Inspection Report
Date of Inspection: 05.27.2025
Project Name: Wooden Deer Addition
Job Site Address: 699 Wooden Deer, Carbondale CO
Permit/Drawing #: BLRE-11-24-8989
Welding Contractor: Eagle Welding Ornamental
General Contractor: Owner
Inspection Narrative
Final Inspection Report:
Visual inspection of all welded joints including column to base plate, bucket to column, web stiffeners and field
installed column to embeds. Verification of welder performance qualification, welding process, interpass
cleaning and weld techniques were all found to be acceptable.
To the best of my knowledge all welds appear to be in conformance with AWS D1.1 Structural Welding Code
2020.
End of Report