HomeMy WebLinkAboutCommcheck ReportCOMch eck Software Version COMcheckWeb
Envelope Gompl iance Certificate
Project lnformation
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
Veftical Glazing / Wall Area:
Permit No.
Performance Sim, Specs:
Construction Site:
Rifle Garfield County Airport (RlL)
Rifle, Colorado 81650
Building Area
90.1 (2016) Standard
Vantage Aviation RIL - A2
Rifle, Colorado
5b
New Construction
6%
BLCO-06-2s-9329
EnergyPlus 8. 1.0.009 ( EPW: USA_CO_G rand.J u nction-
Wa I ker. Field .l 247 60 _TMY3.epw)
Owner/Agent:
Kyle Cassidy
Vantage Aviation
228 Park Ave S, PMB 73997
New York, New York 10003
949-701-0759
kcassidy@va ntageair.com
Designer/Contractor:
Dave Leopold
VJS / Haselden, Vantage Aviation, a
Joint Venture
6950 S. Potomac
Centennial, Colorado 80112
720-450-6473
DaveLeopold@haselden.com
Floor Area
1-HANGAR (Transportation) : Nonresidential
2-FBO (Office) : Nonresidential
25081
5726
Envelope Assemblies
Assembly Gross Area Cavityor R-Value
Perimeter
Cont.
R-Value
Proposed
U-Factor
Budget U-
Factorrul
Roof: Other Metal Building Roof, [Bldg, Use 1 - HANGAR] (b)
Floor: Unheated Slab-On-Grade, Vertical 2 ft., IBldg. Use ]. -
HANGAR] (d)
Roof: lnsulation Entirely Above Deck, IBldg, Use 2 - FBO]
Floor: Unheated Slab-On-Grade, Vertical 2 ft., IBldg, Use 2 -
FBOI (d)
NORTH
N,PEMB: Other Metal Building Wall, [Bldg. Use 1 - HANGAR] (b)
N.WL: Metal Building Wall, Single Layer Mineral Fiber
(compressed at girt), [Bldg, Use 1 - HANGAR]
N.ST: Steel-Framed, 16in. o.c., IBldg. Use 2 - FBO]
N.GL.1.: Metal Frame: Fixed, Perf. Specs,: Product lD AG451T
SGSNX6227#2_Clear, SHGC 0.24, W 0.54, IBldg. Use 2 -
FBol (c)
N.HM: Steel-Framed, L6in. o.c., IBldg. Use 2 - FBO]
N.GL: Metal Frame: Fixed, Perf, Specs.: Product lD AG45i.T
SGSNX6227#2_Clear, SHGC 0.24, VT 0.54, IBldg. Use 2 -
FBol (c)
N.HM-A: Steel-Framed, L6in. o,c,, IBldg. Use 2 - FBO]
N,GL-A: Metal Frame: Fixed, Perf. Specs.: Product lD AG451T
SGSNX6227#2_Clear, SHGC 0.24, VT 0.54, IBldg. Use 2 -
662
24337
5709
35'l
2239
38
721
30
743
388
206
60
10.0
0.028
0.540
0.032
0.540
0.059
1 ."t 80
0.060
0.390
0.060
0.390
0.060
0.390
0.037
0.520
0.032
0.520
0.050
0.050
0.055
0.380
0.055
0.380
0.055
0.380
30.0
10.0
0.0
19.0
0.0
7.5
19.0 7 .5
19.0 7.5
Project Title: Vantage Aviation RIL - A2
Data filename:
Report date: 09/05/25
Page 1 of L0
Assembly Gross Area
or
Perimeter
Cavity
R-Value
Cont,
R-Value
Proposed
U-Factor
Budget U-
Factort"r
FBOI (c)
N,ST-B: Steel-Framed, l-6in. o.c., IBldg. Use 2 - FBO]
EAST
E.VM (PEMB): Other Metal Building Wall, IBldg. Use 1 -
HANGAR] (b)
E.HD: lnsulated Metal, Non-Swinging, lBldq. LJse L - HANGARI
E.GL.L: Metal Frame: Fixed, Perf. Specs.: Product lD AG451T
SGSNX6227#2_Clear, SHGC 0.24, VT 0.54, [Bldg. Use 1 -
HANGAR] (c)
E,HM: Steel-Framed, 16in, o,c., IBldg. Use 2 - FBO]
