HomeMy WebLinkAboutStamped Plans 11.05.25 rev3MAIN LEVEL MECHANICAL FLOOR PLAN
SCALE: 1/8" = 1'-0"
MECHANICAL EQUIPMENT LIST AIR DEVICES
BB-1 ELECTRIC BASEBOARD
RUNTAL MODEL E133-72-120D
879 WATTS, 3000 BTUH
120 VOLT
BB-2 ELECTRIC BASEBOARD
RUNTAL MMODEL EB-120-120D
1466 WATTS, 5000 BTUH
120 VOLT
EF-1 ADMINISTRATION EXHAUST FAN
COOK MODEL SQN-D 100SQN28DO80F
700 CFM, 0.5" S.P.
1/3 HP, 120 VOLT
EF-2 RESTROOM EXHAUST FAN
PANASONIC MODEL FV 0511 VF1
80 CFM, 0.25 E.S.P.
9.4 WATTS, 120 VOLTS
FC-1 FAN COIL UNIT - SERVICE TO ADMINISTRATION
ARMSTRONG MODEL 77 AH 2 A E 60 P X-71
1700 CFM, 700 CFM 0/A, 0.5" S.P.
36.2 MBH SENS. CLG, 42.6 MBH TOTAL CLG
49.0 MBH HEATING (HEAT PUMP)
12.5 KW ELECTRIC HEAT (AUXILIARY)
1 HP BLOWER MOTOR
66 MCA, 70 MFS
208 VOLT, 1 PHASE - SINGLE POINT CONNECTION
PROVIDE COMPLETE WITH 2" MERV 13 PLEATED MEDIA FILTER
FC-2 NOT USED
HP-1 HEAT PUMP - ASSOCIATED WITH FC-1
ARMSTRONG MODEL 4 SHP 17 LE 1 60 P - 51 A
NOMINAL 5-TON HEATING / COOLING CAPACITY
26.5 FLA, 32.5 MCA, 50 MCA
208 VOLT, 1 PHASE
PROVIDE COMPLETE WITH 1-1/8" x 3/8" REFRIGERANT LINE SET
HP-2 NOT USED
RT-1 EXISTING ELECTRIC / GAS ROOFTOP HVAC UNIT
TRANE MODEL YCD 360 B E P 2
30 TON COOLING - NOMINAL CAPACITY
600,000 BTUH HEATING, 355,200 BTUH OUTPUT, 6,500 FT. ELEV.
12,000 CFM NOMINAL S/A, BALANCE TO 4100 CFM MINIMUM O/A
150.4 FLA, 185 MCA, 225 MOP
208 VOLT, 3 PHASE
SEE RE -COMMISSIONING REQUIREMENTS - DRAWING M-2 - FOR START-UP /
COM ISS ON NG
UH-1 GAS FIRED UNIT HEATER
REZNOR MODEL UDAS 100
100 MBH INPUT, NATURAL GAS
64.1 MBH OUTPUT, 6,600 FT. ELEV.
3.9 AMPS, 120 VOLTS
TYPICAL OF TWO UNITS
LV-1 ADMINISTRATION OFFICE OUTSIDE AIR
RUSKIN ELF 375 DX
24" x 12" TALL
LV-2 ADMINISTRATION OFFICE EXHAUST
RUSKIN ELF 375 DX
24 X 12 I AL
SA-1 SUPPLY AIR REGISTER
KRUEGER MODEL 5880 - DOUBLE DEFLECTION
14" x 6" W/ HORIZONTAL FRONT BLADES
PROVIDE WITH OPPOSED BLADE BALANCING DAMPER
AND FRAME FOR GYPBOARD WALL MOUNTING
SA-2 IS SIMILAR EXCEPT PROVIDE FRAME FOR SHEET
METAL MOUNTING
SA-3 CEILING DIFFUSER
KRUEDGER 1400 SERIES
4-CONE WITH FRAME FOR GRID CEILING INSTALLATION
I�►Ixy:�yr���71_l���l_rry:�:i1P►Qillji�lll��yr��
RA-1 RETURN AIR GRILLE
KRUEGER S580 - 34° BLADE DEFLECTION
30" x 12" TALL
PROVIDE WITH FRAME FOR GYPBOARD WALL MOUNTING
GENERAL NOTES
1. PROVIDE LABOR AND MATERIALS REQUIRED FOR COMPLETE AND OPERATIONAL
MECHANICAL (HVAC) SYSTEMS.
2. ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF THE GOVERNING CODE
AUTHORITIES.
)ING 3. ALL WORK SHALL COMPLY WITH AND BE COORDINATED WITH REQUIREMENTS OF
ARCHITECTURAL PLANS AND EXISTING CONSTRUCTION AT THE TIME OF
INSTALLATION.
4. WHERE DESIGN INFORMATION IS IN -ADEQUATE OR INCOMPLETE WITH REGARD TO
PROJECT SCOPE OR CODE / ORDINANCE COMPLIANCE IN ORDER TO PROVIDE A
COMPLETE PROJECT BID OR PRICE, THE MECHANICAL AND / OR PLUMBING
SUB -CONTRACTORS) SHALL BRING SUCH TO THE ATTENTION OF THE ARCHITECT OR
ENGINEER PRIOR TO BIDDING OR PRICING THE PROJECT.
IMPLICIT IN SUBMISSION OF A BID OR PRICE TO DO THE WORK IS THE STATEMENT
THAT THE PROJECT SCOPE AS SHOWN ON THE PLANS WILL BE INSTALLED COMPLETE,
OPERATIONAL, AND IN ACCORDANCE WITH APPLICABLE CODES AND STANDARDS.
5. INSTALL EQUIPMENT TO BE READILY ACCESSIBLE FOR SERVICE AND MAINTENANCE.
REVIEW PROPOSED INSTALLATION WITH OWNER AND ARCHITECT PRIOR TO STARTING
WORK.
6. OBTAIN WRITTEN APPROVAL FROM THE ARCHITECT OR STRUCTURAL ENGINEER
BEFORE NOTCHING, CHIPPING, BURNING, DRILLING OR WELDING OF STRUCTURAL
MEMBERS.
7. MAKE ALL DUCT CONNECTIONS TO FAN COIL UNITS, MAKE-UP AIR UNIT, AND EXHAUST
FANS WITH FLEXIBLE CONNECTIONS.
8. COORDINATE FINAL CEILING GRILLE AND EXHAUST FAN LOCATIONS WITH GENERAL
CONTRACTOR AND LIGHTING LAYOUT PRIOR TO ROUGH -IN.
9. SEAL ALL DUCT JOINTS AND CONNECTIONS TO EQUIPMENT AIR TIGHT.
10. NOT ALL DUCTWORK OFFSETS AND TRANSITIONS REQUIRED TO INSTALL THE WORK IN
THE AVAILABLE SPACE ARE SHOWN ON THIS DRAWING. FIELD MEASURE FOR EXACT
REQUIREMENTS AND INSTALL ACCORDINGLY.
11. UNLESS OTHERWISE NOTED, ALL DIFFUSER RUN -OUT DUCTS IN ACCESSIBLE
LOCATIONS SHALL BE INSTALLED WITH BUTTERFLY DAMPERS AT TAP TO MAIN TRUNK
DUCT.
12. PAINT ALL DUCTWORK VISIBLE BEHIND AIR DEVICES MATTE BLACK.
13. ALL DUCT DIMENSIONS NOTED ARE CLEAR INSIDE.
14. RECTANGULAR DUCTWORK ASSOCIATED FAN COIL UNITS SHALL BE GALVANIZED
SHEET METAL WITH 1/2", 3# FIBERGLASS DUCT LINING.
15. ROUND DUCTWORK IN ACCESSIBLE CEILING AREAS SHALL BE SNAP LOCK.
16. FLEX DUCTS SHALL BE INSULATED, NOT MORE THAN 5'-0" LONG; TAPE OFF ALL RAW
EDGES OF INSULATION.
17. OUTSIDE AIR DUCTS SHALL BE INSULATED WITH 1" EXTERIOR DUCT WRAP, R8.0
MINIMUM.
18. INSULATE RIGID ROUND DUCTS ASSOCIATED WITH FAN COIL UNITS EXTERNALLY WITH
R-6.0 "INSUL-SLEEVE".
