HomeMy WebLinkAboutEngineer's OWTS Design Plan129 CAINS LANE
CARBoNDALE, CO 41623
970.309.5259
cRR Ln. o sle E nc@c Mnl L. co vI
sif tr>'l' r(t ()() Nst-! r-'l. r N c;
September 3,2025 Project No. C1984
Mandy and Travis Tiffany
Pfs625@qmail.com
Subsurface lnvestigation and Onsite Wastewater Treatment System Design
2-Bedroom Residence
TBD CR 233
Garfield County, Colorado
Mandy and Travis,
CBO Inc. performed a subsurface investigation and completed an onsite wastewater treatment system
(OWTS) design for the subject residence. The 40-acre property is located outside of Rifle, in an area
where OWTSs and wells are necessary.
Legal Description: Section: 32 Township: 5 Range: 92 THE NWSE OF SECTION 32 AS MORE
PARTICULARLY DESCRIBED PER WARRANTY DEED RECEPTION NO. 940542;40 ACRES
Parcel lD: 2127 -324-00-357
SITE CONDITIONS
The property is currently undeveloped. A 2-bedroom residence is proposed.
The residence may be served by a private well on the property. The well was recently drilled and is
located along the southern property boundary. Production of the well was not as anticipated and a
cistern may be necessary. lf a future cistern is not connected directly to the well, it must be at least 25-
feet from any OWTS component. lf the cistern is connected directly to a well, the cistern must meet
setbacks applicable to wells, which is at least SO-feet from the proposed septic tank and at least 1OO-feet
from the proposed soil treatment area (STA).
The proposed soil treatment area (STA) location has an approximate ten percent slope to the south. The
proposed area is not vegetated as it has been cleared and graded in preparation for construction.
There should be no traffic or staging of material over the future STA site to avoid compaction of soils
prior to construction of the STA.
SUBSURFACE
The subsurface was investigated on August 13,2025 by digging three soil profile test pit excavations (Test
Pits). A visual and tactile soil analysis was completed by Carla Ostberg at the time of excavation.l
I Carla Ostberg holds a Certificate of Attendance and Examination from the CPOW Visual and Tactile
Evaluation of Soils Training.
Page2
The materials encountered in Test Pit #1 consisted of light brown clay loam to 2.O-feet, underlain by a band
of gray, angular rock to a maximum depth explored of 4.O-feet. No bedrock or groundwater was
encountered.
The materials encountered in Test Pit #2 consisted of light brown clay loam to 1.0-foot, underlain by a band
of gray, angular rock to 3.O-feet, underlain by medium brown clay loam to a maximum depth explored of
4.O-feet. No bedrock or groundwater was encountered.
The materials encountered in Test Pit #3 consisted of medium brown clay loam a maximum depth explored
of 8.0-feet. No bedrock or groundwater was encountered. The rock band in this test pit was observed
from 6.0 to 6.5-feet.
Noting a vein or rock runs in the area of the proposed STA, we have shifted the proposed STA to be
closer to the proposed structure where the rock band minimal and deeper. Exploration in all Test Pits
showed suitable soil below the rock band.
A sample of the soil was taken from Test Pit #3 at 3-feet below grade. Soil structure grade was
moderate. The soil formed a ball and a ribbon 1 to 2-inches in length before breaking. Soil structure
shape was blocky and consistence was friable to firm. Soiltexture was both gritty and smooth.
The soil is consistent with Soil Type 3, Clay Loam, with moderate structure grade. A long-term
acceptance rate (LTAR) of 0.35 gallons per square foot will be used to design the STA.
Test Pit #1
Page 3
Gray rock band encountered in test pit
Test Pit #2
Sieved sample Ribbonlto2inches
Page 4
Test Pit #3
Test Pit #3
small rock band encountered
View of area
Page 5
DESIGN SPECIFICATIONS
Desiqn Calculations:
Average Design Flow = 75 GPD x 2 people/bedroom x 2 Bedrooms = 300 GPD
LTAR = 0.35 GPD/SF
300 GPD / 0.35 GPD/SF = 857 SF x'1.0 (gravity trenches) x 0.7 (chambers) = 600 SF
The OWTS design is based on 2-bedrooms. An average daily wastewater flow of 300 GPD will be used
For the purposes of this OWTS design, Benchmark Elevation at grade 5477' has been established as
100' (Finished Floor). CBO lnc. should be notified of any discrepancies or problems with grade
elevations of proposed components during installation of the OWTS.
*ElevationQ are based upon standard OWTS installation practices. Component elevations may change during
installation due to site conditions. Minimum grade refers to piping between components.
The 4-inch SDR-35 sewer line exiting the residence must have a double-sweep clean out and a minimum
2o/o erade to the septic tank.