E.GL: Metal Frame: Fixed, Perf. Specs.: Product lD AG45LT
SGSNX6227#2_Clear, SHGC 0.24, VT 0.54, IBldg. Use 2 -
FBOI (c)
E.ED: Glass (over 50% glazing): Metal Frame, Entrance Door,
Perf. Specs.: Product lD TBD, SHGC 0.24, VT 0,54, lBldg. Use 2
- FBol (c)
E.ST: Steel-Framed, L6in. o.c,, IBldg. Use 2 - FBO]
E.HM-A: Steel-Framed, 16in. o.c,, [Bldg. Use 2 - FBO]
E.GL-A: Metal Frame; Fixed, Perf, Specs,: Product lD AG451T
SGSNX6227#2_Clear, SHGC 0.24, VT 0.54, IBldg. Use 2 -
FBOI (c)
SOUTH
S.VM (PEMB): Other Metal Building Wall, IBldg. Use ]. -
HANGAR] (b)
S.WL (PEMB): Metal Building Wall, Single Layer Mineral Fiber
(compressed at gift), [Bldg. Use 1 - HANGAR]
S.HM: Steel-Framed, 16in. o.c., IBldg. Use 2 - FBO]
S.GL: Metal Frame: Fixed, Perf. Specs.: Product lD AG451T
SGSNX6227#2_Clear, SHGC 0.24, VT 0.54, lBldg. Use 2 -
FBol (c)
S.ED: Glass (over 50% glazing): Metal Frame, Entrance Door,
Perf. Specs.: Product lD TBD, SHGC 0.24, VT 0.54, [Bldg. Use 2
- FBol (c)
S.ST-A: Steel-Framed, 16in. o.c., IBldg. Use 2 - FBO]
WEST
W.VM (PEMB): Other Metal Building Wall, lBldg. Use 1 -
HANGAR] (b)
W.GL.2: Metal Frame: Fixed, Perf. Specs.: Product lD AG451T
SGSNX6227#2_Clear, SHGC 0.24, VT 0.54, IBldg. Use L -
HANGAR] (c)
W.5D.1: lnsulated Metal, Swinging, [Bldg. Use 1- HANGAR]
W.OD: lnsulated Metal, Non-Swinging, [Bldg. Use 1- HANGAR]
W.WL: Metal Building Wall, Single Layer Mineral Fiber
(compressed at girt), [Bldg. Use 1 - HANGAR]
W.HM: Steel-Framed, 16in. o.c., IBldg, Use 2 - FBO]
W.GL: Metal Frame: Fixed, Perf. Specs.: Product lD AG451T
SGSNX6227#2_Clear, SHGC 0.24, VT 0.54, IBldg. Use 2 -
FtsOl (c)
W.SD: lnsulated Metal, Swinging, lBldg. Use 2 - FBOI
W.ST: Steel-Framed, L6in. o.c., IBldg. Use 2 - FBO]
W,GL.I: Metal Frame: Fixed, Perf. Specs.: Product lD AG45LT
SGSNX6227#2_Clear, SHGC 0.24, W 0.54, [Bldg. Use 2 -
FBol (c)
W,HM-A: Steel-Framed, 16in. o.c., IBldg. Use 2 - FBO]
W.ED-A: Glass (over 50% glazing): Metal Frame, Entrance
Door, Perf. Specs.: Product lD TBD, SHGC 0,24, VT 0.54, tBldg,
Use2-FBOI(c)
W.ST-A: Steel-Framed, 16in. o.c., IBldg. Use 2 - FBO]
4559
43
548
138
100
201
7677
288
48
0.059
1.180
0.060
0.390
0.600
0.060
0.059
0.390
0.050
0.050
0.055
0.380
0.680
0.055
0.050
0.380
172
7683
5030
217
328
1s7
60
205
108
24
391
30
19.0
19.0
0.060
0.059
0,300
0.390
0.060
0.390
0.600
0.060
0.060
0.390
0.055
0.050
0.310
0.380
0.055
0.380
0.680
0.055
0.055
0.380
0.370
0.310
0.050
0.055
0.380
7.5
7.5
0.0
7.5
0.0
7.5
19.0 7 .5
19.0 7 .5944
256
45
19.0 7 .5
0.0
19.0
0.0
19.0
0.380
0.170
1.180
835
45
0.060
0.390
0.380
0.060
0.390
0.060
0.600
0.060
0.370
0.055
0.380
19.0 7.5
19.0 7 .5139
83
0.055
0.680
0.05519.0 7 .5
Vantage Aviation RIL - A2
76
Project Title:
Data filename
Report date: 09/05/25
Page 2 of 10
(a) Budget U-factors are used for software baseline calculations ONLY, and are not code requirements.
