Loading...
HomeMy WebLinkAboutState of Colorado-Defered InspectionsCOLORADO - �Department of Local Affairs i �vi�7 vs tirn:s3nc Building Department Representitive Printed Name d TV Building Department Representitive Signature —,::)� Title C4�ult_Dt►sG.- Cs�'rtGl/t— Date 57-15- X 11 Accept �4 Defer Inspection If applicable: Fire Safety Official Printed JULY2023 Contact email: �i.kM+O Q G Vrr l0-bed14V ► RCO. GOAT Fire Safety Official Signature Da Contact email: Is a fire protection system required? (check one) Required Not Required If required, the inspection is to be performed by (check one): Fire Department: (NAME OR Colorado Division of Fire Prevention Et Control Manufacturer's Authorized Quality Assurance Representative Printed Name Ken Brower Manufacturer's Authorized Quality Assurance Representative Signature KeiA. Brows Date 01 /09/2025 Contact email: ken.brower@cavco.com If the inspection has been deferred and the manufacturer elects to utilize an Approved Third Party Agency to inspect the "OC" items on behalf of DOH, please sign and date below. Approved Third Party Agent Printed Name Mike Faller Approved Third Party Agent Signature A&4, Fa&,, Date 01/09/2025 Contact email: mfaller@icc-nta.org GCva -in1 JA:-e.. S. PG. _ NiCv ;A, Garda Ex--Cutive Adsoi`: George, Division Dif'ec;3r i_•..: S r�rT arl St ';QO". ;_C:. Dc":'i' C E;2 .l.i 3 3.8n4 �' 3'_ 8�-. '8 ! TD;J; %. ,�;�. ab� ?;>;: :�Nti;. 3<a.colo a�1.O. _ EOUA. HOUSING � J 3PPpkaV�liY :j :M