Loading...
HomeMy WebLinkAboutMechanical SpecsM ECHAN ICAt/PtUM BI NG/ELECTRICAT Mechanical: DRAWING ITEMS 1. Drawing M000 a. Sheet index updated 2. Drawing M200 a. Both boiler combustion air and flues removed' b. HVLS-I and HVLS-2 uPdated c. HVLS-3 and HVLS-4 removed 3. Drawing M205 a. Sheet removed 4. Drawing M211 a. Sheet removed 5. Drawing M400 a. Snow melt detail removed 6. Drawing M40t a. Snow melt detail removed 7. Drawing M402 a. Sheet removed 8. Drawing M403 a. Sheet removed 9. Drawing M601 a. Pipe insulation schedule updated b. Ceiling fan schedule updated 10. Drawing M602 a. Boiler schedule, pump schedule, and snow melt schedule removed 11. Drawing M603 a. Sheet removed END OF MECHANICAL Plumbine: DRAWING ITEMS 12. Drawing P201 a. Gas piping size uPdated 13. Drawing P203 a. Gas sizing updated b. lce maker in Line support t22 now served by UB-2. Associated keynote updated c. Floor sink keynote added 14. Drawing P405 a. Gas isometric uPdated 15. Drawing P406 a. Utility box * ice machine detail added L6. Drawing P600 a. UB-2 added to Plumbing Material List 17. Drawing P601 a. Natural Gas Pressure Reducing Valve schedule updated Vantage Aviation 42 |MEG # 24005L74.O0 t Page ! of 2 D PEAK ENGINEERINGE CONSULTING STRUCTURAT ENGINEERING August 29,2025 Vantage Aviation A2 Peak No. 24-1 17.00 Construction Bulletin 01 STRUCTURAL NARRATIVE Sheet 51.1 added hangar collateral load note Modified notes 3.A and 3.D Removed note 3.E and renumbered Modified note 4.A and 4.1 Modified note 6.4 Sheet 51.2: none Sheet S1.3: none Sheet 31.4: none Sheet 51.5: modified detail4/S1.5 Sheet S2.0: modified Net Wind Uplift on Joist and Joist Girders detail Sheet S2.1: stretched WF270 5'-0" beyond gridline 1 Added section cut 4/53.2 Stretched WF270 2'-0" beyond gridline 1 1 Sheet 52.2: changed column type at grids 2.8'EE,0'1-EE, 4.6-EE, 0.1-AA Added column tYPes 7 and 8 Modified column base plate on column type 4 Updated column schedule Sheet S2.3: updated various beam sizes Updated various beam reactions Added section cut at AA.8-2.9 Added section cut at AA-6.5 Added section cut at AA-6.1 Updated framing Plan notes 6 and 8 D PEAK ENGINEERING? 390 Union Boulevard, Suite 500, Lakewood, Colorado 80228 main: 303 274 0707 | fax: 303 274 0808 | www.PeakEngr.com