Loading...
HomeMy WebLinkAboutCommcheck ReportCOMch eck Software Version COMcheckWeb Envelope Gompl iance Certificate Project lnformation Energy Code: Project Title: Location: Climate Zone: Project Type: Veftical Glazing / Wall Area: Permit No. Performance Sim, Specs: Construction Site: Rifle Garfield County Airport (RlL) Rifle, Colorado 81650 Building Area 90.1 (2016) Standard Vantage Aviation RIL - A2 Rifle, Colorado 5b New Construction 6% BLCO-06-2s-9329 EnergyPlus 8. 1.0.009 ( EPW: USA_CO_G rand.J u nction- Wa I ker. Field .l 247 60 _TMY3.epw) Owner/Agent: Kyle Cassidy Vantage Aviation 228 Park Ave S, PMB 73997 New York, New York 10003 949-701-0759 kcassidy@va ntageair.com Designer/Contractor: Dave Leopold VJS / Haselden, Vantage Aviation, a Joint Venture 6950 S. Potomac Centennial, Colorado 80112 720-450-6473 DaveLeopold@haselden.com Floor Area 1-HANGAR (Transportation) : Nonresidential 2-FBO (Office) : Nonresidential 25081 5726 Envelope Assemblies Assembly Gross Area Cavityor R-Value Perimeter Cont. R-Value Proposed U-Factor Budget U- Factorrul Roof: Other Metal Building Roof, [Bldg, Use 1 - HANGAR] (b) Floor: Unheated Slab-On-Grade, Vertical 2 ft., IBldg. Use ]. - HANGAR] (d) Roof: lnsulation Entirely Above Deck, IBldg, Use 2 - FBO] Floor: Unheated Slab-On-Grade, Vertical 2 ft., IBldg, Use 2 - FBOI (d) NORTH N,PEMB: Other Metal Building Wall, [Bldg. Use 1 - HANGAR] (b) N.WL: Metal Building Wall, Single Layer Mineral Fiber (compressed at girt), [Bldg, Use 1 - HANGAR] N.ST: Steel-Framed, 16in. o.c., IBldg. Use 2 - FBO] N.GL.1.: Metal Frame: Fixed, Perf. Specs,: Product lD AG451T SGSNX6227#2_Clear, SHGC 0.24, W 0.54, IBldg. Use 2 - FBol (c) N.HM: Steel-Framed, L6in. o.c., IBldg. Use 2 - FBO] N.GL: Metal Frame: Fixed, Perf, Specs.: Product lD AG45i.T SGSNX6227#2_Clear, SHGC 0.24, VT 0.54, IBldg. Use 2 - FBol (c) N.HM-A: Steel-Framed, L6in. o,c,, IBldg. Use 2 - FBO] N,GL-A: Metal Frame: Fixed, Perf. Specs.: Product lD AG451T SGSNX6227#2_Clear, SHGC 0.24, VT 0.54, IBldg. Use 2 - 662 24337 5709 35'l 2239 38 721 30 743 388 206 60 10.0 0.028 0.540 0.032 0.540 0.059 1 ."t 80 0.060 0.390 0.060 0.390 0.060 0.390 0.037 0.520 0.032 0.520 0.050 0.050 0.055 0.380 0.055 0.380 0.055 0.380 30.0 10.0 0.0 19.0 0.0 7.5 19.0 7 .5 19.0 7.5 Project Title: Vantage Aviation RIL - A2 Data filename: Report date: 09/05/25 Page 1 of L0 Assembly Gross Area or Perimeter Cavity R-Value Cont, R-Value Proposed U-Factor Budget U- Factort"r FBOI (c) N,ST-B: Steel-Framed, l-6in. o.c., IBldg. Use 2 - FBO] EAST E.VM (PEMB): Other Metal Building Wall, IBldg. Use 1 - HANGAR] (b) E.HD: lnsulated Metal, Non-Swinging, lBldq. LJse L - HANGARI E.GL.L: Metal Frame: Fixed, Perf. Specs.: Product lD AG451T SGSNX6227#2_Clear, SHGC 0.24, VT 0.54, [Bldg. Use 1 - HANGAR] (c) E,HM: Steel-Framed, 16in, o,c., IBldg. Use 2 - FBO] E.GL: Metal Frame: Fixed, Perf. Specs.: Product lD AG45LT SGSNX6227#2_Clear, SHGC 0.24, VT 0.54, IBldg. Use 2 - FBOI (c) E.ED: Glass (over 50% glazing): Metal Frame, Entrance Door, Perf. Specs.: Product lD TBD, SHGC 0.24, VT 0,54, lBldg. Use 2 - FBol (c) E.ST: Steel-Framed, L6in. o.c,, IBldg. Use 2 - FBO] E.HM-A: Steel-Framed, 16in. o.c,, [Bldg. Use 2 - FBO] E.GL-A: Metal Frame; Fixed, Perf, Specs,: Product lD AG451T SGSNX6227#2_Clear, SHGC 0.24, VT 0.54, IBldg. Use 2 - FBOI (c) SOUTH S.VM (PEMB): Other Metal Building