Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Estimate
f:> w-- ..L. r.o>,"( PATtF- TractELNSplit Subdivision Improvements ENGINEER'S ESTIMATED COST December 4, 2025 Quantity Engineers Estimate Item Description Unit Cost Cost 1 Mobilization 1 L.S. $2,500 $2,500 2 Sediment Control Fence 1250 L.F. $3 $3,750 3 Project Excavation (Cut, Fill & Compaction) 1000 CY $8 $7,500 4 Minturn Road Class 6 Base Course 200 CY $68 $13,600 5 Triple 24" Aluiminized Type 2 Corrugated Steel Pipe inc/Bedding/Compct'n 80 LF $100 $8,000 6 Twin 24" Aluiminized Type 2 Corrugated Steel Pipe inc/Bedding/Compct'n 54 LF $90 $4,860 7 Single 24" Aluiminized Type 2 Corrugated Steel Pipe inc/Bedding/Coinpet'r 26 CY $80 $2,080 8 24" Flared End Sections inc/ Bedding & Compaction 12 EA $1,250 $15,000 9 12" d50 Native Rip Rap on filter cloth 65 SY $35 $2,275 10 "No Parking Fire Lane" signs 10 EA $325 $3,250 11 Concrete filled steel bollard 3 EA $500 $1,500 12 Revegetation 1 LS $5,000 $5,000 13 Weed Control (Spring application and 2 spot treatments 1 LS $4,500 $4,500 14 Erosion Logs 100 EA $10 $1,000 15 Construction staking I LS $2,500 $2,500 Subtotal $74,815 10% SIA Multiplier $7,482 TOTAL $82,297 1 of 1