(bi'Other' components require supporting documentation for proposed U-factors.
(c) Fenestration product performance must be certified in accordance with NFRC and requires suppofting documentation
(d) Slab-On-Grade proposed and budget U-factors shown in table are F-factors.
Envelope Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed envelope systems have been
designed to meet the 90,1 (2016) Standard requirements in COMcheck Version COMcheckWeb and to comply with any applicable
man-datory requirements listed in the lnspection Checklist.
Hauser Architects, P.C. /s/ Hauser Architects, P.C. 9'5'2025
Signature Date
Envelope PASSES: Design O.4olo better than code
Project Title: Vantage Aviation RIL - 42
Data filename:
Report date: 09/05/25
Page 3 of 10
COMch eck Software Version COMcheckWeb
lnspection Checklist
Energy Code: 90.1- (2016) Standard
Requirements: 0.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user eertifies that a code requirement will be met and how that is documented, or that an exception
is being clainrecl, Wlrele r:ornpliarrce is iferlizerl in a selraral.e taltle, a refererrre tu Lhal tal)le is prnviclecl.
Additional Comments/Assumptions:
Section
#
& Req.lD
Plan Review Complies?Comments/Assumptions
4.2,2,
5,4.3.1,1,
5.7
lPRll1
Plans and/or specifications provide all ,EComplies
information with which compliance rEDoes Not
can be determined for the buildino
envelope and document *[ui" " ENot observable
exceptions to the standard are L-JNot Applicable
claimed, l
4.2.2,
8.4.1.1,
8.4.L.2,
8.7
lPR6l2
determined for the electrical systems
and equipment and document where
exceptions are claimed, Feeder
connectors sized in accordance with
approved plans and branch circuits
sized for maximum drop of 3%.
lComplies
lEDoes Not
ENot Observable
INot Applicable
I Plans, specifications, and/or
I calculations provide all information
lwith which compliance can be
ln buildings > 2,500 ft2, any enclosed rEComplies
spaces directly under a roof with lEDoes Not
ceiling heights > 1"5 ft. and used as an -.,_. ^,oricel toudy, atrium, .oniorrril
*- " r!flot observable
corridor, storage (including 'LlNot Applicable
nonrefrigerated warehouse), ,
gymnasium,fitness/exercisearea,,
playing area, gymnasium seating
area, convention exhibit/event space, :
courtroom, automotive service, fire
:
-!-+i^^ ^^^i^^ F^^m m^^r r+^-h rFi^^Jru!rvrr srryrr19 rvvrrr, rrrqr rurqLrur rr 19
corridor/transition and bay areas,
:
retail, library reading and stack areas, ;
distribution/sorting area, I
transportation baggage and seating
areas, or workshop, the following
requirements apply: The daylight zone
under skylights is >= half the floor
area and (a) the skylight area to
daylight zorre is >= 3 percent with a
skylight W >= 0.40 or (b) the
minimum skylight effective aperture
>= 1 percent. The skylights have a
measured haze value > 90 percent.
5.5.4.2.3
lPR7l2
t Hi lm ct (Tier L)2 Medium lm ct (Tier 2)3 (Tier 3)Low
Project Title: Vantage Aviation RIL - A2
Data filename:
Report date: 09/05/25
Page 4 of 10
Field Verified
Value Complies?Comments/Assumptions
Section#
& Req,lD
Footing / Foundation
lnspection
Plans Verified
Value
lnstalled below-grade wall
insulation type and R-value
consistent with insulation
specifications reported in plans
and COMcheck reports.
[lComplies
EDoes Not
ENot observable
see the Envelope Assemblies
table for values.
R-R-
iENot Applicable
4.2.4
lFol12
lnstalled slab-on-grade insulation
type and R-value consistent with
insulation specifications reported
in plans and COMcheck reports.
EDoes Not itable for values'
ENot observable i
llNot Applicable i
R-_
! Unheated
! Heated
R-tes iSee the Envelope Assemblies4.2.4
lFo3l2 ! Unheated
! Heated
;EDoes Not
'ENot Observable
:INot Applicable
tes5.8.r..2
lFo4l2
Slab edge insulation installed per
manufactu rer's instructions.
lComplies
EDoes Not
ENot Observable
Eruot npplicable
ft ft See the Envelope Assemblies
table for values.
