Loading...
HomeMy WebLinkAboutStamped Plans 11.05.25 rev3MAIN LEVEL MECHANICAL FLOOR PLAN SCALE: 1/8" = 1'-0" MECHANICAL EQUIPMENT LIST AIR DEVICES BB-1 ELECTRIC BASEBOARD RUNTAL MODEL E133-72-120D 879 WATTS, 3000 BTUH 120 VOLT BB-2 ELECTRIC BASEBOARD RUNTAL MMODEL EB-120-120D 1466 WATTS, 5000 BTUH 120 VOLT EF-1 ADMINISTRATION EXHAUST FAN COOK MODEL SQN-D 100SQN28DO80F 700 CFM, 0.5" S.P. 1/3 HP, 120 VOLT EF-2 RESTROOM EXHAUST FAN PANASONIC MODEL FV 0511 VF1 80 CFM, 0.25 E.S.P. 9.4 WATTS, 120 VOLTS FC-1 FAN COIL UNIT - SERVICE TO ADMINISTRATION ARMSTRONG MODEL 77 AH 2 A E 60 P X-71 1700 CFM, 700 CFM 0/A, 0.5" S.P. 36.2 MBH SENS. CLG, 42.6 MBH TOTAL CLG 49.0 MBH HEATING (HEAT PUMP) 12.5 KW ELECTRIC HEAT (AUXILIARY) 1 HP BLOWER MOTOR 66 MCA, 70 MFS 208 VOLT, 1 PHASE - SINGLE POINT CONNECTION PROVIDE COMPLETE WITH 2" MERV 13 PLEATED MEDIA FILTER FC-2 NOT USED HP-1 HEAT PUMP - ASSOCIATED WITH FC-1 ARMSTRONG MODEL 4 SHP 17 LE 1 60 P - 51 A NOMINAL 5-TON HEATING / COOLING CAPACITY 26.5 FLA, 32.5 MCA, 50 MCA 208 VOLT, 1 PHASE PROVIDE COMPLETE WITH 1-1/8" x 3/8" REFRIGERANT LINE SET HP-2 NOT USED RT-1 EXISTING ELECTRIC / GAS ROOFTOP HVAC UNIT TRANE MODEL YCD 360 B E P 2 30 TON COOLING - NOMINAL CAPACITY 600,000 BTUH HEATING, 355,200 BTUH OUTPUT, 6,500 FT. ELEV. 12,000 CFM NOMINAL S/A, BALANCE TO 4100 CFM MINIMUM O/A 150.4 FLA, 185 MCA, 225 MOP 208 VOLT, 3 PHASE SEE RE -COMMISSIONING REQUIREMENTS - DRAWING M-2 - FOR START-UP / COM ISS ON NG UH-1 GAS FIRED UNIT HEATER REZNOR MODEL UDAS 100 100 MBH INPUT, NATURAL GAS 64.1 MBH OUTPUT, 6,600 FT. ELEV. 3.9 AMPS, 120 VOLTS TYPICAL OF TWO UNITS LV-1 ADMINISTRATION OFFICE OUTSIDE AIR RUSKIN ELF 375 DX 24" x 12" TALL LV-2 ADMINISTRATION OFFICE EXHAUST RUSKIN ELF 375 DX 24 X 12 I AL SA-1 SUPPLY AIR REGISTER KRUEGER MODEL 5880 - DOUBLE DEFLECTION 14" x 6" W/ HORIZONTAL FRONT BLADES PROVIDE WITH OPPOSED BLADE BALANCING DAMPER AND FRAME FOR GYPBOARD WALL MOUNTING SA-2 IS SIMILAR EXCEPT PROVIDE FRAME FOR SHEET METAL MOUNTING SA-3 CEILING DIFFUSER KRUEDGER 1400 SERIES 4-CONE WITH FRAME FOR GRID CEILING INSTALLATION I�►Ixy:�yr���71_l���l_rry:�:i1P►Qillji�lll��yr�� RA-1 RETURN AIR GRILLE KRUEGER S580 - 34° BLADE DEFLECTION 30" x 12" TALL PROVIDE WITH FRAME FOR GYPBOARD WALL MOUNTING GENERAL NOTES 1. PROVIDE LABOR AND MATERIALS REQUIRED FOR COMPLETE AND OPERATIONAL MECHANICAL (HVAC) SYSTEMS. 2. ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF THE GOVERNING CODE AUTHORITIES. )ING 3. ALL WORK SHALL COMPLY WITH AND BE COORDINATED WITH REQUIREMENTS OF ARCHITECTURAL PLANS AND EXISTING CONSTRUCTION AT THE TIME OF INSTALLATION. 4. WHERE DESIGN INFORMATION IS IN -ADEQUATE OR INCOMPLETE WITH REGARD TO PROJECT SCOPE OR CODE / ORDINANCE COMPLIANCE IN ORDER TO PROVIDE A COMPLETE PROJECT BID OR PRICE, THE MECHANICAL AND / OR PLUMBING SUB -CONTRACTORS) SHALL BRING SUCH TO THE ATTENTION OF THE ARCHITECT OR ENGINEER PRIOR TO BIDDING OR PRICING THE PROJECT. IMPLICIT IN SUBMISSION OF A BID OR PRICE TO DO THE WORK IS THE STATEMENT THAT THE PROJECT SCOPE AS SHOWN ON THE PLANS WILL BE INSTALLED COMPLETE, OPERATIONAL, AND IN ACCORDANCE WITH APPLICABLE CODES AND STANDARDS. 5. INSTALL EQUIPMENT TO BE READILY ACCESSIBLE FOR SERVICE AND MAINTENANCE. REVIEW PROPOSED INSTALLATION WITH OWNER AND ARCHITECT PRIOR TO STARTING WORK. 6. OBTAIN WRITTEN APPROVAL FROM THE ARCHITECT OR STRUCTURAL ENGINEER BEFORE NOTCHING, CHIPPING, BURNING, DRILLING OR WELDING OF STRUCTURAL MEMBERS. 7. MAKE ALL DUCT CONNECTIONS TO FAN COIL UNITS, MAKE-UP AIR UNIT, AND EXHAUST FANS WITH FLEXIBLE CONNECTIONS. 8. COORDINATE FINAL CEILING GRILLE AND EXHAUST FAN LOCATIONS WITH GENERAL CONTRACTOR AND LIGHTING LAYOUT PRIOR TO ROUGH -IN. 9. SEAL ALL DUCT JOINTS AND CONNECTIONS TO EQUIPMENT AIR TIGHT. 10. NOT ALL DUCTWORK OFFSETS AND TRANSITIONS REQUIRED TO INSTALL THE WORK IN THE AVAILABLE SPACE ARE SHOWN ON THIS DRAWING. FIELD MEASURE FOR EXACT REQUIREMENTS AND INSTALL ACCORDINGLY. 11. UNLESS OTHERWISE NOTED, ALL DIFFUSER RUN -OUT DUCTS IN ACCESSIBLE LOCATIONS SHALL BE INSTALLED WITH BUTTERFLY DAMPERS AT TAP TO MAIN TRUNK DUCT. 12. PAINT ALL DUCTWORK VISIBLE BEHIND AIR DEVICES MATTE BLACK. 13. ALL DUCT DIMENSIONS NOTED ARE CLEAR INSIDE. 14. RECTANGULAR DUCTWORK ASSOCIATED FAN COIL UNITS SHALL BE GALVANIZED SHEET METAL WITH 1/2", 3# FIBERGLASS DUCT LINING. 15. ROUND DUCTWORK IN ACCESSIBLE CEILING AREAS SHALL BE SNAP LOCK. 16. FLEX DUCTS SHALL BE INSULATED, NOT MORE THAN 5'-0" LONG; TAPE OFF ALL RAW EDGES OF INSULATION. 17. OUTSIDE AIR DUCTS SHALL BE INSULATED WITH 1" EXTERIOR DUCT WRAP, R8.0 MINIMUM. 18. INSULATE RIGID ROUND DUCTS ASSOCIATED WITH FAN COIL UNITS EXTERNALLY WITH R-6.0 "INSUL-SLEEVE". 19. INSTALL DUCTWORK PER SMACNA STANDARDS. 