The system installation must include a 1OO0-gallon, two-compartment lnfiltrator@ poly septic tank with an
Orenco@ Biotube effluent filter on the outlet tee. Any state-approved concrete or poly septic tank may be
substituted. Risers must bring the manhole lids to grade for access. lf more than one riser is added to
the septic tank, an extension handle must be installed on the effluent filter.
Effluent will gravity flow to a distribution box, and then to five gravelless chamber trenches. The
distribution box must be accessible from grade and must have flow equalizers, or similar product,
installed on each outlet pipe in the distribution box to assure equal flow to each trench.
Each trench will consist of B 'ADS' ARC 36 Low Profile chambers for a total of 40 chambers and 600
square feet of infiltrative area. There must be at least 4-feet of undisturbed soil between each trench.
lnspection ports must be installed at the beginning and end of each trench. Ports may be cut to grade
and placed in sprinkler boxes for access.
COMPONENT SPECIFICATIONS
The component manufacturers are typical of applications used by contractors and engineers in this area.
GBO lnc, must approve alternative components prior to installation of the OWTS. Requests must
be submitted, in writing, to our office for approval prior to installation, Component technical data
sheets are available upon request.
OWTS Gomponent Minimum Elevation
Primary Tank lnlet lnvert Approximate horizontal distance B' / min. 2% fall I
min.2" fall
Distribution Box Approximate horizontaldistance 1B'/ min. 1%'fall I
min,2.25" fall
lnfiltrative Surface Approximate horizontal distance 45' to furthest
trench / min. 1o/ofall to STA / min. 5.625" fall
Page 6
Construction must be according to the jurisdiction's adopted On-Site Wastewater Treatment System
Regulations, the OWTS Permit, and this design.
PERMIT APPLICATION INSTRUCTIONS
An OWTS Permit Application must be submitted to Garfield County Environmental Health Department.
https://www.qarfield-countv.com/environmental-health/filesqcco/sites/16/OWTS-Application-Complete-
Packet-Dec.-2019.pdf. lf the OWTS PermitApplication will be submitted with a Building Permit
Application, it should be submitted directly to Garfield County Building Department.
All questions regarding permit submission can be directed to Garfield County Environmental Health
Department, 970-945-661 4 x81 50.
VALIDITY PERIOD OF DESIGN DOCUMENTS
This design is valid for submission of an application for permitting for two (2) years from the date of the
design packet or upon a change in the county OWTS Regulation that could impact compliance with code
requirements. Continued use beyond this period orfollowing a change in the regulation is not
recommended without review and update of design documents.
INSTALLATION CONTRAGTOR
CBO lnc. expects that the installer be experienced and qualified to perform the scope of work outlined in this
design. The installer must review this design thoroughly and coordinate with our office in advance of
installation. Any additionalconditions in this design or county permit must be completed and documented
prior to final approval of the OWTS installation. Communication between the installer and this office is
expected throughout the installation.
INSTALLATION OBSERVATIONS
CBO lnc. must view the OWTS during construction. The OWTS observation should be performed before
backfill, after placement of OWTS components. Septic tanks, distribution devices, pumps, dosing
siphons, and other plumbing, as applicable, must also be observed. CBO lnc. should be notified 48 hours
in advance to observe the installation.
COMPONENT MANUFAGTURER MODEL NO.COMMENTS
Septic Tank lnfiltrator@ tM-1060-2CP 1000-gallon, two-
oompartment poly septic
lank
Tank Risers and Lids Orenco@ Double-walled PVC Risers and
lids (24" diameter)
Effluent Filter Orenco@ 4-inch diameter, full size
Distribution Box Polylok@ Distribution box, risers, lld, (5)
flow equalizers
Chambers .ADS'ARC] 36 Low Proflle 40 ARC 36 Low Profile
chambers
PageT
ln an effort to improve the accuracy of the record drawing, we request that the installer provide a
sketch of the installation, including path of the sewer lines, water line installation (if applicable),
septic tank location, STA location, and measurements from building corners or another fixed
objects on the property. This sketch is most easily provided on Sheet W2.0 of the OWTS Design
Packet. Photographs of the installation and final cover are also requested to supplement our installation
documentation.
REVEGETATION REQUIREM ENTS
An adequate layer of good quality topsoil capable of supporting revegetation shall be placed over the entire
disturted area of the OWTS installation. A mixture of native grass seed that has good soil stabilizing
characteristics (but without taproots), provides a maximum transpiration rate, and competes well with
successional species. No trees or shrubs, or any vegetation requiring regular inigation shall be placed over
the STA. Until vegetation is reestablished, erosion and sediment control measures shall be implemented
and maintained on site. The owner of the OWTS shall be responsible for maintaining proper vegetation
cover.
