February 19, 2024
Kraig Hutchison
Project Manager
Forge Building Company
2785 N. Bogus Basin Rd.
Boise, ID 83702
RE: RFI #1 — FBC #22166 Freeup Silt Storage — Building L
Dear Mr. Hutchison,
Information Request:
The owner has requested several design changes to Building L. These changes are detailed in redlines
attached to this RFI.
Response to Request:
These changes are approved. Where partition panels are not continuous to the drag strut at the roof level,
added vertical cross bracing must be used. See detailing and locations on the attached plan markups.
This RFI and any attachments are to serve as supplement to the original structural plan set. This does not
permit or allow any alterations to the original design.
If you have any questions, feel free to contact me at the number below.
Sincerely,
Levi Voigt, Principle, PE
STRUX Engineering LLC
PO Box 324
Prairie City, OR 97869
541-620-8071
levi@struxengineerinq corn
Attachments:
1. Revised Lateral Calculations
2. Marked -up Plan Sheet
209 N McHa ley f
Phone; 541.620.8071
p,DO LIC�
56488
2-19-2024
11Page
Prairie City, Oregon 97869
1 www.struxengineering.com
�� ��' �� Client: Forge Building Company
SJob Number: FBC #22166
ENGINEERING L L C Engineer: Levi Voigt
Project: Free Up Storage
Building L
Date:2/19/2024
Shear Wall Design - N/S Direction
Wall Line A
ShearWall
Length
Wall #
L (ft)
H (ft)
A/R
1
60
11.000
0.18
2
70
11.000
0.16
3
0.00
4
0.00
5
0.00
Shear Wall
wwlnd =
117.11
Of
L1eft =
10
ft
(length of wall to the left of SW Line)
Lright =
0
ft
(length of wall to the right of SW Line)
Ltrib =
S
ft
(Wall length tributary to SW Line)
R = wwindLtrib =
S8S.S37
lb
(Force on SW Line)
Lshear =
130
ft
Total Length of Shear Wall
Vwa11=
4.SO413
Of
Unit Shear Force
Provide: SW-2
vca acit min = 208 PH OK
DL On Wall
Type
p (psf)
L (ft)
% of L
w (plf)
Wall DL
S
11.000
100
SS.00
Roof DL
S
S
100
2S.00
DLsum =
80.00
plf
DL = 0.6DLsum =
48.00
plf
Hsw =
11.000
ft
Twa11_1 =
-1332.7
lb
No Uplift, OK Vwa11*Hwa11-0.6DL*(Lwa11/2)
Provide: None
ycapacitl, n,in = 0 pile OK
RLDC
Client: Forge Building Company
SmrJob Number: FBC #22166
ENGINEERING L L C Engineer: Levi Voigt
Project: Free Up Storage
Building L
Date:2/19/2024
Wall Line B
ShearWall
Length
Wall #
L (ft)
H (ft)
A/R
1
15
11.000
0.73
2
25
11.000
0.44
3
30
11.000
0.37
4
0.00
5
0.00
Shear Wall
wwind =
117.11
PH
Lieft =
20
ft
(length of wall to the left of SW Line)
Lright =
10
ft
(length of wall to the right of SW Line)
Ltrib =
15
ft
(Wall length tributary to SW Line)
R = wwindLtrib =
1756.61
lb
(Force on SW Line)
Lshear =
70
ft
Total Length of Shear Wall
Vwa11=
25.0944
plf
Unit Shear Force
Provide: SW-1
vc„ ,acitV_n,in = 166 PH OK
DL On Wall
Type
p (psf)
L (ft)
% of L
w (plf)
Wall DL
5
11.000
100
55.00
Roof DL
5
10
100
50.00
DL,.. =
105.00
plf
DL = 0.6DLsum =
63.00
plf
Hsw =
11.000
ft
Twaii-, =
815.68
lb
Simpson'SB 2' Vwa11*Hwa11-0.6DL*(Lwa11/2)
Provide: None
Wapacity min = 0 PH Simpson 'SB 2'
