Loading...
HomeMy WebLinkAboutInsulation CertificateAccurate lnsulation Permit#: Job lnformation Builder:J[;rn "\AM. Community:Lot: Address: [eqq Cor^{,,, Pi. zfr City s. tI IState ziP: ?ru< z Air Leakage Test Results Possing results must meet either the Perfurmonce, Prescriptive, or ERI Method Prescriptive Method- The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour at pressure of O.2-inch w. g. {50 Pascals} in Climate Zones 1 and 2. Performance or ERI Method-the building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding the selected ACH (50) value, as shown on Form R405-202 (Performance) or R406-2020 (ERl), section labeled as infiltration, subsection ACH50. ACH (50) specified on Form R/m5-202-Energy Calc (Pefurmance) or R406-2020 (ER,):7 'a-o/ ?+ ven cFM (s0) 32, (off Building Volume 2.7 ACH (sol Z PASS Method for Calculating building volume: o Retrieved from architectural plans o Code software calculated oAield measured and calculated During testing: t. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infilitration control measures. 2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures. 3. lnterior doors, if installed at the time of the test, shall be open. 4. Exterior doors for continous ventilation systems and heat recovery ventilatiors shall be closed and sealed. 5. Heating and cooling systems, if installed at the time of the tst, shall be turned off. 6. Supply and return registers, if installed at the time of the test, shall be fully open. Testing Gompany company Name: Accurate lnsulation Phone: 970-296-004t Signature of Tester:Dateof1"r1. /o / a3 / Z( Printed Name of Tester: Rich Romero Lice nse/Ce rtifi catio n : 5O7 2554 lssu i ng Authority: Building Performa nce lnstitute