OPERATION INFORMATION AND MAINTENANCE
The property owner shall be responsible for the operation and maintenance of each OWTS servicing the
property. The property owner is responsible for maintaining seruice contracts for manufactured units,
alternating STAs, and any other components needing maintenance.
Geo-fabrics or plastics should not be used over the STA. No heavy equipment, machinery, or materials
should be placed on the backfilled STA. Machines with tracks (not wheels) should be used during
construction of the STA for better weight distribution. Livestock should not graze on the STA. Plumbing
fixtures should be checked to ensure that no additionalwater is being discharged to OWTS. For example, a
running toilet or leaky faucet can discharge hundreds of gallons of water a day and harm a STA.
lf an effluent filter or screen has been installed in the OWTS, we recommend this filter or screen be cleaned
annually, or as needed. lf the OWTS consists of a pressurized pump system, we recommend the laterals be
flushed annually, or as needed.
The homeowner should pump the septic tank every two years, or as needed gauged by measurement of
solids in the tank. Garbage disposal use should be minimized, and non-biodegradable materials should not
be placed into the OWTS. Grease should not be placed in household drains. Loading from a water softener
should not be discharged into the OWTS. No hazardous wastes should be directed into the OWTS.
Mechanical room drains should not discharge into the OWTS. The OWTS is engineered for domestic waste
only.
ADDITIONAL CONSTRUCTION NOTES
lf design includes a pump, weep holes must be installed to allow pump lines to drain to minimize risk of
freezing. The pump shall have an audible and visual alarm notification in the event of excessively high-
water conditions and shall be connected to a control breaker separate from the high-water alarm breaker
and from any other control system circuits. The pump system shall have a switch so the pump can be
manually operated.
Excavation equipment must not drive in the excavation of the STA due to the potential to compact soil.
Extensions should be placed on all septic tank components to allow access to them from existing grade.
Backfill over the STA must be uniform and granular with no material greater than minus 3-inch.
Page 8
LIMITS:
The design is based on information submitted. lf soil conditions encountered are different from conditions
described in this report, CBO lnc. should be notified. All OWTS construction must be according to the
county regulations. Requirements not specified in this report must follow applicable county regulations.
The contractor should have documented and demonstrated knowledge of the requirements and
regulations of the county in which they are working. Licensing of Systems Contractors may be required
by county regulation.
Please call with questions
Sincerely,
CBO lnc.
(s.n[w }gtb'e'^'g
Carla Ostberg, MPH, REHS
N
RESIDENCE
SITEBENCHMARK
EL.:5477.0A
TP3
+
STA
s 89'50'15" W 1330.95'
TIFFANY
RECEPTIONNo.
859853
SCALE:1" = 50L0"
CALL 811 FOR UTILITY
LOCATES
TP1
+
342.4',rP2+
THE LOCATION OF PROPOSED IMPROVEMENTS SHOWN ARE
NOT THE RESULT OF A PROPERTY SURVEY. THE LOCATIONS
ARE APPROXIMATE. IT IS THE HOMEOWNERS'DUTYTO
ENSURE ALL CONSTRUCTION AND IMPROVEIVENT LOCATIONS
ARE ACCURATE. PROPERTY LINES AND SETBACK DISTANCES
SHOULD BE CONFIRMED PRIOR TO EXCAVATION. SCALED
FOR PRINTING ON 11" X 17" PAPER,
LINE
w1 .0
CBO lnc.
129 Cains Lane
Carbondale, Colo€do 81623
Phone 970.309.5259
erla.ostberg@gmail.com
3.0'
Tiffany Residence
TBD CR 233
Garfield County, Colorado
ProjectNumber: C1984
Date: 0910312025
Drawn
Designed
by:
by: CBO
DD Sheet 1 0F 4
4" DIA SDR-35 SEWER PIPE WITH
MIN 2% FALL TO TANK
1 OOO-GALLON, TWO-COMPARTMENT POL
SEPTIC TANK WITH EFFLUENT SCREEN
SITE BENCH MARK
EL.:5477.0 4' DIA SDR-35 SEWER LINE TO STA
A.(MlN. 1ol" FALL TO STA)
BOX
WITH ACCESS AT GRADE
+ TP3
5 l+2.5+1
ADS'ARC 36 CHAMBER TRENCHES
N
342.4',
APROPOSED OYYTS\,,--T?F?
o
TP1+
r.P 2+
DIA SDR-35 INSPECTION PORT AT
BEGINNING AND END OF EACH TRENCH
5 TRENCHES WITH 8 CHAMBERS PER TRENCH
FOR A TOTAL OF 40 CHAMBERS AND 600 SF.
SCALE:1" = 30L0'
CALL 811 FOR UTILITY
LOCATES
w2.0
SDR-35 DISTRIBUTION
TRENCH
% SLOPE TO TRENCH)
LINE
CBO Inc.
