HomeMy WebLinkAboutSteel Inspection Report 09.15.25MONUMENT
W7EEL
INSPE ON, LLC
Mr. Koby Kempel 9-15-2025
Pegasus Custom Homes
Re: 2299 Elk Springs Drive
Dear Mr. Kempel,
As requested, structural steel special inspection was conducted per the
IBC 2015 Edition - Chapter 17: Structural Tests and Special Inspection and the
Garfield County requirements. I arrived on -site at 12:00 PM. I met with you to
review project requirements and material ready for inspection. I have reviewed
the welder's certifications and the welding procedures and found both of them to
be acceptable.
Visual welding inspection was conducted on the ground level of this new
construction. I observed the beam to column groove welds, the beam -to -beam
fillet welds, the beam to stiffener plate fillet welds, the column to knife plate fillet
welds, the column to embed plate fillet welds, and the column to bucket fillet
welds. Upon completion, I observed all welds to be in compliance with project
specifications and the inspection requirements as stated in Clause 8 of the AWS
D1.1 Structural Welding Code — Steel:2020 Edition.
High strength bolt inspection was conducted on the ground level of this
new construction. I observed all bolts to be 3/4"' ASTM A325 twist -off type tension
control bolts fitted with a hardened flat washer properly positioned under the
turning surface of a heavy hex nut. Upon completion, I observed all bolts to be in
compliance with project specifications and the inspection criteria of the American
Institute of Steel Construction (AISC) and the Research Council on Structural
Connections (RCSC).
Monument Steel Inspection, LLC 318.469.2279
PO Box 23388
Glade Park, CO 81523
monumentsteelinspectionllc22@gmail.com
Respectfully submitted,
0-
444 14
Dan Bricker, CWI
AWS CWI #09052051
Monument Steel Inspection
® D ( cker
AWS C of
P. 5/1 /2027
Monument Steel Inspection, LLC 318.469.2279
PO Box 23388
Glade Park, CO 81523