Loading...
HomeMy WebLinkAboutInstallation Observation 06.26.20252789 Riverside Parkway Grand Junction, Colorado 81501 Phone: 970-255-8005 Info@huddlestonberry.com June 26, 2025 Project#02961-0001 Ms. Catherine Placek 68 Scutter Ridge Road Rifle, Colorado 81650 Subject: OWTS Installation Inspection Lot 14 Rapids View Lane Parcel 218104307014 New Castle, Colorado Reference: OWTS Design, Lot 14 Rapids View Lane, Parcel 218104307014, New Castle, Colorado by Huddleston-Berry Engineering & Testing, LLC for Catherine Placek, January 30, 2025. Dear Ms. Placek, In accordance with Garfield County and State of Colorado regulations, Huddleston-Berry Engineering & Testing, LLC (HBET) conducted inspection of the installed Onsite Wastewater Treatment System (OWTS) at Lot 14 Rapids View Lane in New Castle, Colorado. As indicated in the referenced report, HBET completed engineering design of the system. Based upon our inspection, HBET certifies that the OWTS was constructed in accordance with the design. The as-built site plan is attached. Please contact us if you have any questions or comments regarding the contents of this letter. Respectfully Submitted: Huddleston-Berry Engineering and Testing, LLC Wayne D. Anderson, P.E. Project Engineer Cc: Garfield County Building Department ATTACHMENTS WATER LINE NEW RESIDENCE REPAIR AREA 1,000 GALLON TANK STA IRRIGATION LINE EASEMENT APPROXIMATE WATERS EDGE OF COLORADO RIVER RIVER ACCESS EASEMENT UTILITY, DRAINAGE, AND IRRIGATION EASEMENT UTILITY, DRAINAGE, AND IRRIGATION EASEMENT UTILITY, DRAINAGE, AND IRRIGATION EASEMENT PARCEL 218104307014 AS-BUILT SITE PLAN Project # 02961-0001 Date: 06/26/25 By: WDA N Scale: 1" = 40' 2789 Riverside Parkway Grand Junction, CO 81501