Wall, IBldg. Use ]. - HANGAR] (b) S.WL (PEMB): Metal Building Wall, Single Layer Mineral Fiber (compressed at gift), [Bldg. Use 1 - HANGAR] S.HM: Steel-Framed, 16in. o.c., IBldg. Use 2 - FBO] S.GL: Metal Frame: Fixed, Perf. Specs.: Product lD AG451T SGSNX6227#2_Clear, SHGC 0.24, VT 0.54, lBldg. Use 2 - FBol (c) S.ED: Glass (over 50% glazing): Metal Frame, Entrance Door, Perf. Specs.: Product lD TBD, SHGC 0.24, VT 0.54, [Bldg. Use 2 - FBol (c) S.ST-A: Steel-Framed, 16in. o.c., IBldg. Use 2 - FBO] WEST W.VM (PEMB): Other Metal Building Wall, lBldg. Use 1 - HANGAR] (b) W.GL.2: Metal Frame: Fixed, Perf. Specs.: Product lD AG451T SGSNX6227#2_Clear, SHGC 0.24, VT 0.54, IBldg. Use L - HANGAR] (c) W.5D.1: lnsulated Metal, Swinging, [Bldg. Use 1- HANGAR] W.OD: lnsulated Metal, Non-Swinging, [Bldg. Use 1- HANGAR] W.WL: Metal Building Wall, Single Layer Mineral Fiber (compressed at girt), [Bldg. Use 1 - HANGAR] W.HM: Steel-Framed, 16in. o.c., IBldg, Use 2 - FBO] W.GL: Metal Frame: Fixed, Perf. Specs.: Product lD AG451T SGSNX6227#2_Clear, SHGC 0.24, VT 0.54, IBldg. Use 2 - FtsOl (c) W.SD: lnsulated Metal, Swinging, lBldg. Use 2 - FBOI W.ST: Steel-Framed, L6in. o.c., IBldg. Use 2 - FBO] W,GL.I: Metal Frame: Fixed, Perf. Specs.: Product lD AG45LT SGSNX6227#2_Clear, SHGC 0.24, W 0.54, [Bldg. Use 2 - FBol (c) W,HM-A: Steel-Framed, 16in. o.c., IBldg. Use 2 - FBO] W.ED-A: Glass (over 50% glazing): Metal Frame, Entrance Door, Perf. Specs.: Product lD TBD, SHGC 0,24, VT 0.54, tBldg, Use2-FBOI(c) W.ST-A: Steel-Framed, 16in. o.c., IBldg. Use 2 - FBO] 4559 43 548 138 100 201 7677 288 48 0.059 1.180 0.060 0.390 0.600 0.060 0.059 0.390 0.050 0.050 0.055 0.380 0.680 0.055 0.050 0.380 172 7683 5030 217 328 1s7 60 205 108 24 391 30 19.0 19.0 0.060 0.059 0,300 0.390 0.060 0.390 0.600 0.060 0.060 0.390 0.055 0.050 0.310 0.380 0.055 0.380 0.680 0.055 0.055 0.380 0.370 0.310 0.050 0.055 0.380 7.5 7.5 0.0 7.5 0.0 7.5 19.0 7 .5 19.0 7 .5944 256 45 19.0 7 .5 0.0 19.0 0.0 19.0 0.380 0.170 1.180 835 45 0.060 0.390 0.380 0.060 0.390 0.060 0.600 0.060 0.370 0.055 0.380 19.0 7.5 19.0 7 .5139 83 0.055 0.680 0.05519.0 7 .5 Vantage Aviation RIL - A2 76 Project Title: Data filename Report date: 09/05/25 Page 2 of 10 (a) Budget U-factors are used for software baseline calculations ONLY, and are not code requirements. (bi'Other' components require supporting documentation for proposed U-factors. (c) Fenestration product performance must be certified in accordance with NFRC and requires suppofting documentation (d) Slab-On-Grade proposed and budget U-factors shown in table are F-factors. Envelope Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been designed to meet the 90,1 (2016) Standard requirements in COMcheck Version COMcheckWeb and to comply with any applicable man-datory requirements listed in the lnspection Checklist. Hauser Architects, P.C. /s/ Hauser Architects, P.C. 9'5'2025 Signature Date Envelope PASSES: Design O.4olo better than code Project Title: Vantage Aviation RIL - 42 Data filename: Report date: 09/05/25 Page 3 of 10 COMch eck Software Version COMcheckWeb lnspection Checklist Energy Code: 90.1- (2016) Standard Requirements: 0.