HomeMy WebLinkAboutInstallation Observation 06.26.20252789 Riverside Parkway
Grand Junction, Colorado 81501
Phone: 970-255-8005
Info@huddlestonberry.com
June 26, 2025
Project#02961-0001
Ms. Catherine Placek
68 Scutter Ridge Road
Rifle, Colorado 81650
Subject: OWTS Installation Inspection
Lot 14 Rapids View Lane
Parcel 218104307014
New Castle, Colorado
Reference: OWTS Design, Lot 14 Rapids View Lane, Parcel 218104307014, New Castle,
Colorado by Huddleston-Berry Engineering & Testing, LLC for Catherine
Placek, January 30, 2025.
Dear Ms. Placek,
In accordance with Garfield County and State of Colorado regulations, Huddleston-Berry
Engineering & Testing, LLC (HBET) conducted inspection of the installed Onsite Wastewater
Treatment System (OWTS) at Lot 14 Rapids View Lane in New Castle, Colorado. As indicated
in the referenced report, HBET completed engineering design of the system.
Based upon our inspection, HBET certifies that the OWTS was constructed in accordance with
the design. The as-built site plan is attached. Please contact us if you have any questions or
comments regarding the contents of this letter.
Respectfully Submitted:
Huddleston-Berry Engineering and Testing, LLC
Wayne D. Anderson, P.E.
Project Engineer
Cc: Garfield County Building Department
ATTACHMENTS
WATER LINE
NEW RESIDENCE
REPAIR
AREA
1,000
GALLON
TANK
STA
IRRIGATION LINE EASEMENT
APPROXIMATE WATERS
EDGE OF COLORADO RIVER
RIVER ACCESS EASEMENT
UTILITY, DRAINAGE, AND
IRRIGATION EASEMENT
UTILITY, DRAINAGE, AND
IRRIGATION EASEMENT
UTILITY, DRAINAGE, AND
IRRIGATION EASEMENT
PARCEL 218104307014
AS-BUILT SITE PLAN
Project # 02961-0001
Date: 06/26/25
By: WDA
N
Scale: 1" = 40'
2789 Riverside Parkway
Grand Junction, CO 81501