129 Cains Lane
Carbondale, Colorado 81023
Phone 970.309.5259
carla.ostberg@gmail.com
oQqo
go
q*
s+
:Q
oo-
(MrN
TO
4"
MrN.10
168.0'
Tiffany Residence
TBD CR 233
Garfield County, Colorado
ProjectNumber: C1984
Dale: 0910312Q25
Designed by: CBO
Drawn by: DD Sheet 2 0F 4
DISTRIBUTION BOX WITH ACCESS AT GRADE
SLIP.ON PVC
DO NOT GLUE
INSUTATED
TRACERWIRE
4'DIA
SEWER LINE
TO TANK
FINISHED GRADE
/ACLEAN OUT DETAIL\g|--rTstr
FINISHED GRADE
HOUSE
3" MlN.
INFILTRATOR
END PLATE \CHAMBER (5'x 3')
ADS ARC 36
DIA SDR.35 INSPECTION PORT AT BEGINNING
AND END OF EACH TRENCH
4'DIA SDR-35 EFFLUENT PIPE FROIV.SEPTIC
TANK
4'
4' DIA SDR-35 DISTRIBUTION LINE TO EACH
TRENCH
(MrN. 1% SLOPE TO TRENCH)
PLACED IN
TOP PORT OF CHAMBER END
PTATES
4" DIA SDR-35 SEWER LINE
(MIN 2% SLOPE TO TANK,
MrN. 1% TO STA)
SCREENED
OR SAND FOR
BEDDING
8'MtN.
/ACHAMBER ]RENCH PLAN\r---r-rtrs
.ATRENCH DETAIL\3r--ffi
DIASDR-35
INSPECTION
PORT
BOX AND COVER BROUGHT TO GMDE
CONCRETE
FINSHEDL
sotL 2'
LIIVIT
EXCAVATION
SCARIFY
GMVELLESS'OUICK4'
CHAIVBER (4'x 3')
A CHAMBER TRENCH SECTIONv,r-ffiffi
BAFFLE OR
ANGLED PIPE
TO BE USED
AT INLET
/ADISTRIBUNON BOX DETAIL\3/-rt'w
w3.0
8 CHAMBERS PER TRENCH
E
CBO lnc.
129 Cains Lane
Carbondale, Colorado 81623
Phone 970.309.5259
carla.ostberg@gmail.com
Tiffany Residence
TBD CR 233
Garfield County, Colorado
ProjectNumber: C1984
lDate: 09/03/2025
lo""ion"a ou, ceo
lora*-n nv, bo
OUTLETS
ooo o ll-
Sheet 3 0F 4
DESIGN
PROPOSED 2.BEDROOM RESIDENCE
(75 GPD x 2 PERSONS/BEDROOM x 2 BEDROOMS)
WASTEWATER FLOW = 300 GPD
USE lOOO GALLON, TWO-COMPARTMENT SEPTIC TANK
SOIL TREATMENT AREA (STA):
LONG TERM ACCEPTANCE RATE (LTAR) = 0.35 GAL/ SF
CALCULATED STA = C/LTAR = 300 / 0.35 = 857 SF
857 SF X 1.0 (GRAVITY TRENCHES) X 0.7 (CHAMBERS) = 600 SF
600 SF/ 15 SF/CHAMBER = MlN. 40'ADS'ARC 36 CHAMBERS
SOIL PROFILE TEST PIT NO. 1 SOIL PROFILE TEST PIT NO. 2
STA TO WATER COURSE 50'N/A
STA TO WELL 100'176'
sTA TO HOUSE (SLAB)10'28'
SEPTIC TANK TO WATER COURSE 50'N/A
SEPTIC TANK TO WELL 50'2'to'
HOUSE TO SEPTIC TANK 5'7',
OWTS COMPONENTS AND
PHYSICAL FEATURES
MINIMUIV REOUIRED
SETBACK
APPROXIMATE PROPOSED
SETBACK
/A SETBACK CHART\3r---ft,ffi
SMALL VALVE COVER
BOX OR IRRIGATION
VALVE BOX AT GRADE
-0
-3
LIGHT BROWN CLAY LOAM
GRAY ANGULAR ROCK BAND
NO GROUNDWATER OR BEDROCK ENCOUNTERED
DURING EXCAVATION
/a SOILS LOG\.y Mrn*
LIGHT BROWN CLAY LOAM
GRAYANGULAR ROCK BAND
MEDIUM BROWN CLAY LOAM
SOIL PROFILE TEST PIT NO, 2
MEDIUM BROWN CLAY LOAM
GRAY ANGULAR ROCK BAND
FUUL
TFLuo
4
6
7
10
CAP ORTHREADED
CLEANOUT ASSEMBLY
LEGEND
F rockband
V clayloam
COMPACT
END
BASE TO SUPPORT
BOX
USE HOLE SAWTO
CUT THRU TOP OF
4" PVC PiPE CUT TO
FIT
/.\ INSPECTION PORT\9r--'---6nr@
w4.0
CBO lnc.
