Loading...
HomeMy WebLinkAboutEngineer's Observation Letter 03.26.24Engineering Studio Denver DBA Verodyn, LLC 1801 Wewafta St. Floor 11 Denver, Co.80202 720-612-7553 ffi co+o t-o(n -oo Observation 1s1; Timberline Construction Date: Ogt26l24 Job Numbet LO326 PrcnertvAddress: 2368 CO RD 112t J Carbondale, CO 80435 Reference: Obsewation of Residence Report Date of Observation: O3l2Ot24 Completed by: Dustin Randle by Engineering Studio Denver dated Scope of Observation: lf'1s garage header was upgraded to handle an engineering mis calculation. The header has been installed properly and to code Observqtions a The observed new construction, described in the scope above, meets the requirements indicated in the above referenced ES Denver report. ES Denver was not on site during the installation but obsewed the completed construction to be structurally sound. Based on our limited observations, it appears that the observed new construction was performed in genetal compliance with the recommendations. Additional Notes:o The performance of the new construction is dependent upon maintaining the propet gtading and drnnage of surface water. The propetty owner should be made aware of the impottance of providing and maintaining proper grading and dtainage around the perimeter of the structure. Page I of 3 lmoges The following images detail the observations made at the wotk site: Page 2 of 3 Deliverobles Controctor Responsi bilities Engineering Studio Denver performed a full observation of the work site and thoroughly examined all 1.r"- .orrrttrrction areas in accotdance with the engineering standatds of ES Denvet' Limitations of Services a. This report is based on the available data and the limited accessibility of the elements and compo,rnds of the stfuctufe. No invasive testing was conducted. b. The tpinions and assessment of this structure are based on accepted general practice and are hmitea to the data avaiTable to out office. ES Denver makes no wartanty on the continued structural integrity of the property. c. Stability of soils in Colotado are unpredictable and unknown fot what future condition may exist. d. Based on this information, the value of the observation given is mutually agreed to be limited to the cost of the observation report. Thank you for having ES Denver perform this observation. Please contact vs ^t720.612.7553 fot any questions regarding this rePort. Regatds, R!tl['y sisned bY Dustin DN: C=US, D u st i n Ra n d I e 5==iL'Jll9"?,""!"3[T;:"'' Denver, CN=Dustin Randle Dale:2024.03.26 14:08:49-06'00' Dustin Randle, PE President/CEO Pnge 3 qfJ