20. ALL THERMOSTAT WIRES SHALL BE ROUGHED IN USING 6-WIRE CABLE. 21. BEFORE STARTING WORK, SUBMIT EQUIPMENT SHOP DRAWINGS AND SUBMITTALS REQUIRED FOR PROJECT. IDENTIFY EACH ITEM WITH SUFFICIENT DATA TO CERTIFY COMPLIANCE WITH MECHANICAL EQUIPMENT LIST. PURPOSE OF SHOP DRAWINGS AND SUBMITTALS IS TO DEMONSTRATE THAT CONTRACTOR UNDERSTANDS DESIGN CONCEPT. IF DEVIATIONS, DISCREPANCIES, OR CONFLICTS BETWEEN SHOP DRAWINGS AND SUBMITTALS AND CONTRACT DOCUMENTS ARE DISCOVERED EITHER PRIOR TO OR AFTER SUBMITTALS ARE PROCESSED, DESIGN DRAWINGS AND SPECIFICATIONS TAKE PRECEDENCE. ARCHITECT / ENGINEER REVIEW: ARCHITECT / ENGINEER REVIEW OF SHOP DRAWINGS AND SUBMITTALS AND ACTION INDICATED AS RESULT OF THIS REVIEW IS COURTESY EXTENDED TO CONTRACTOR BY REPRESENTATIVE OF OWNER. THIS SERVICE IS INTENDED TO MINIMIZE DELIVERY TO JOB SITE AND INSTALLATION OF MATERIALS THAT DO NOT MEET OWNER'S REQUIREMENTS FOR BUILDING. SUBMISSION OF MATERIAL FOR THIS ACTION DOES NOT ALTER BASIC INTENT OF SPECIFICATIONS AND CONTRACTOR'S RESPONSIBILITY TO COMPLY THEREWITH. 22. PROVIDE FOR AIR SIDE TEST AND BALANCE AT COMPLETION OF PROJECT. TEST AND BALANCE REPORT SHALL BE PROVIDED BY TABB OR NEBB CERTIFIED COMPANY OR OTHER SUB -CONTRACTOR AS APPROVED BY THE ENGINEER OF RECORD. TEST AND BALANCE REPORT SHALL BE SUBMITTED TO THE GENERAL CONTRACTOR AND ENGINEER PRIOR TO FINAL APPLICATION FOR PAYMENT. PLAN NOTES O1 TERMINATE EF-2 EXHAUST DUCT WITH PAINTABLE WALL CAP. O2 RE: ELECTRICAL POWER PLANS FOR BB-1 / BB-2 CONTROL REQUIREMENTS. n I NTERLOCK_EF-2 T2 RULL WLTH-SPACE LI G .T . OEXHAUST FAN EF-A, B, C, D, AND E CONTROL SWITCHES SHALL BE BE CO -LOCATED WITH RT-1 THERMOSTAT - RE: DWG E-1. O NOT USED O INSTALL BUTTERFLY BALANCING DAMPER AT TAP TO S/A TRUNK DUCT. O7 MAKE 16"o TO 18"o TRANSITION WITHIN 60" OF CONNECTION TO SA-4. O8 MAKE 18"0 TAP / BUTTERFLY CONNECTION TO BOTTOM OF TRUNK DUCT. O9 FIELD MEASURE EXISTING R/A CONNECTION AND VERIFY MINIMUM 1,000 SQ. INCHES FREE AREA (APPROX. 7 S.F.). FIELD FABRICATE 48" x 48" EXPANDED METAL GRATE W/ MINIMUM 50% FREE AREA TO COVER COVER RETURN OPENING. 