129 Cains Lane
Carbondale, Colorado 81623
Phone 970.309.5259
carla.ostberg@gmail.com
Tiffany Residence
TBD CR 233
Garfield County, Colorado
ProjectNumber: C1984
Dalei 0910312025
Designed by: CBO
Drawn by: DD Sheet 4 0F 4
l (lA Hin;;hi*1'ffffiff i:ri' *"
An Employsc Owncd Compony
5020 County Road 154
Glenwood Springs, CO 81601
phone: (970)945-7988
fax: (970) 945-8454
email: kaglenwood@kumarusa.com
www.kumarusa.com
Office I-ocations: Denver (HQ), Palker, Colorado Springs, Fort Collins, Glenwood Springs, and Summit County, Colorado
December 13,2024
Colonna Construction
Attn: Bernie Colonna
P.O. Box 1968
Rifle, Colorado 81650
colonna20 I 2@hotmail.com
Project No. 24-7-635
Subject: Subsoil Study for Foundation Design, Proposed Residence, 3436 County Road
233, West of Silt, Garfield County, Colorado
Dear Bernie:
As requested, Kumar & Associates, Inc. performed a subsoil study for design of foundations at
the subject site. The study was conducted in accordance with our agreement for geotechnical
engineering services to you dated October 29,2024. The data obtained and our
recommendations based on the assumed construction and subsurface conditions encountered
are presented in this report.
Proposed Construction: The proposed residence is expected to be a one-story wood frame
structure over a walkout basement located on the site in the area of the pits as shown on Figure 1
Ground floor will be slab-on-grade or structural over crawlspace. Cut depths are expected to
range between about 2 to l0 feet. Foundation loadings for this type of construction are assumed
to be relatively light and typical of the proposed type of construction.
If building conditions or foundation loadings are significantly different from those described
above, we should be notified to re-evaluate the recommendations presented in this report.
Site Conditions: The site slopes gently down to the southeast. Vegetation consists of sagebrush
with an understory of grass and weeds. The topsoil had been stripped from the building area and
the building pad had been graded. Sandstone bedrock was observed outcropping on the hillside
above the site to the north
Subsurface Conditions: The subsurface conditions at the site were evaluated by excavating two
exploratory pits in the graded driveway/building area at the approximate locations shown on
Figure 1. The logs of the pits are presented on Figure 2. The subsoils encountered, below about
tAfoot of topsoil/root zone consist of stiff to very stiff sandy silt down to the bottom of the pits
7% to 9 feet. Results of swell-consolidation test results performed on samples taken from the
pits are shown on Figures 3 and 4. The samples showed a moderate to high collapse potential
(settlement under constant load) when wetted. No free water was observed in the pits at the time
of excavation and the subsoils were slightly moist.
1
Foundation Recommendations: Considering the subsoil conditions encountered in the
exploratory pits and the nature of the expected construction, we recommend spread footings
placed on at least 3 feet of structural fill soil designed for an allowable soil bearing pressure
of 1,500 psf for support of the proposed residence. Footings should be a minimum width of
18 inches for continuous walls and2 feet for columns. Loose and disturbed soils and existing
topsoil encountered at the foundation bearing level within the excavation should be removed and
the footing bearing level extended down to the undisturbed natural soils. Structural fill placed
below footings should consist of the on-site soils compacted to at least 98Yo of the maximum
standard Proctor density at a moisture content near optimum. Exterior footings should be
provided with adequate cover above their bearing elevations for frost protection. Placement
of footings at least 36 inches below the exterior grade is typically used in this area. Continuous
foundation walls should be reinforced top and bottom to span local anomalies such as by
assuming an unsupported length of at least 15 feet. Foundation walls acting as retaining
structures should be designed to resist alateral earth pressure based on an equivalent fluid
unit weight of at least 55 pcf for the on-site soil as backfill.
Floor Slabs: The natural on-site soils, exclusive of topsoil and any disturbed soils from previous
excavation on the site, are suitable to support lightly to moderately loaded slab-on-grade
construction. To reduce the effects of some differential movement, floor slabs should be
separated from all bearing walls and columns with expansion joints which allow unrestrained
vertical movement. Floor slab control joints should be used to reduce damage due to shrinkage
cracking. The requirements for joint spacing and slab reinforcement should be established by
the designer based on experience and the intended slab use. A minimum 4 inch layer of free-
draining gravel should be placed beneath basement level slabs to facilitate drainage. This
material should consist of minus 2-inch aggregate with less lhan 50%o passing the No. 4 sieve
and less than2o/o passing the No. 200 sieve.