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user eertifies that a code requirement will be met and how that is documented, or that an exception is being clainrecl, Wlrele r:ornpliarrce is iferlizerl in a selraral.e taltle, a refererrre tu Lhal tal)le is prnviclecl. Additional Comments/Assumptions: Section # & Req.lD Plan Review Complies?Comments/Assumptions 4.2,2, 5,4.3.1,1, 5.7 lPRll1 Plans and/or specifications provide all ,EComplies information with which compliance rEDoes Not can be determined for the buildino envelope and document *[ui" " ENot observable exceptions to the standard are L-JNot Applicable claimed, l 4.2.2, 8.4.1.1, 8.4.L.2, 8.7 lPR6l2 determined for the electrical systems and equipment and document where exceptions are claimed, Feeder connectors sized in accordance with approved plans and branch circuits sized for maximum drop of 3%. lComplies lEDoes Not ENot Observable INot Applicable I Plans, specifications, and/or I calculations provide all information lwith which compliance can be ln buildings > 2,500 ft2, any enclosed rEComplies spaces directly under a roof with lEDoes Not ceiling heights > 1"5 ft. and used as an -.,_. ^,oricel toudy, atrium, .oniorrril *- " r!flot observable corridor, storage (including 'LlNot Applicable nonrefrigerated warehouse), , gymnasium,fitness/exercisearea,, playing area, gymnasium seating area, convention exhibit/event space, : courtroom, automotive service, fire : -!-+i^^ ^^^i^^ F^^m m^^r r+^-h rFi^^Jru!rvrr srryrr19 rvvrrr, rrrqr rurqLrur rr 19 corridor/transition and bay areas, : retail, library reading and stack areas, ; distribution/sorting area, I transportation baggage and seating areas, or workshop, the following requirements apply: The daylight zone under skylights is >= half the floor area and (a) the skylight area to daylight zorre is >= 3 percent with a skylight W >= 0.40 or (b) the minimum skylight effective aperture >= 1 percent. The skylights have a measured haze value > 90 percent. 5.5.4.2.3 lPR7l2 t Hi lm ct (Tier L)2 Medium lm ct (Tier 2)3 (Tier 3)Low Project Title: Vantage Aviation RIL - A2 Data filename: Report date: 09/05/25 Page 4 of 10 Field Verified Value Complies?Comments/Assumptions Section# & Req,lD Footing / Foundation lnspection Plans Verified Value lnstalled below-grade wall insulation type and R-value consistent with insulation specifications reported in plans and COMcheck reports. [lComplies EDoes Not ENot observable see the Envelope Assemblies table for values. R-R- iENot Applicable 4.2.4 lFol12 lnstalled slab-on-grade insulation type and R-value consistent with insulation specifications reported in plans and COMcheck reports. EDoes Not itable for values' ENot observable i llNot Applicable i R-_ ! Unheated ! Heated R-tes iSee the Envelope Assemblies4.2.4 lFo3l2 ! Unheated ! Heated ;EDoes Not 'ENot Observable :INot Applicable tes5.8.r..2 lFo4l2 Slab edge insulation installed per manufactu rer's instructions. lComplies EDoes Not ENot Observable Eruot npplicable ft ft See the Envelope Assemblies table for values. 