Loading...
HomeMy WebLinkAboutOWTS Installation Observations 10.03.20252789 Riverside Parkway Grand Junction, Colorado 81501 Phone: 970-255-8005 Info@huddlestonberry.com October 3, 2025 Project#02716-0002 J. Martinez & Co. 1161 Munro Avenue Rifle, Colorado 81650 Attention: Mr. Tyler Miles Subject: OWTS Installation Inspection 5322 County Road 243 New Castle, Colorado Reference: OWTS Design, 5322 County Road 243, New Castle, Colorado by Huddleston- Berry Engineering & Testing, LLC for J. Martinez & Co., September 20, 2024. Dear Mr. Miles, In accordance with Garfield County and State of Colorado regulations, Huddleston-Berry Engineering & Testing, LLC (HBET) conducted inspection of the installed Onsite Wastewater Treatment System (OWTS) at 5322 County Road 243 in New Castle, Colorado. As indicated in the referenced report, HBET completed engineering design of the system. Based upon our inspection, HBET certifies that the OWTS was constructed in accordance with the design. The as-built site plan is attached. Please contact us if you have any questions or comments regarding the contents of this letter. Respectfully Submitted: Huddleston-Berry Engineering and Testing, LLC Wayne D. Anderson, P.E. Project Engineer Cc: Garfield County Building Department ATTACHMENTS REPAIR AREA STA NEW RESIDENCE STA PROP E R T Y L I N E P R O P E R T Y L I N E 1,250 GALLON TANK 5322 COUNTY ROAD 243 AS-BUILT SITE PLAN Project # 02716-0001 Date: 10/03/25 By: WDA N Scale: 1" = 40' 2789 Riverside Parkway Grand Junction, CO 81501