Loading...
HomeMy WebLinkAboutOWTS Permit Garfield County Public Health 2014 Blake Ave. Glenwood Springs, CO 81601 Phone: (970) 945-6614 ext. 8150 For inspections, call: 970-945-6614 ext. 8150 and call the Design Engineer, if applicable Project Address: 409 County Road 265, Rifle, CO 81650 Parcel No.: 217708400015 Owner Name: Taani Martinez Owner Phone: (970) 379-5530 Designed By: Capstone Enterprises West, LLC Designer Phone: (970) 250-3331 Number of Bedrooms: _3_ Minimum Tank Capacity: 1,000-gallon Minimum Absorption: 900 ft2 OWTS PERMIT KEEP AVAILABLE AT PROJECT SITE Permit Number _SEPT-9524_______________________________ Permit Type X New X Repair X Remodel/addition X Tank only Issue Date _12/10/2025____________________ Expiration Date_12/10/2026_________________ Permit Conditions: This OWTS Permit to connect a garage bathroom to the existing OWTS is approved on the condition of compliance with the report and design as submitted by Capstone Enterprises West, LLC dated April 22, 2022 with the condition of approval included below. Changes to the design and permit must be approved by Garfield County Public Health and the designer prior to construction. The new OWTS was designed and installed without an appropriate OWTS permit in 2022. The installed OWTS serves a three-bedroom residence and the components consist of a 1,000-gallon two compartment septic tank on the CDPHE approved list, set level with access to grade and an effluent filter installed in the outlet tee of the tank. Effluent gravity flows to a new distribution box set level with access to grade that distributes effluent to 912 ft2 of STA. The STA consists of two 12- feet wide by 38-feet long pipe and gravel beds. Inspection ports had been installed on the out corners of each bed. Per Garfield County OWTS Regulation Section 43.10.F.6.a, additional inspection ports are required at the inside corners of each bed as a condition of approval of this permit. Maintain all setbacks and elevations as designed. To assist in scheduling, please contact Garfield County Public Health (970-945-6614 ext. 8150) to notify the start of OWTS construction. Contact the designer and Garfield County Public Health at least 48 hours prior to requesting final inspection of the installed system prior to backfill. NO OWTS COMPONENT SHALL BE BACKFILLED WITHOUT PRIOR APPROVAL FROM GARFIELD COUNTY PUBLIC HEALTH AND THE DESIGNER. Agreement All installations must comply with all requirements of the Garfield County OWTS regulations including but not limited to the conditions specified above. In consideration of the issuance of the permit, the applicant hereby agrees to comply with all laws and regulations related to the zoning, location, construction, and erection of the proposed OWTS and associated structures for which this permit is granted. The applicant further agrees that if the above said regulations are not fully complied with in the zoning, location, erection, and construction of the above described OWTS and structure, the permit may then be revoked by notice from the Health Department and immediately become null and void. The issuance of a permit and specifications of terms and conditions therein will not constitute assumption of liability, nor create presumption that the local public health agency or its employees may be liable for the failure or malfunctioning of any system. Permit issuance will not constitute a certification that the system, the equipment used in the system, or any component used for system operation will ensure continuous compliance with the provision of the OWTS Act, the regulations adopted thereunder, or any terms and conditions of a permit. Permit Approval Plans and specifications for the proposed OWTS have been reviewed and are considered satisfactory. Permission is hereby given to the property owner(s) to perform the work indicated in accordance with the Garfield County OWTS Regulation. This Permit will expire 1 year from the date of issuance unless construction on the system has commenced. An "as-built" drawing must be submitted and inspection of the system must be completed by GCPH before final approval of the system will be issued. 12/10/2025 Issued By: Garfield County Environmental Health Department Date