HomeMy WebLinkAboutCondtions of Permit1
CONDITIO NS OF PERMIT
GRAD-1 0-25-9545
STU EVEN
GRADING FOR A NEW RESIDENCE
2647 ELK SPRINGS ROAD
SANITARY FACILITIES ARE REOUIRED TO BE PROVIDED FOR WORKERS
2 INSTALL STORMWATER CONTROLS PRIOR TO ANY DIRT WORK.
3 LOCATE ALL UTILITIES PRIOR TO ANY WORK. 81 1 IS THE STATE UTILIry LOCATE
NUMBER
4) CONTROL NOXTOUS WEEDS. TREAT EXISTTNG WEEDS PRIOR TO RELOCATING
PLANTS AND SEEDS.
5) REVEGITATE ALL DISTURBED AREAS THAT ARE NOT PART OF A ROAD OR NON-
SEEDED AREA.
6) pROVtDE EROSTON CONTROLS UNTTL SEEDED AREAS CAN BE ESTABLISHED.
7) PROVTDE DUCT CONTROL AS REOUIRED DURING CONSTRUCTION.
8) MAINTAIN ALL DRAINAGE ON THE SUBJECT PROPERry, DRAINAGE SHALL NOT
ENTER NEIGHBORING PROPERTIES OTHER THAN HISTORIC DRAINAGE.
9) THE SEpTtC tS NOT A PART OF THE GRADING PERMTT. THE OWTS PERMIT lS TO BE
APPROVED BY THE COUNry'S ENVIRNMENTAL HEALTH DEPARTMENT PRIOR TO
SEPTIC CONSTRUCTION.
10)cRAD|NG AT THE OWNER OR CONTRACTORS OWN RISK. THE BUTLDTNG PERMIT lS
PENDING REVIEW. THIS GRADING PERMIT IS NOT TO BE CONSIDERED AN
APPROVAL OF THE BUILDING PERMIT.
1 1)A DRIVEWAY PERMIT MAY BE REOUIRED BY THE COUNTY ROAD AND BRIDGE
DEPARTMENT. PLEASE PROVIDE A DRIVEWAY PERMIT OR AN EXEMPTION LETTER
FROM R & B PRIOR TO ISSUANCE OF THE BUILDING PERMIT.