All fill materials for support of floor slabs should be compacted to at least 98% of maximum
standard Proctor density at a moisture content near optimum. Required fill can consist of the
on-site soils devoid of vegetation, topsoil and oversized rock.
Underdrain System: Although free water was not encountered during our exploration, it has
been our experience in the areathat local perched groundwater can develop during times of
heavy precipitation or seasonal runoff. Frozen ground during spring runoff can ueate a perched
condition. We recommend below-grade construction, such as retaining walls, crawlspace and
walkout basement areas, be protected from wetting and hydrostatic pressure buildup by an
underdrain system.
The drains should consist of drainpipe placed in the bottom of the wall backfill surrounded above
the invert level with free-draining granular material. The drain should be placed at each level of
excavation and at least 1 foot below lowest adjacent finish grade and sloped at a minimum to/o to
a suitable gravity outlet. Free-draining granular material used in the underdrain system should
Kumar & Associates, Inc.6 Project No. 24-7-635
-3-
contain less than 2o/o passing the No. 200 sieve, less than 50% passing the No. 4 sieve and have
a maximum size of 2 inches. The drain gravel backfill should be at least IYzfeet deep.
Surface Drainage: The following drainage precautions should be observed during construction
and maintained at all times after the residence has been completed:
1) Inundation of the foundation excavations and underslab areas should be avoided
during construction.
2) Exterior backfill should be adjusted to near optimum moisture and compacted to
at least 95o/o of the maximum standard Proctor density in pavement and slab areas
and to at least 90%o of the maximum standard Proctor density in landscape areas.
Free-draining wall backfill should be capped with about 2 feet of the on-site, finer
graded soils to reduce surface water infiltration.
3) The ground surface surrounding the exterior of the building should be sloped to
drain away from the foundation in all directions. We recommend a minimum
slope of 12 inches in the first 10 feet in unpaved areas and a minimum slope of
3 inches in the first 10 feet in pavement and walkway areas. A swale will likely
be needed uphill to direct surface runoff around the residence.
4) Roof downspouts and drains should discharge well beyond the limits of all
backfill.
5) Landscaping near the house should consist of low-water need plants and irrigation
should be restricted to be at least 5 feet beyond the foundation walls.
Limitations: This study has been conducted in accordance with generally accepted geotechnical
engineering principles and practices in this area at this time. We make no war:ranty either
express or implied. The conclusions and recommendations submitted in this report are based
upon the data obtained from the exploratory pits excavated at the locations indicated on Figure 1
and to the depths shown on Figure 2,the proposed type of construction, and our experience in
the area. Our services do not include determining the presence, prevention or possibility of mold
or other biological contaminants (MOBC) developing in the future. If the client is concerned
about MOBC, then a professional in this special field of practice should be consulted. Our
findings include interpolation and extrapolation of the subsurface conditions identified at the
exploratory pits and variations in the subsurface conditions may not become evident until
excavation is performed. If conditions encountered during construction appear different from
those described in this report, we should be notified at once so re-evaluation of the
recommendations may be made.
This report has been prepared for the exclusive use by our client for design purposes. We are not
responsible for technical interpretations by others of our information. As the project evolves, we
should provide continued consultation and field services during construction to review and
monitor the implementation of our recommendations, and to verif,i that the recommendations
have been appropriately interpreted. Significant design changes may require additional analysis
Kumar & Associates, lnc. o Project No. 24-7-635
-4-
or modifications to the recommendations presented herein. We recommend on-site observation
of excavations and foundation bearing shata and testing of structural fill by a representative of
the geotechnical engineer.
If you have any questions or if we may be of funher assistance, please let us know.
Respectfu lly Submitted,
Kumar & Associates, lnc.
e
Daniel E. Hardin, P
Reviewed by:
|r,rn"r F.funpnaf
James Parsons. P.E.
DEH/kac
attachments Figure I - Location of Exploratory Pits
Figure 2 - Logs of Exploratory Pits
Figures 3 and 4 -Swell-Consolidation Test Results
Table I - Summary of Laboratory Test Results
Kumar & Associates, lnc. @ Project No. 24-7-635
:
I
30 60
APPROXIMATE SCALE_FEET
24-7 -635 Kumar & Associates LOCATION OF EXPLORATORY PITS Fig.1
PIT 1 PIT 2
0 0
F
Ld
LJ
LL
IEFo-uto
5
WC=4.3
DD=96
WC=4.1
DD=9 1
WC=5.0
DD= 1 07
-200=66
LL=20
Pl=7.8
5
FLI
LrJtL
IIFo-
Ldo
10 10
LEGEND
TOPSOIL; ORGANIC SANDY SILT, SLIGHTLY MO|ST, FIRM, BROWN.
stLT AND CLAY (ML-C
MOIST, STIFF TO VERY
L); SANDY, (SANDIER AND SCATTERED GRAVEL WITH DEPTH), SLIGHTLY
STIFF, BROWN.