19. INSTALL DUCTWORK PER SMACNA STANDARDS.
20. ALL THERMOSTAT WIRES SHALL BE ROUGHED IN USING 6-WIRE CABLE.
21. BEFORE STARTING WORK, SUBMIT EQUIPMENT SHOP DRAWINGS AND SUBMITTALS
REQUIRED FOR PROJECT.
IDENTIFY EACH ITEM WITH SUFFICIENT DATA TO CERTIFY COMPLIANCE WITH
MECHANICAL EQUIPMENT LIST.
PURPOSE OF SHOP DRAWINGS AND SUBMITTALS IS TO DEMONSTRATE THAT
CONTRACTOR UNDERSTANDS DESIGN CONCEPT. IF DEVIATIONS, DISCREPANCIES, OR
CONFLICTS BETWEEN SHOP DRAWINGS AND SUBMITTALS AND CONTRACT
DOCUMENTS ARE DISCOVERED EITHER PRIOR TO OR AFTER SUBMITTALS ARE
PROCESSED, DESIGN DRAWINGS AND SPECIFICATIONS TAKE PRECEDENCE.
ARCHITECT / ENGINEER REVIEW: ARCHITECT / ENGINEER REVIEW OF SHOP DRAWINGS
AND SUBMITTALS AND ACTION INDICATED AS RESULT OF THIS REVIEW IS COURTESY
EXTENDED TO CONTRACTOR BY REPRESENTATIVE OF OWNER. THIS SERVICE IS
INTENDED TO MINIMIZE DELIVERY TO JOB SITE AND INSTALLATION OF MATERIALS
THAT DO NOT MEET OWNER'S REQUIREMENTS FOR BUILDING. SUBMISSION OF
MATERIAL FOR THIS ACTION DOES NOT ALTER BASIC INTENT OF SPECIFICATIONS AND
CONTRACTOR'S RESPONSIBILITY TO COMPLY THEREWITH.
22. PROVIDE FOR AIR SIDE TEST AND BALANCE AT COMPLETION OF PROJECT. TEST AND
BALANCE REPORT SHALL BE PROVIDED BY TABB OR NEBB CERTIFIED COMPANY OR
OTHER SUB -CONTRACTOR AS APPROVED BY THE ENGINEER OF RECORD. TEST AND
BALANCE REPORT SHALL BE SUBMITTED TO THE GENERAL CONTRACTOR AND
ENGINEER PRIOR TO FINAL APPLICATION FOR PAYMENT.
PLAN NOTES
O1 TERMINATE EF-2 EXHAUST DUCT WITH PAINTABLE WALL CAP.
O2 RE: ELECTRICAL POWER PLANS FOR BB-1 / BB-2 CONTROL REQUIREMENTS.
n I NTERLOCK_EF-2 T2 RULL WLTH-SPACE LI G .T .
OEXHAUST FAN EF-A, B, C, D, AND E CONTROL SWITCHES SHALL BE
BE CO -LOCATED WITH RT-1 THERMOSTAT - RE: DWG E-1.
O NOT USED
O INSTALL BUTTERFLY BALANCING DAMPER AT TAP TO S/A TRUNK DUCT.
O7 MAKE 16"o TO 18"o TRANSITION WITHIN 60" OF CONNECTION TO SA-4.
O8 MAKE 18"0 TAP / BUTTERFLY CONNECTION TO BOTTOM OF TRUNK DUCT.
O9 FIELD MEASURE EXISTING R/A CONNECTION AND VERIFY MINIMUM
1,000 SQ. INCHES FREE AREA (APPROX. 7 S.F.). FIELD FABRICATE
48" x 48" EXPANDED METAL GRATE W/ MINIMUM 50% FREE AREA TO COVER
COVER RETURN OPENING.
10 COODINATE WITH G.C. AS REQUIRED TO PROVIDE 1" DOOR UNDER -CUT.
BAt,
'U
v,
W
~ w
�w0
Uz
O
rocr
J
Z D8E
Q �w
c')
0
LL
co
Q 8 09
�Z
rVR �
V
W
F_
Z
Q
0
rod
V
U
04
0�
Z
w��
Q
J
=
_
O
Q
0
W
W
Z
J
Q
V
cr
cr
�W
V,
INN/
REVISION NO. DATE
PERMIT 04/01/25
BCKGND REV 05/02/25
REV #2 10/22/25
REV #3 11/05/25
\ /
'DRAWING TITLE:
MAIN LFVEL
HVAC PLAN
DATE: 03/IsF/Z�
SCALE:
PROD. NO. ZFrppS
DRAWN 15Y: PAI
GHK'D f5Y: MA15
EXISTING ROOF VENT / DUCT
TERMINATIONS TO BE REMOVED.
