Loading...
HomeMy WebLinkAboutBolt Inspection ReportConklin Welding & Fabrication, INC. 1188 CR 116 Glenwood Springs, CO 81601 C: 231.629.6252 Inspection Report Date of Inspection: 05.27.2025 Project Name: Wooden Deer Addition Job Site Address: 699 Wooden Deer, Carbondale CO Permit/Drawing #: BLRE-11-24-8989 Welding Contractor: Eagle Welding Ornamental General Contractor: Owner Inspection Narrative Final Inspection Report: Visual inspection of all welded joints including column to base plate, bucket to column, web stiffeners and field installed column to embeds. Verification of welder performance qualification, welding process, interpass cleaning and weld techniques were all found to be acceptable. To the best of my knowledge all welds appear to be in conformance with AWS D1.1 Structural Welding Code 2020. End of Report Inspector: Eric Conklin CW121052071 QC1 Exp. 51112027 A ® Cri 1 klin 071 1 EXP. 5/1/2027 Page 1 of 1