HomeMy WebLinkAboutConditions of PermitCONDITION OF PERMIT
BLMF-08-25-9425
STEVE & TAMLA BEISNER
IRC MODULAR HOME ON ENGINEERED FOUNDATION CRAWL SPACE
146 Ouicksilver Court, Rifle
Ouicksilver Court Subdivision, Lot 1 - 217727201001
MANUFACTURED HOUSES ARE REGULATED & INSPECTED BY COLORADO DEPT. OF HOUSING (C.D.O.H.)
AND ALL FACTORY.BUILT RESIDENTIAL STRUCTURES INSTALLED IN GARFIELD COUNTY MUST MEET
C.D.O.H. GUIDELINES FOR MANUFACTURE AND INSTALLATION ATTHE JOB SITE.
(2018 |ECC'BLOWER DOOR TESTtNG', ON PREMISES AFTER INSTAILATION SHALL NOT APPLY FOR
MANUFACTURED HOME TYPE -
AS CURRENT ENERGY COMPLIANCE FOR STATE OF COLORADO IS TO BE VERIFIED AT THE FACTORY)
1)
2)
J)
FOUNDATION CRAWL SPACE & EXTERIOR DOOR LANDING / STAIRS SHALL COMPLY WITH 2015 I.R.C.,
201 8 I.E.C,C. AND MAN UFACTURER'S I NSTALLATION REOUI REM ENTS.
REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REOUIREMENTS AND
MANUFACTURER'S I NSTALLATION REOUI REM ENTS.
WILDFIRE MITIGATION RECOMMENDATIONS: SHOULD COMPLY WITH WILDFIRE MITIGATION AND
DEFENSIBLE SPACE RECOMMENDATIONS COLORADO STATE FOREST SERVICE AND LOCAL FIRE
DISTRICT. PLEASE REFER TO THE GARFIELD COUNTY COMMUNITY DEVELOPMENT WEBSITE FOR
ADDITIONAL I NFORMATION.
ALL PLUMBING AND GAS PIPING CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED
PLUMBER, AND ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED
ELECTRICIAN.
ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRIC BOARD, ELECTRICAL
ROUGH-IN APPROVAL, ELECTRICAL FINAL APPROVAL REOUIRED FOR FINAL INSPECTION & CERT. OF
OCCUPANCY.
PROPANE FUEL TYPE SPECIFIED: SEE ATTACHED GUIDE.
PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY, PROVIDE BUILDING
INSPECTOR WITH FINAL APPROVAL / SIGN-OFF FROM GARFIELD COUNTY'S PUBLIC HEALTH
DEPARTMENT FOR INSTALLATION OF THE ON-SITE WASTEWATER TREATMENT SYSTEM,
GARFIELD COUNTY BUILDING DEPT. INSPECTIONS TO INCLUDE THE FOLLOWING:
A. FOOTINGS DESIGNED AT 2.500 PSF, VERIFY 36 INCH MINIMUM FROST DEPTH & UFERGROUND
INSTALLED. OPEN HOLE SOILS REPORT REOUIRED AT FIRST FOOTING INSPECTION.
B. FOUNDATION
C. SEPTIC SYSTEM CONNECTION
D, PLUMBING/GAS
E. SITE FRAMING, STAIRS, HANDRAILS PER STRUCTURAL ENGINEERS PLANS AND FIELD COPY.
F. FINAL INSPECTION & CERTIFICATE OF OCCUPANCY*
*NOTE: GARFIELD COUNTY REOUIRES C.D.O.H. INSTALLATION INSIGNIA TO BE AFFIXED PRIOR
TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY
.s
tt
t\
4)
s)
9) THE OWNER OF EACH LOT SHALL DEMONSTRATE THAT THE REOUTRED 1,000 GALLON STORAGE
TANK HAS BEEN CONSTRUCTED PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
6
7
\
s
8)