CAP EXISTING CURB WEATHERTIGHT
RT-1 — RE —COMMISSIONING REQUIREMENTS
1. ROOFTOP UNIT SHALL BE STARTED AND COMMISSIONED BY TRANE
FACTORY SERVICE REPRESENTATIVE.
TRANE SERVICE DEPARTMENT - GRAND JUNCTION, CO
(970) 248-3970
ATTN: MR. MATT ALOISI
2. PRIOR TO START-UP, THE FACTORY SERVICE REPRESENTATIVE SHALL
COORDINATE WITH THE GENERAL CONTRACTOR AND MECHANCIAL
SUB -CONTRACTOR TO FURNISH AND INSTALL NEW THERMOSTATIC CONTROL
FOR THE UNIT.
3. COMMISSIONING SHALL BE IN ACCORDANCE WITH MANUFACTURER
RECOMMENDATIONS FOR NEW INSTALLATION.
4. COMMISSIONING SHALL INCLUDE, BUT NOT BE LIMITED TO:
- VERIFICATION OF POWER SERVICE
- VERIFICATION OF NATURAL GAS SERVICE
- AIR FILTER CHANGE
- OPERATION OF UNIT TO FULL HEATING CAPACITY
- OPERATION OF UNIT TO VERIFY PART LOAD HEATING CAPACITY
- OPERATION OF UNIT TO FULL COOLING CAPACITY
- OPERATION OF UNIT TO VERIFY PART LOAD COOLING CAPACITY
- VERIFICATION OF THERMOSTATIC CONTROL
- VERIFICATION OF ECONOMIZER OPERATION
5. PROVIDE A STANDARD FACTORY COMMISSIONING REPORT UPON
COMPLETION. REPORT SHALL FLAG ITEMS IN NEED OF SERVICE AND
SHALL PROVIDE A PROPOSAL FOR YEARLY FACTORY CERTIFIED SERVICE,
INCLUDING RECOMMENDED SERVICES TO BE PROVIDED AND RECOMMENDED
SERVICES TO BE PERFORMED ON A QUARTERLY (OR AS OTHERWISE RECOMMENDED)
BASIS BY THE OWNER.
6. FACTORY SERVICE SHALL PROVIDE FOR COORDINATION WITH TEST AND BALANCE
SUB -CONTRACTOR AS REQUIRED TO SET SPECIFIED AIR FLOW REQUIREMENTS.
- TEST AND BALANCE SUB -CONTRACTOR SHALL PROVIDE FOR
INDOOR TO OUTDOOR STATIC PRESSURE MEASUREMENT AT FULL
ECONOMIZER OPERATION (100% OUTSIDE AIR) AND 100% POWERED
EXHAUST OPERATION.
- AFTER MEASURING AND RECORDING INDOOR / OUTDOOR STATIC
PRESSURE WITH ONLY THE POWERED EXHAUST FAN, START EXISTING
EXHAUST FANS EF-A, B, C, D AND E IN ORDER AND RECORD STATIC
PRESSURE DIFFERENCE AT EACH STEP.
0
U
Z
W
~ w
�w0
Uz
'uO) AL
_ro O 8
J
QZ D8E
p a:
06
Q -co
0
oc o
O
O
W
F_
Z
Q 0
� U
C�
CK)0
co>z
W��
J =
°C-O
Q =
0
Z
0 W W
Z J
Q (�
W
REVISION NO. DATE
REV #2 10/22/25
REV #3 11/05/25
DRAWING TITLE:
LC-O IANIOAL
HOOF PLAN
DATE: 10/22/2a
SCALE: 1/r = I'-e
PROD. NO. 25--005
DRAWN 13Y:13A1
GHKP 13Y: MAC
DRAWING NO.
M-2