HomeMy WebLinkAboutInstallation Observation2789 Riverside Parkway
Grand Junction, Colorado 81501
Phone: 970-255-8005
Info@huddlestonberry.com
November 21, 2025
Project#03019-0001
Mr. Kyle Byman
kylebyman@icloud.com
Subject: OWTS Installation Inspection
213 County Road 228
Silt, Colorado
Reference:OWTS Design, 213 County Road 228, Silt, Colorado by Huddleston-Berry
Engineering & Testing, LLC for Kyle Byman, September 3, 2025.
Dear Mr. Byman,
In accordance with Garfield County and State of Colorado regulations, Huddleston-Berry
Engineering & Testing, LLC (HBET) conducted inspection of the installed Onsite Wastewater
Treatment System (OWTS) at 213 County Road 228 in Silt, Colorado. As indicated in the
referenced report, HBET completed engineering design of the system.
Based upon our inspection, HBET certifies that the OWTS was constructed in accordance with
the design. The as-built site plan is attached. Please contact us if you have any questions or
comments regarding the contents of this letter.
Respectfully Submitted:
Huddleston-Berry Engineering and Testing, LLC
Wayne D. Anderson, P.E.
Project Engineer
Cc: Garfield County Building Department
11/21/25
ATTACHMENTS
WATER LINE
NEW RESIDENCE
1,250
GALLON
TANK
NEW STA
REPAIR
AREA
PUMP HOUSE
ABANDONED
RESIDENCE-TO BE
REMOVED
213 COUNTY ROAD 228
AS-BUILT SITE PLAN
Project # 03019-0001Date: 11/21/25By: WDA
N
Scale: 1" = 40'
2789 Riverside Parkway
Grand Junction, CO 81501