5.5.3.5
lFo5l2
Slab edge insulation
depth/length.
I Exterior insulation protected
j against damage, sunlight,
lmoisture, wind, landscaping and
I equipment maintenance
lactivities.
!Complies
flDoes Not
ENot Observable
ENot Applicable
5,8,1.7
lFo6l1
lnsulation in contact with the
ground has <=0.3% water
absorption rate per ASTM C272
'EComplies
iEDoes Not
ENot Observable
!Not Applicable
5,8.1.7.3
lFo7l1
Bottom surface of floor structures
incorporating radiant heating
insulated to >=R-3.5.
ilComplies
lEDoes ttot
lENot observable
iENot Applicable
'See the Envelope Assemblies
',table for values.
l
R-R-6.4.4.t.5
lFo1113
Additional Comments/Assumptions :
1 Hiqh lmpact (Tier i.)2 Medium lmpact (Tier 2)3 Low lmpact (Tier 3)
Project Title: Vantage Aviation RIL - A2
Data filename:
Report date: 09/05/25
Page 5 of 10
Section
#
& Reo.lD
Framing / Rough-ln lnspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
Factory-built and site-assembled I
fenestration and doors are I
ilabeled or certified as meeting airl
leakage requirements
I
EComplies
nDoes Not
!Not Observable
!Not Applicable
5.4.3.2
lFnrlr
have self-closing devices, and are
:>=7 ft apart (>= 16 ft apart for:adjoinging floor area >= 40000
rsg.ft.). Vestibule floor area <=7
is0 sq.ft, or 2 percent of the
I adjoining conditioned floor area.
5.4.3.4
lFRcp
Vestibules are installed wlrere
building cntroncca separatc
conditioned space from the
exterior, and meet exterior
envelope requirements, Doors
!Complies
nDoes Not
ENot Observablc
ENot Applicable
5.5.4.3a :Vertical fenestration U-Factor
lFRSll
:EComplies
,Eooes trtot
LlNot Observable
:ENot Applicable
U U-lSee the Envelope Assemblies
table for values.
5.5.4.3b Skylightfenestration U-FactorlFRgll .
.IComplies
ilOoes trtot
:!trtot Observable
;ENot Applicable
U U-See the Envelope Assemblies
;table for values.
5.5.4.4.I lVertical fenestration SHGC value,lFRloll I
;!complies
'nDoes lrtot
;Etrtot Observable
iEruot npplicabte
SHGSHGC:See the Envelope Assemblies
table for values.
EComplies
EDoes Not
nNot Observable
nNot Applicable
SHGC:-SHGC:5.5.4.4.2 :Skylight SHGC value.
lFR1L11
:See the Envelope Assemblies
table for values.
5.8.2.1,
s.8.2.3,
5.8.2.4,
5.8,2.5
lFR1212
EComplies
EDoes Not
ENot Observable
ENot Applicable
I Fenestration products rated (U-jfactor, SHGC, and W) in
accoruance witrt NrKL oi energy
code defaults are used.
I Fenestration and door products
are labeled, or a signed and
dated certificate listing the U-
,factor, SHGC, VT, and air leakage
rate has been provided by the
, manufacturer,
EComplies
lDoes Not
ENot Observable
ENot Applicable
5.8.2.2
lFR13l1
U-factor of opaque doors
associated with the building
thermal envelope meets
requirements.
,U-
ll Swinging
! Nonswinging
,EComplies
:EDoes Not
.LNot Observable
rENut Applicable
U-5,5.3.6
lFR14l2
lSee the Envelope Assemblies
: table for values.! Swinging
! Nonswinging
;Corrtinuous air barrier is
I wrapped, sealed, caulked,
gasketed, and/or taped in an
approved manner, except in
semiheated spaces in c!!rnate
zones L-6.
EDoes Not
ENot observable
INot Applicable
Cornplies5.4.3.1
lFR15l1
Additional Comments/Assumptions:
1 2lmct (Tier 1)H Medium lmpact (Tier 2)3 Low lmpact (Tier 3)
Vantage Aviation RIL - A2Project Title:
Data filename
Report date: 09/05/25
Page 6 of 10
Comments/Assumptions
Section
#
& Req.lD
Rough-ln Electrical Inspection Complies?
At least 50o/o of all L25 volt 15- and
20-Amp receptacles are controlled by
an automatic control device.
