HomeMy WebLinkAbout9.15 Annual Report PA-41-9 12.03.2025TEP ROCKY
M O U N T A I N
December 3, 2025
Garfield County Building and Planning
Attn: Glenn Hartmann
108 8th Street, Suite 401
Glenwood Springs, CO 81601
RE: Land Use Change under Major Impact Review — Resolution 2010-08
2025 Annual Report - GV 82-5 pad location
Township 7 South, Range 95 West, 6th P.M.
Section 5: NW1/4SE1/4
Garfield County, Colorado
Dear Mr. Hartmann:
Per the conditions of approval listed in the Resolution 2010-08 associated with the GV 82-5 pad
location:
9. The Applicant shall be required to submit a report annually, tiintil such time as the well pad is
released from the COGCC reclamation bond, of the extraction andprocessing operation, for staff
review. Upon review of any deficiencies pursuant to conditions of approval or other local, state, or
federalpermits, Staff may. forward the report to the County Commissioners for fill review of the
Special Use Permit.
On the GV 82-5 location, normal operations occurred this year which include the following:
03/30/2025 GV 82-5 Pad Pre-emergent/bare ground Treatment
There was no reclamation or workover activity on this pad for 2025. TEP personnel and contractors
continually monitor and maintain production equipment, water removal, and production as needed.
TEP has reviewed the conditions set forth in the Major Impact Review and remains compliant under
the conditions of the resolution listed above.
After reviewing this annual report, please email me at brvan.hotard@flvwheelenergv.com or call
me at (970) 263-2754 (0) or (970) 361-2006 (C) if any additional information is needed.
Sincerely,
TEP Rocky Mountain LLC
Bryan S. Hotard
Surface Team Lead — Piceance Basin
1058 County Road 215 1 Parachute, CO 81635