Loading...
HomeMy WebLinkAboutInstallation Observation 11.21.20252789 Riverside Parkway Grand Junction, Colorado 81501 Phone: 970-255-8005 Info@huddlestonberry.com November 21, 2025 Project#02205-0002 Casey Sheets 59 County Road 317 Rifle, Colorado 81650 Subject: OWTS Installation Inspection Parcel 217927101002 ADU Silt, Colorado Reference:OWTS Design, Parcel 217927101002 ADU, Silt, Colorado by Huddleston-Berry Engineering & Testing, LLC for Casey Sheets, May 12, 2025. Dear Mr. Sheets, In accordance with Garfield County and State of Colorado regulations, Huddleston-Berry Engineering & Testing, LLC (HBET) conducted inspection of the installed Onsite Wastewater Treatment System (OWTS) at Parcel 217927101002 in Silt, Colorado. As indicated in the referenced report, HBET completed engineering design of the system. Based upon our inspection, HBET certifies that the OWTS was constructed in accordance with the design. The as-built site plan is attached. Please contact us if you have any questions or comments regarding the contents of this letter. Respectfully Submitted: Huddleston-Berry Engineering and Testing, LLC Wayne D. Anderson, P.E. Project Engineer Cc: Garfield County Building Department 11/21/25 ATTACHMENTS WATER LINE NEW ADU STA EX. STA REPAIR AREA EX. SHOP EX. RESIDENCE 1,000 GALLON TANK P R O P E R T Y L I N E PARCEL 217927101002 ADU AS-BUILT SITE PLAN Project # 02205-0002Date: 11/21/25By: WDAN Scale: 1" = 40' 2789 Riverside Parkway Grand Junction, CO 81501