!Complies
EDoes Not
ENot Observable
,ENot Applicable
8.4.2
lELlol2
New buildings have electrical energy
use measurement devices installed.
Where tenant spaces exist, each
tenant is monitored separately. ln
buildings with a digital control system
the energy use is transmitted to to
nComplies
flDoes Not
ENot Observable
ENot Applicable
and displayed
8.4.3
lELlLj2
Additiona I Com ments/Assumptions :
2 Medium lmpact (Tier 2)3 Low lmpact (Tier 3)1 ht (Tier 1)H
Project Title: Vantage Aviation RIL - A2
Data filename:
Report date: 09/05/25
Page 7 of t0
Section
#
& Req.lD
lnsulation lnspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
:lnstalled roof insulation type and i
, R-value consistent with insulation i
rspecifications reported in plans i
rand COMcheck reports. For some i
ceiling systems, verification may
]tneed to occur during Framing
lnsperl ion. i
R-_
! Above deck
fl uetal
fl Attic
tEcomplies
nDoes Not
INot Observable
jDruot nppticabte
R-4.2.4
ltN2ll
see the Envelope Assemblies
table for values.! Above deck
! Metal
n Attic
5,8,1,2,
5,8,1,3
ltN311
Roof insulation installed per
manufacturer's instructions.
Blown or poured loose-fill
insulation is installed only whe
lDoes Not
!Not Observable
ElNot Applicable
re
the ce slo s T2
lies
I lnstalled above-grade wall
insulation type and R-value
consistent with insulation
specifications reported in plans
I Mass
n Metal
! Steel
! Wood
: R-_
I Mass
! Metal
! Steel
! Wood
rEComplies
rEooes ruot
ENot Observable
rEruot applicable
R-See the Envelope Assemblles
table for values.
and COMcheck reports.
4.2.4
ltN6ll
: Above-grade wall insulation
installed per manufacturer's
instructions.
EComplies
lDoes Not
INot Observable
ENot Applicable
5.8.1.2
ltN711
R-_
! Mass
! Steel
! Wood
R-_
! Mass
, I Steel
! Wood
4.2.4
ltN812
See the Envelope Assemblies
',table for values.
,ENot observable i
:Eruot applicable
:specifications reported in plans
; and COMcheck reports.
lnstalled floor insulation type and
R-value consistent with insulation
. Building envelope insulation is
,labeled with R-value or insulation
:certificate lras beerr provided
:listing R-value and other relevant
I data.
EComplies
EDoes Not
!Not Observable
!Not Applicable
5.8.1.1
ltNlo12
I Building envelope insulation
extends over the full area of the
component at the proposed rated
iR or U value.
l
nComplics
lDoes Not
ENot Observable
nNot Applicable
5.8.r..9
ltN1812
nComplies
lDoes Not
!Not Observable
!Not Applicable
,Eaves are baffled to deflect air to
above the insulation
5.8.1.4
ltN1112
:lnsulation is installed in
:substantial contact with the
: inside surface separating
, conditioned space from
i unconditional space.
!Complies
nDoes Not
nNot Observable
!Not Applicable
5,8,1.5
ltN1212
, Recessed equiprnent ir"rstalled in
I building envelope assemblies
: does not compress the adjacent
, insulation.
nConrplies
nDoes Not
INot Observable
INot Applicable
5.8.1.6
llN1312
tlComplies
nDoes Not
ENot Observable ,
ENot Applicable
'
5.8.1.7.r.
ttN r5l.
,Attics and mechanical rooms
ihave insuiaiion proiecieci where
adjacent to attic or equipment
access.
1 High lmpact (Tier 1)2 Medium lmpact (Tier 2)3 Low lmpact (Tier 3)
Vantage Aviation RIL - A2Project Title:
Data filename
Report date: 09/05/25
Page 8 of 10
do not lntsrfGi€
l-lComplies
Dooes Not
EINptOBcruable
ElNotAppli,eable
Addltlonal ebmme.nts-/Asaumptlons:
Fro-ieetTltl*'lhntag€:A\r-iatiotl RIL.A?
Bata filenar.ne:
Rsport dat* 0s/05n5
Pag€ Iof 10
t
5,4.3,5
IFI1P
Weatherseals installed on all loading
dock cargo doors ln Cllmate Zones 4-
8.
Ad..dlt- lo[ol Qorfi msntl*/Aa.surfi ,ptlon*r
Project Title: Vantage. Avi'atian RIL - Aa
Data filenarne:
Report date 09/05/25
Page 10of X0