F
t
HAND DRIVE SAMPLE.
PRACTICAL REFUSAL TO THE EXCAVATION.
NOTES
1. THE EXPLORATORY PITS WERE EXCAVATED WITH A BACKHOE ON NOVEMBER 6, 2024.
2. THE LOCATIONS OF THE EXPLORATORY PITS WERE MEASURED APPROXIMATELY BY PACING FROM
FEATURES SHOWN ON THE SITE PLAN PROVIDED.
5. THE ELEVATIONS OF THE EXPLORATORY PITS WERE NOT MEASURED AND THE LOGS OF THE
EXPLORATORY PITS ARE PLOTTED TO DEPTH.
4. THE EXPLORATORY PIT LOCATIONS SHOULD BE CONSIDERED ACCURATE ONLY TO THE DEGREE
IMPLIED BY THE METHOD USED.
5. THE LINES BETWEEN MATERIALS SHOWN ON THE EXPLORATORY PIT LOGS REPRESENT THE
APPROXIMATE BOUNDARIES BETWEEN MATERIAL TYPES AND THE TRANSITIONS MAY BE GRADUAL.
6. GROUNDWATER WAS NOT ENCOUNTERED IN THE PITS AT THE TIME OF EXCAVATION. PITS WERE
BACKFILLED SUBSEQUENT TO SAMPLING.
7. LABORATORY TEST RESULTS:
WC = WATER CONTENT (%) (ASTM D 2216);
DD = DRY DENSITY (pcf) (ASTM D 2216);
_2OQ= PERCENTAGE PASSING NO. 2OO SIEVE (ASTM D
LL = LIQUID LIMIT (ASTM D 4518);
Pl = PLASTICITY INDEX (ASTM D 4318).
1 1 ao);
24-7 -635 Kumar & Associates LOGS OF EXPLORATORY PITS Fig. 2
t
E
SAMPLE OF: Sondy Cloyey Sili
FROM:Pit1@4'
WC = 4.3 %, DD = 96 pcf
ADDITIONAL COMPRESSION
UNDER CONSTANT PRESSURE
DUE TO WETTING
2
bs
JJIJ
=tt1
I
z.o
F
o
=o
Qzo()
0
-2
-4
-6
-8
-10
-12
-14
100
24-7 -635 Kumar & Associates SWELL_CONSOLIDATION TEST RESULTS Fig. 3
I
E
5
2
0
-2
;q
JJ
Lrl
=ln
I
zotr
o
Joaz.oo
-4
-6
-8
1 0
1 2
-14
-16
-18
-zo
-22 1.0 APPLIED 100
SAMPLE OF: Sondy Sili
FROM:Boring2@2.5'
WC=4. 1 %,DD=91 pcf
not b. Eprcduccd,
rithout lhc rrltLn opprcwl of
ond Arocla!-, lnc. Sr.ll
tctrd. lhc
ln
ln
ADDITIONAL COMPRESSION
UNDER CONSTANT PRESSURE
DUE TO WETTING
24-7 -635 Kumar & Associates SWELL-CONSOLIDATION TEST RESULTS Fig. 4
I(+A[',ffififfi$fni$'""
TABLE 1
SUMMARY OF LABORATORY TEST RESULTS
Project No.24-7-635
SAMPLE LOCATION
NATURAL
MOISTURE
CONTENT
NATURAL
DRY
DENSITY
ATTERBERG LIMITS
BORING DEPTH
GRAVEL
(:kl
SAND
(%\
PERCENT
PASSING NO,
2OO SIEVE
LIQUID LIMIT PLASTIC
INDEX
AASHTO
CLASSIFICATION SOIL TYPE
Sandy Clayey Silt
Sandy Silt
Sandy Clayey Silt82066
96
9l
107
4.3
4.r
5.0
4
2y,
J
1
2
toFl
,' .l
NAqS L, NDNFNYJ.MN
CARFI€LD COUNTY. COLORADO
MINOR SUBDIV1SION PLAT
s]Ir'rl4sEr/4 s32, T5S, R92W
3436 CO]]w ROAD 233
"/tt__/.dt1
itr'-
6'q0cryatl
TIFFANY MINOR SI-IBDIVISION PLAT
PARCEL OF LAND BEING THE SW1/4SE1/4 OF SECTION 32, TOWNSHIP 5 SOUTH, RANGE 92 WEST OF THE 6TH P.M.
