HomeMy WebLinkAboutEngineer's Letter 05.22.24May 22,2024
Quinn Garbick Construction
Re: Bder Steel Building
4090 4188 Peach Valley Road
Silt, Colorado
Gentlemen:
As regueated I hffre rerrierred conrtnrstion of this steel building for completeness
and constnrstion guality.
the building appears to be a cold rolled steel frame etrucfirrewith ste€l srterior
cladding. As needed, we observed the steel frame constnrc-tion along with the
bolted connectione to the slab construction forurdation
It ow opinion that the steel constnrction of tha building wae done in a workman
manner according to the standards of the industry and the plans for thig building,
Bolting \na!t Eonrplete and tight at each corurection location and colurnns and beams
urere in place as reguired.
If you hane any questions plaase contact me at 97o.260-4880.
Sincerely
lYt
Philip M, Haxt, PE
President