Loading...
HomeMy WebLinkAbout9.15 Annual Report PA-41-9 12.03.2025TEP ROCKY M O U N T A I N December 3, 2025 Garfield County Building and Planning Attn: Glenn Hartmann 108 8th Street, Suite 401 Glenwood Springs, CO 81601 RE: Land Use Change under Major Impact Review — Resolution 2010-08 2025 Annual Report - GV 82-5 pad location Township 7 South, Range 95 West, 6th P.M. Section 5: NW1/4SE1/4 Garfield County, Colorado Dear Mr. Hartmann: Per the conditions of approval listed in the Resolution 2010-08 associated with the GV 82-5 pad location: 9. The Applicant shall be required to submit a report annually, tiintil such time as the well pad is released from the COGCC reclamation bond, of the extraction andprocessing operation, for staff review. Upon review of any deficiencies pursuant to conditions of approval or other local, state, or federalpermits, Staff may. forward the report to the County Commissioners for fill review of the Special Use Permit. On the GV 82-5 location, normal operations occurred this year which include the following: 03/30/2025 GV 82-5 Pad Pre-emergent/bare ground Treatment There was no reclamation or workover activity on this pad for 2025. TEP personnel and contractors continually monitor and maintain production equipment, water removal, and production as needed. TEP has reviewed the conditions set forth in the Major Impact Review and remains compliant under the conditions of the resolution listed above. After reviewing this annual report, please email me at brvan.hotard@flvwheelenergv.com or call me at (970) 263-2754 (0) or (970) 361-2006 (C) if any additional information is needed. Sincerely, TEP Rocky Mountain LLC Bryan S. Hotard Surface Team Lead — Piceance Basin 1058 County Road 215 1 Parachute, CO 81635