10 COODINATE WITH G.C. AS REQUIRED TO PROVIDE 1" DOOR UNDER -CUT. BAt, 'U v, W ~ w �w0 Uz O rocr J Z D8E Q �w c') 0 LL co Q 8 09 �Z rVR � V W F_ Z Q 0 rod V U 04 0� Z w�� Q J = _ O Q 0 W W Z J Q V cr cr �W V, INN/ REVISION NO. DATE PERMIT 04/01/25 BCKGND REV 05/02/25 REV #2 10/22/25 REV #3 11/05/25 \ / 'DRAWING TITLE: MAIN LFVEL HVAC PLAN DATE: 03/IsF/Z� SCALE: PROD. NO. ZFrppS DRAWN 15Y: PAI GHK'D f5Y: MA15 EXISTING ROOF VENT / DUCT TERMINATIONS TO BE REMOVED. CAP EXISTING CURB WEATHERTIGHT RT-1 — RE —COMMISSIONING REQUIREMENTS 1. ROOFTOP UNIT SHALL BE STARTED AND COMMISSIONED BY TRANE FACTORY SERVICE REPRESENTATIVE. TRANE SERVICE DEPARTMENT - GRAND JUNCTION, CO (970) 248-3970 ATTN: MR. MATT ALOISI 2. PRIOR TO START-UP, THE FACTORY SERVICE REPRESENTATIVE SHALL COORDINATE WITH THE GENERAL CONTRACTOR AND MECHANCIAL SUB -CONTRACTOR TO FURNISH AND INSTALL NEW THERMOSTATIC CONTROL FOR THE UNIT. 3. COMMISSIONING SHALL BE IN ACCORDANCE WITH MANUFACTURER RECOMMENDATIONS FOR NEW INSTALLATION. 4. COMMISSIONING SHALL INCLUDE, BUT NOT BE LIMITED TO: - VERIFICATION OF POWER SERVICE - VERIFICATION OF NATURAL GAS SERVICE - AIR FILTER CHANGE - OPERATION OF UNIT TO FULL HEATING CAPACITY - OPERATION OF UNIT TO VERIFY PART LOAD HEATING CAPACITY - OPERATION OF UNIT TO FULL COOLING CAPACITY - OPERATION OF UNIT TO VERIFY PART LOAD COOLING CAPACITY - VERIFICATION OF THERMOSTATIC CONTROL - VERIFICATION OF ECONOMIZER OPERATION 5. PROVIDE A STANDARD FACTORY COMMISSIONING REPORT UPON COMPLETION. REPORT SHALL FLAG ITEMS IN NEED OF SERVICE AND SHALL PROVIDE A PROPOSAL FOR YEARLY FACTORY CERTIFIED SERVICE, INCLUDING RECOMMENDED SERVICES TO BE PROVIDED AND RECOMMENDED SERVICES TO BE PERFORMED ON A QUARTERLY (OR AS OTHERWISE RECOMMENDED) BASIS BY THE OWNER. 6. FACTORY SERVICE SHALL PROVIDE FOR COORDINATION WITH TEST AND BALANCE SUB -CONTRACTOR AS REQUIRED TO SET SPECIFIED AIR FLOW REQUIREMENTS. - TEST AND BALANCE SUB -CONTRACTOR SHALL PROVIDE FOR INDOOR TO OUTDOOR STATIC PRESSURE MEASUREMENT AT FULL ECONOMIZER OPERATION (100% OUTSIDE AIR) AND 100% POWERED EXHAUST OPERATION. - AFTER MEASURING AND RECORDING INDOOR / OUTDOOR STATIC PRESSURE WITH ONLY THE POWERED EXHAUST FAN, START EXISTING EXHAUST FANS EF-A, B, C, D AND E IN ORDER AND RECORD STATIC PRESSURE DIFFERENCE AT EACH STEP. 0 U Z W ~ w �w0 Uz 'uO) AL _ro O 8 J QZ D8E p a: 06 Q -co 0 oc o O O W F_ Z Q 0 � U C� CK)0 co>z W�� J = °C-O Q = 0 Z 0 W W Z J Q (� W REVISION NO. DATE REV #2 10/22/25 REV #3 11/05/25 DRAWING TITLE: LC-O IANIOAL HOOF PLAN DATE: 10/22/2a SCALE: 1/r = I'-e PROD. NO. 25--005 DRAWN 13Y:13A1 GHKP 13Y: MAC DRAWING NO. M-2