volume 4.Y ACH (s0) WPASS Method for Calculating building volume: o Retrieved frorn architectural plans o Code software calculated {iiaa measu red and calcu lated During testing: !. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infilitration control measures. 2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures. 3. lnterior doors, if installed at the time of the test, shall be open. 4. Exterior doors for continous ventilation systems and heat recovery ventilatiors shall be closed and sealed. 5. Heating and cooling systems, if installed at the time of the tst, shall be turned off. 6. Supply and return registers, if installed at the time of the test, shall be fu lly open Testing Company company Name: Accurate lnsulation Phone: 970-296-004I Signature of Date of re*: _?J_!JJS_ Printed Name of Tester: Rich Romero License/Certifi cation : 5072554 lss u i ng Auth ority: Building Performa nce lnstitute