HomeMy WebLinkAboutInstallation Observation 11.21.20252789 Riverside Parkway
Grand Junction, Colorado 81501
Phone: 970-255-8005
Info@huddlestonberry.com
November 21, 2025
Project#02205-0002
Casey Sheets
59 County Road 317
Rifle, Colorado 81650
Subject: OWTS Installation Inspection
Parcel 217927101002 ADU
Silt, Colorado
Reference:OWTS Design, Parcel 217927101002 ADU, Silt, Colorado by Huddleston-Berry
Engineering & Testing, LLC for Casey Sheets, May 12, 2025.
Dear Mr. Sheets,
In accordance with Garfield County and State of Colorado regulations, Huddleston-Berry
Engineering & Testing, LLC (HBET) conducted inspection of the installed Onsite Wastewater
Treatment System (OWTS) at Parcel 217927101002 in Silt, Colorado. As indicated in the
referenced report, HBET completed engineering design of the system.
Based upon our inspection, HBET certifies that the OWTS was constructed in accordance with
the design. The as-built site plan is attached. Please contact us if you have any questions or
comments regarding the contents of this letter.
Respectfully Submitted:
Huddleston-Berry Engineering and Testing, LLC
Wayne D. Anderson, P.E.
Project Engineer
Cc: Garfield County Building Department
11/21/25
ATTACHMENTS
WATER LINE
NEW ADU
STA
EX. STA
REPAIR AREA
EX. SHOP
EX. RESIDENCE
1,000
GALLON
TANK
P
R
O
P
E
R
T
Y
L
I
N
E
PARCEL 217927101002
ADU
AS-BUILT SITE PLAN
Project # 02205-0002Date: 11/21/25By: WDAN
Scale: 1" = 40'
2789 Riverside Parkway
Grand Junction, CO 81501