Loading...
HomeMy WebLinkAboutObservation of Excavation2709 Riverside Parkway Client: Monico Murillo Grand Junction, CO_ 01501 250 CR 127 #2 Huddleston-Berry (970) 255-13005 Glenw ood Springs Engineering G'1'c ling, LLC 1140({6t41fueS1pbILrVtOrr1 CO 81601 SOIL OBSERVATION REPORT Project: 1127 Skutter Lane Rifle Approval: y� Project Number: 02631 - 0001 Technician: Derric Ferguson teviewed by: 3essA.L ras Work Order No: observation Date: July 9, 2024 Review Date: July 11, 2024 Geotechnical Report Title: 1127 Scutter Lane, Monico Muril Sub -Contractor: Monico Murillo Geotechnical Report Author: HBEr On Site Notification: Monico Murillo Geotechnical Report No & Date: 02631-0001 5/2/2023 Foundation Type: Footing / Stem Wall Geotechnical Report Bearing Capacity, psf: 1500 Proof -roll equipment: Full capacity wheeled skid -steer Development or Lot Specific Report: Lot Specific Excavation Limits, ft: 74 by 64 Soil Type Observed: Clayey Sand w MGauge & Date of Calibration: 80013 10-23 E roposed Type of Structural Fill for Next Lift: NA `o Density Counts: 2558 `c 0 Anticipated Thickness of Structural Fill, ft: 0 v El Moisture Counts: 663 Lance below Existing Ground and location of measurement, in: Municipality: Garfield County Surveying and elevation validation are outside of the scope of work and were not performed by HBET. Lab #: 23-0190 Max. Dry Density, pcf: 115.0 Opt. Moisture, %: 14.5 Proctor Type: D698 A laterial Classification: CLAYEY SAND(SC) Specification: 95 , -2 to +2 D698 m ai N d• w Location: w e a y o c r E a a) m Remarks I F w o a, a a` a v N Rock Corrected Proctor Values: 1 Not Applicable Proof -roll Pass Not Applicable ... ..... .. .. .. 2 Center of Craw I Space area 0 0 112.6 12.8 6 98% Pass 115 pcf @ 14.5 % Moisture 3 Center of Walk Out Basement Area 0 5 115.8 11.9 6 99% Pass 116.7 pcf @ 13.9 % Moisture 4 Center of Walk Out Wall 0 0 113.3 12.7 6 99% Pass 115 pcf @ 14.5 % Moisture Com m ents: 7/9 2789 Riwrside Parkway Client: Monico Murillo 4F 1 Grand Junclion, CO, 81501 250 CR 127 #2 Huddleston-Berry i970l zsseoos Glenw ood Springs Engineering& fcoing, LLC InkCdHyS�cylraiarvcmn CO 81601 SOIL OBSERVATION REPORT Project: 1127 Skutter Lane Rifle Approval: On -going Testing is Required Project Number: 02631 - 0001 Technician: Alex Brown teviewed by: Jesse Lueras Work Order No: )bservation Date: July 5, 2024 Review Date: July 11, 2024 Geotechnical Report Title: 1127 Scutter Lane, Monico Muril Sub -Contractor: Monico Murillo Geotechnical Report Author: HBET On Site Notification: Monico Murillo Geotechnical Report No & Date: 02631-0001 5/2/2023 Foundation Type: Footing / Stem Wall Geotechnical Report Bearing Capacity, psf: 1500 Proof -roll equipment: Full capacity wheeled skid -steer Development or Lot Specific Report: Lot Specific Excavation Limits, ft: 74 by 64 Soil Type Observed: Clayey Sand w 3C 1 IGauge & Date of Calibration: 28667 10-23 E I�� roposed Type of Structural Fill for Next Lift: Clayey Sand .2 Density Counts: 1715 0 Anticipated Thickness of Structural Fill, ft: 1 v � Moisture Counts: 640 lance below Existing Ground and location of measurement, in: Municipality: Garfield County ` Surveying and elevation validation are outside of the scope of w ork and w ere not performed by HBEr. Lab #: 23-0190 Max. Dry Density, pcf: 115.0 Opt. Moisture, %: 14.5 Proctor Type: D698 A iaterial Classification: CLAYEY SAND(SC) Specification: Proof -Roll a Location: 1 Bottom of footing excavations 2 Center of Craw I Space area 3 Center of Walk Out Basement Area 4 Center of Walk Out Wall N LL a '- w .. d !Z a' p c a y o G a E e o L) O' Proof -roll -2 0 109.9 13.3 6 96% -1 0 111.6 13A 6 97% -1 0 111.4 15.8 6 97% Comments: Placement contractor required additional time for finishing compaction Remarks / a m 0 Rock Corrected Proctor Values: rn Pass No Deflection Observed Pass 115 pcf @ 14.5 % Moisture Pass 115 pcf @ 14.5 % Moisture Pass 115 pcf @ 14.5 % Moisture 7-5-24 Huddleston-Be Enginccring& I'cwlinr, LI. 0 2789 Riverside Parkway Client: Monico Murillo y� Grand Junclion, CO, 81501 250 CR 127 #2 `-' (970) 255-8005 Glenw ood Springs IHt&lsuil. 1!AdHyr;JC*" CO 81601 SOIL OBSERVATION REPORT Project: 1127 Skutter Lane Rifle Approval: On -going Testing is Required Project Number: 02631 - 0001 Technician: Jesse Lueras reviewed by: Jesse Lueras Work Order No: observation Date: July 1, 2024 Review Date: July 11, 2024 Geotechnical Report Title: 1127 Scutter Lane, Monico Muril Sub -Contractor: Monico Murillo Geotechnical Report Author,, HBET On Site Notification: Monico Murillo Geotechnical Report No & Date: 02631-0001 5/2/2023 Foundation Type: Footing / Stem Wall Geotechnical Report Bearing Capacity, psf: 1500 Proof -roll equipment: Full capacity wheeled skid -steer Development or Lot Specific Report: Lot Specific Excavation Limits, ft: 74 by 64 Soil Type Observed: Clayey Sand In I X IGauge & Date of Calibration: 28667 10-23 E �� roposed Type of Structural Fill for Next Lift: Clayey Sand 0 Fx] Density Counts: 1715 c 0 Anticipated Thickness of Structural Fill, ft: 2 v [_X I Moisture Counts: 640 tance below Existing Ground and location of measurement, in: Municipality: Garfield County Surveying and elevation validation are outside of the scope of w ork and w ere not performed by HBEr. Lab #: 23-0190 Max. Dry Density, pcf: 115.0 Opt. Moisture, %: 14.5 Proctor Type: D698 A iaterial Classification: CLAYEY SAND(SC) Specification: 95 _2 to +2 D698 N w Location: y=_ a e m o s E o d m Remarks I Og, a a` v m Rock Corrected Proctor Values: 1 Bottom of footing excavations -2 Proof -roll Pass No Deflection Observed 2 North Footing Line -2 0 114.5 12.6 6 100% Pass 115 pcf @ 14.5 % Moisture 3 Center of West Footing Line -2 0 115.0 12.9 6 100% Pass 115 pcf @ 14.5 % Moisture 4 South Footing Line -2 0 113.9 14.0 6 99% Pass 115 pcf @ 14.5 % Moisture 5 East Footing Line -2 0 114.2 12.5 6 99% Pass 115 pcf @ 14.5 % Moisture Comments: 7/1