HomeMy WebLinkAboutInstallation Observation 10.10.25
October 10, 2025
AS-BUILT CERTIFICATE OF INSPECTION & ACCEPTANCE
Onsite Wastewater Treatment System
3-BR Single Family Dwelling
5587 County Road 320
Rifle, CO 81650
The referenced onsite wastewater treatment system (OWTS) was inspected on October 3, 2025.
At the time of inspection, the OWTS was installed in general conformance with the OWTS
design plans prepared in April 2025 (revised July 2025).
The as-built survey was completed using Real Time Kinematic (RTK) survey equipment to
ensure accurate location and documentation of installed system components. The OWTS was
determined to be operating for its intended purpose.
Please contact WestWater Engineering for any additional information regarding engineered-
design OWTS for the referenced address.
Respectfully,
Jeremy Gilliam, P.E.
2516 Foresight Circle, #1
Grand Junction, CO 81505
(970) 241-7076
www.westwaterco.com