mr RL' 3C Client: Forge Building Company
Job Number: FBC #22166
ENGINEERING L L C Engineer: Levi Voigt
Project: Free Up Storage
Building L
Date:2/19/2024
Wall Line E
ShearWall
Length
Wall #
L (ft)
H (ft)
A/R
1
15
11.000
0.73
2
25
11.000
0.44
3
30
11.000
0.37
4
0.00
5
0.00
Shear Wall
wwind = 117.11
Of
Lleft = 10
ft
(length of wall to the left of SW Line)
Lright = 20
ft
(length of wall to the right of SW Line)
Ltrib = 15
ft
(Wall length tributary to SW Line)
R = wwindLtrib = 1756.61
lb
(Force on SW Line)
Lshear = 70
ft
Total Length of Shear Wall
Vwa11= 25.0944
plf
Unit Shear Force
Provide: SW-1
Wa acit min = 166 PH OK
DL On Wall
Type
p (psf)
L (ft)
% of L
w (plf)
Wall DL
5
11.000
100
55.00
Roof DL
5
10
100
50.00
DLsum =
105.00
plf
DL = 0.6DLsum =
63.00
plf
Hsw =
11.000
ft
Twa11_1 =
815.68
lb
Simpson'SB 2' Vwa11*Hwa11-0.6DL*(Lwau/2)
Provide: None
Wapacity min = 0 plf Simpson 'SB 2'
�� ��' �� Client: Forge Building Company
SJob Number: FBC #22166
ENGINEERING L L C Engineer: Levi Voigt
Project: Free Up Storage
Building L
Date:2/19/2024
Wall Line
F to i
ShearWall
Length
Wall #
L (ft)
H (ft)
A/R
1
15
11.000
0.73
2
25
11.000
0.44
3
30
11.000
0.37
4
0.00
5
0.00
Shear Wall
wwind =
117.11
Of
Lieft =
10
ft
(length of wall to the left of SW Line)
Lright =
10
ft
(length of wall to the right of SW Line)
Ltrib =
10
ft
(Wall length tributary to SW Line)
R = wwi.Atrib =
1171.07
lb
(Force on SW Line)
Lshear =
70
ft
Total Length of Shear Wall
Vwall=
16.7296
plf
Unit Shear Force
Provide: SW-1
vca pacitV_niin = 166 PH OK
DL On Wall
Type
p (psf)
L (ft)
% of L
w (plf)
Wall DL
5
11.000
100
55.00
Roof DL
5
10
100
50.00
DLsum =
105.00
PH
DL = 0.6DLsum =
63.00
plf
Hsw =
11.000
ft
Twa1_1=
386.287
lb
Simpson'SB 2' Vwan*Hwan-0.6DL*(Lwa11/2)
Provide: None
Wapacity min = 0 plf Simpson'SB 2'
�� ��' �� Client: Forge Building Company
Job Number: FBC #22166
ENGINEERING L L C Engineer: Levi Voigt
Project: Free Up Storage
Building L
Date:2/19/2024
Wall Line
ShearWall
Length
Wall #
L (ft)
H (ft)
A/R
1
15
11.000
0.73
2
25
11.000
0.44
3
30
11.000
0.37
4
0.00
5
0.00
Shear Wall
wwind =
117.11
Of
Lieft =
20
ft
(length of wall to the left of SW Line)
Lright =
10
ft
(length of wall to the right of SW Line)
Ltrib =
15
ft
(Wall length tributary to SW Line)
R = wwindLtrib =
1756.61
lb
(Force on SW Line)
Lshear =
70
ft
Total Length of Shear Wall
Vwa11=
25.0944
plf
Unit Shear Force
Provide: SW-1
Vca aci min = 166 Plf OK
DL On Wall
Type
p (psf)
L (ft)
% of L
w (plf)
Wall DL
5
11.000
100
55.00
Roof DL
5
10
100
50.00
DLsum =
105.00
plf
DL = 0.6DLsum =
63.00
plf
Hsw =
11.000
ft
Twa1i_1 =
815.68
lb
Simpson'SB 2' VWall*Hwall-0.6DL*(Lwall/2)
Provide: None
Vcapacity min = 0 plf Simpson'SB 2'
�� ��' �� Client: Forge Building Company
SJob Number: FBC #22166
ENGINEERING L L C Engineer: Levi Voigt
Project: Free Up Storage
Building L
Date:2/19/2024
Wall Line N
ShearWall
Length
Wall #
L (ft)
H (ft)
A/R
1
15
11.000
0.73
2
25
11.000
0.44
3
30
11.000
0.37
4
0.00
5
0.00