5.5.3.5 lFo5l2 Slab edge insulation depth/length. I Exterior insulation protected j against damage, sunlight, lmoisture, wind, landscaping and I equipment maintenance lactivities. !Complies flDoes Not ENot Observable ENot Applicable 5,8,1.7 lFo6l1 lnsulation in contact with the ground has <=0.3% water absorption rate per ASTM C272 'EComplies iEDoes Not ENot Observable !Not Applicable 5,8.1.7.3 lFo7l1 Bottom surface of floor structures incorporating radiant heating insulated to >=R-3.5. ilComplies lEDoes ttot lENot observable iENot Applicable 'See the Envelope Assemblies ',table for values. l R-R-6.4.4.t.5 lFo1113 Additional Comments/Assumptions : 1 Hiqh lmpact (Tier i.)2 Medium lmpact (Tier 2)3 Low lmpact (Tier 3) Project Title: Vantage Aviation RIL - A2 Data filename: Report date: 09/05/25 Page 5 of 10 Section # & Reo.lD Framing / Rough-ln lnspection Plans Verified Value Field Verified Value Complies?Comments/Assumptions Factory-built and site-assembled I fenestration and doors are I ilabeled or certified as meeting airl leakage requirements I EComplies nDoes Not !Not Observable !Not Applicable 5.4.3.2 lFnrlr have self-closing devices, and are :>=7 ft apart (>= 16 ft apart for:adjoinging floor area >= 40000 rsg.ft.). Vestibule floor area <=7 is0 sq.ft, or 2 percent of the I adjoining conditioned floor area. 5.4.3.4 lFRcp Vestibules are installed wlrere building cntroncca separatc conditioned space from the exterior, and meet exterior envelope requirements, Doors !Complies nDoes Not ENot Observablc ENot Applicable 5.5.4.3a :Vertical fenestration U-Factor lFRSll :EComplies ,Eooes trtot LlNot Observable :ENot Applicable U U-lSee the Envelope Assemblies table for values. 5.5.4.3b Skylightfenestration U-FactorlFRgll . .IComplies ilOoes trtot :!trtot Observable ;ENot Applicable U U-See the Envelope Assemblies ;table for values. 5.5.4.4.I lVertical fenestration SHGC value,lFRloll I ;!complies 'nDoes lrtot ;Etrtot Observable iEruot npplicabte SHGSHGC:See the Envelope Assemblies table for values. EComplies EDoes Not nNot Observable nNot Applicable SHGC:-SHGC:5.5.4.4.2 :Skylight SHGC value. lFR1L11 :See the Envelope Assemblies table for values. 5.8.2.1, s.8.2.3, 5.8.2.4, 5.8,2.5 lFR1212 EComplies EDoes Not ENot Observable ENot Applicable I Fenestration products rated (U-jfactor, SHGC, and W) in accoruance witrt NrKL oi energy code defaults are used. I Fenestration and door products are labeled, or a signed and dated certificate listing the U- ,factor, SHGC, VT, and air leakage rate has been provided by the , manufacturer, EComplies lDoes Not ENot Observable ENot Applicable 5.8.2.2 lFR13l1 U-factor of opaque doors associated with the building thermal envelope meets requirements. ,U- ll Swinging ! Nonswinging ,EComplies :EDoes Not .LNot Observable rENut Applicable U-5,5.3.6 lFR14l2 lSee the Envelope Assemblies : table for values.! Swinging ! Nonswinging ;Corrtinuous air barrier is I wrapped, sealed, caulked, gasketed, and/or taped in an approved manner, except in semiheated spaces in c!!rnate zones L-6. EDoes Not ENot observable INot Applicable Cornplies5.4.3.1 lFR15l1 Additional Comments/Assumptions: 1 2lmct (Tier 1)H Medium lmpact (Tier 2)3 Low lmpact (Tier 3) Vantage Aviation RIL - A2Project Title: Data filename Report date: 09/05/25 Page 6 of 10 Comments/Assumptions Section # & Req.lD Rough-ln Electrical Inspection Complies? At least 50o/o of all L25 volt 15- and 20-Amp receptacles are controlled by an automatic control device. !Complies EDoes Not ENot Observable ,ENot Applicable 8.4.2 lELlol2 New buildings have electrical energy use measurement devices installed. Where tenant spaces exist, each tenant is monitored separately. ln buildings with a digital control system the energy use is transmitted to to nComplies flDoes Not ENot Observable ENot Applicable and displayed 