COUNTY OF GARFIELD, STATE OF COLORADO
{
z
GRAPMC SCAIJ
-ffi
ffi
mrrR coNsM rc s^rD ld6M
ffi
ItJ,$tirjlj'-: ^
IJII$fit
ffi
ffiqPuhlic.nef" Garfield County, Co
AccountNumber R084519
ParcelNumber 27273240O357
Acres 4A
Land SqFt 0
TaxArea O2t
MillLevy 70.9860
Date created:9/2/2O25
Last Data Uploaded:9/2/2025 2:O7:16 AM
Physical Address 0
RIFLE 81650
Owner Address TIFFANY TRAVIS & MANDY J
3436 COUNTY ROAD 233
RIFLE CO 81650
Overview
Legend
l-l Parcels
Roads
Parcel/Account
Numbers
Owner Name
Lakes & Rivers
- CountyBoundary
Line
TotalActualValue $0 Last2Sales
Date Price
B/2O/202O $11o,ooo
n/a $
Develoned bvtS SCHNEIDER
GEQSPATIAL
911125, 12:55 PM
Garfield County, CO
Summary
Account
Parcel
Property
Address
Legal
Description
Acres
Land SqFt
Tax Area
MillLevy
Subdivision
qPublio- Garfield County, CO - Property Record Card: R084519
R084519
2t2732400357
,R|FLE,CO 81650
Section: 32 Township: 5 Range: 92 THE NWSE OF SECTION 32 AS
MORE PARTICULARLY DESCRIBED PERWARRANry DEED
RECEPTION NO. 940542; 40 ACRES
40
0
27
70.9860
ViewMap
Map
Owner
TIFFANY, TRAVIS & MANDY J
3436 COUNTY ROAD 233
RTFLE CO 81650
Land
UnitType 35 ACTO L/T 100AC-0550 (VACANT LAND)
Square Feet 0
Acres 40
Actual Values
Tax Year 2025 2024 2023 2022 2027
Actual Value
Assessed Values
$13s,000.00 $160,000.00 $160,000.00 $110,000.00 $11o,ooo.oo
Tax Year 2025 2424 2023 2022 2027
Non School Assessed Value $36,450.00 n/a nla nla nla
School Assessed Value $36,4s0.00 n/a n/a n/a nla
Pre 2025 Assessed Value nla $44,540.00 $44,640.00 $31,900.00 $31,900.00
FAQs
MillLevies
Tax Year 2025 2024 2023 2022 2021
Non School District LeW 43.87 nla nla n/a nla
School District Levy 27.116 nla nla n/a n/a
Total Levy 70.986 70.946 6t.5L7 66.337
https://qpublic.schneidercorp.com/Application.aspx?ApplD= 1038&LayerlD=22381&PageTypelD=4&PagelD=9447&KeyValue=R084519
74.542
'v2
911125, 12:55PM
Tax History
TaxYear
qPublic - Garfield County, CO - Property Record Card: R084519
2024 2023 2022 2021
Taxes Billed $3,168.80 $2,746.72 $zu6.16 $2,382.36
Sale Price
Click here to view the tax information for this parcel on the Garfield CountvTreasurer's website.
Transfers
Sale Date Deed Tvpe Reception Number Book - Pase
8/20/2020 QUITCLAIM DEED 940543 $o
8/20/2020 WARRANTY DEED 940s42 $11o,ooo
8/79/2020 STATEMENT OF AUTHORITY 940541 $o
L7/tO/2016 LETTERS 973249 $o
4/28/2009 QUITCLAIM DEED 767827 $o
2/15/2007 DEED 717350 r894-965 $o
2/12/2007 RESOLUTION 717349 r894-961 $o
72/30/2005 QUITCLAIM DEED 690400 1763-674 $o
6/17/I97s QUITCLAIM DEED 258405 o476-0196 $o
6/72/r975 WARRANryDEED 268403 o476-0790 $o
4/16/r973 WARRANry DEED
Property Related Public Documents
Click here to view Propertv Related Public Documents
No data available for the following modules: Buildings, Photos, Sketches.
ire e a:"ieid Ccu::iy Assss:*r'$ Oilae *ialra! every eii;-rrf io pri:duce t*; n+si acr.uraii;
lfitrr*ali<:r: iri::sille. l.ic ivlrr.:tfiee , ez.2rat*;td ilr implied ..* trc.',ridecl fcr tl..le Cata her:ir:. lt;
1-rt{: or i:':le rpre tatia}rr. *ria i," ;ul:rjcct :o ionsiaitl aharl;e anrJ :l; accurar-,; ea1 t.*uttslt:iet:<:ts
c:nncr be gue:"at:iecr:.
: User PIivaSr Policv I GDPR Pli)4acv Notice
l.ast Data Uploadi?./1/2Q25. 12:05:44Alvt
258063 o443-O573 $o
arni:!e{ Us Deveii;peC b;,
B scxrueroe*
https://qpublic.schneidercorp.comiApplication.aspx?ApplD=1038&LayerlD=22381&PageTypelD=4&PagelD=9447&KeyValue=R084519 212