8.4.3 lELlLj2 Additiona I Com ments/Assumptions : 2 Medium lmpact (Tier 2)3 Low lmpact (Tier 3)1 ht (Tier 1)H Project Title: Vantage Aviation RIL - A2 Data filename: Report date: 09/05/25 Page 7 of t0 Section # & Req.lD lnsulation lnspection Plans Verified Value Field Verified Value Complies?Comments/Assumptions :lnstalled roof insulation type and i , R-value consistent with insulation i rspecifications reported in plans i rand COMcheck reports. For some i ceiling systems, verification may ]tneed to occur during Framing lnsperl ion. i R-_ ! Above deck fl uetal fl Attic tEcomplies nDoes Not INot Observable jDruot nppticabte R-4.2.4 ltN2ll see the Envelope Assemblies table for values.! Above deck ! Metal n Attic 5,8,1,2, 5,8,1,3 ltN311 Roof insulation installed per manufacturer's instructions. Blown or poured loose-fill insulation is installed only whe lDoes Not !Not Observable ElNot Applicable re the ce slo s T2 lies I lnstalled above-grade wall insulation type and R-value consistent with insulation specifications reported in plans I Mass n Metal ! Steel ! Wood : R-_ I Mass ! Metal ! Steel ! Wood rEComplies rEooes ruot ENot Observable rEruot applicable R-See the Envelope Assemblles table for values. and COMcheck reports. 4.2.4 ltN6ll : Above-grade wall insulation installed per manufacturer's instructions. EComplies lDoes Not INot Observable ENot Applicable 5.8.1.2 ltN711 R-_ ! Mass ! Steel ! Wood R-_ ! Mass , I Steel ! Wood 4.2.4 ltN812 See the Envelope Assemblies ',table for values. ,ENot observable i :Eruot applicable :specifications reported in plans ; and COMcheck reports. lnstalled floor insulation type and R-value consistent with insulation . Building envelope insulation is ,labeled with R-value or insulation :certificate lras beerr provided :listing R-value and other relevant I data. EComplies EDoes Not !Not Observable !Not Applicable 5.8.1.1 ltNlo12 I Building envelope insulation extends over the full area of the component at the proposed rated iR or U value. l nComplics lDoes Not ENot Observable nNot Applicable 5.8.r..9 ltN1812 nComplies lDoes Not !Not Observable !Not Applicable ,Eaves are baffled to deflect air to above the insulation 5.8.1.4 ltN1112 :lnsulation is installed in :substantial contact with the : inside surface separating , conditioned space from i unconditional space. !Complies nDoes Not nNot Observable !Not Applicable 5,8,1.5 ltN1212 , Recessed equiprnent ir"rstalled in I building envelope assemblies : does not compress the adjacent , insulation. nConrplies nDoes Not INot Observable INot Applicable 5.8.1.6 llN1312 tlComplies nDoes Not ENot Observable , ENot Applicable ' 5.8.1.7.r. ttN r5l. ,Attics and mechanical rooms ihave insuiaiion proiecieci where adjacent to attic or equipment access. 1 High lmpact (Tier 1)2 Medium lmpact (Tier 2)3 Low lmpact (Tier 3) Vantage Aviation RIL - A2Project Title: Data filename Report date: 09/05/25 Page 8 of 10 do not lntsrfGi€ l-lComplies Dooes Not EINptOBcruable ElNotAppli,eable Addltlonal ebmme.nts-/Asaumptlons: Fro-ieetTltl*'lhntag€:A\r-iatiotl RIL.A? Bata filenar.ne: Rsport dat* 0s/05n5 Pag€ Iof 10 t 5,4.3,5 IFI1P Weatherseals installed on all loading dock cargo doors ln Cllmate Zones 4- 8. Ad..dlt- lo[ol Qorfi msntl*/Aa.surfi ,ptlon*r Project Title: Vantage. Avi'atian RIL - Aa Data filenarne: Report date 09/05/25 Page 10of X0