Shear Wall
wwind = 117.11
plf
L1eft = 10
ft
(length of wall to the left of SW Line)
Lright = 20
ft
(length of wall to the right of SW Line)
Ltrib = 15
ft
(Wall length tributary to SW Line)
R = wwindLtrib = 1756.61
lb
(Force on SW Line)
Lshear = 70
ft
Total Length of Shear Wall
Vwa11= 25.0944
plf
Unit Shear Force
Provide: SW-1
vca acit min = 166 PH OK
DL On Wall
Type
p (psf)
L (ft)
% of L
w ( lf)
Wall DL
5
11.000
100
55.00
Roof DL
5
10
100
50.00
DLsnm =
105.00
plf
DL = 0.6DLsum =
63.00
PH
Hsw =
11.000
ft
Twaii-1 =
815.68
lb
Simpson 'SB 2' Vwa11*Hwa11-0.6DL*(Lwa11/2)
Provide: None
Vcapacity min = 0 PH Simpson 'SB 2'
�� ��' �� Client: Forge Building Company Project: Free Up Storage
SJob Number: FBC #22166 Building L
ENGINEERING L L C Engineer: Levi Voigt Date: 2/19/2024
Wall Line P to 0
ShearWall
Length
Wall #
L (ft)
H (ft)
A/R
1
15
11.000
0.73
2
25
11.000
0.44
3
30
11.000
0.37
4
0.00
5
0.00
Shear Wall
wwind =
117.11
plf
Lleft =
10
ft
(length of wall to the left of SW Line)
Lright =
10
ft
(length of wall to the right of SW Line)
Ltrib =
10
ft
(Wall length tributary to SW Line)
R = wwindLtrib =
1171.07
lb
(Force on SW Line)
Lshear =
70
ft
Total Length of Shear Wall
Vwall=
16.7296
plf
Unit Shear Force
Provide: SW-1
Wa acit _min = 166 Plf OK
DL On Wall
Type
p (psf)
L (ft)
% of L
w (plf)
Wall DL
5
11.000
100
55.00
Roof DL
5
10
100
50.00
DLsum =
105.00
plf
DL = 0.6DLs,. =
63.00
PH
Hsw =
11.000
ft
Twall_1 =
386.287
lb
Simpson'SB 2' VwaI1*Hwa11-0.6DL*(Lwa11/2)
Provide: None
Vcapacity min = 0 plf Simpson 'SB 2'
S w.rR3cu Client: Forge Building Company
Job Number: FBC #22166
ENGINEERING L L C Engineer: Levi Voigt
Project: Free Up Storage
Building L
Date:2/19/2024
Wall Line R
ShearWall
Length
Wall #
L (ft)
H (ft)
A/R
1
15
11.000
0.73
2
25
11.000
0.44
3
30
11.000
0.37
4
j 0.00
5
1 0.00
Shear Wall
wwind =
117.11
Of
L1eft =
20
ft
(length of wall to the left of SW Line)
Lright =
10
ft
(length of wall to the right of SW Line)
Ltrib =
15
ft
(Wall length tributary to SW Line)
R = wwindLtrib =
1756.61
lb
(Force on SW Line)
Lshear =
70
ft
Total Length of Shear Wall
Vwa11=
25.0944
plf
Unit Shear Force
Provide: SW-1
Vca acit min = 166 PIf OK
DL On Wall
Type
p (psf)
L (ft)
% of L
w (plf)
Wall DL
5
11.000
100
55.00
Roof DL
5
10
100
50.00
DL,,,. =
105.00
plf
DL = 0.6DLsum =
63.00
plf
Hsw =
11.000
ft
Twa11_1 =
815.68
lb
Simpson'SB 2' Vwali*Hwail-0.6DL*(Lwall/2)
Provide: None
Wapacity min = 0 plf Simpson 'SB 2'
�� ��' �� Client: Forge Building Company
Job Number: FBC #22166
ENGINEERING L L C Engineer: Levi Voigt
Project: Free Up Storage
Building L
Date:2/19/2024
Wall Line U
ShearWall
Length
Wall #
L (ft)
H (ft)
A/R
1
15
11.000
0.73
2
25
11.000
0.44
3
30
11.000
0.37
4
0.00
5
0.00
Shear Wall
wwind =
117.11
Of
L1eft =
10
ft
(length of wall to the left of SW Line)
Lright =
20
ft
(length of wall to the right of SW Line)
Ltrib =
15
ft
(Wall length tributary to SW Line)
R = wwindLtrib =
1756.61
lb
(Force on SW Line)
Lshear =
70
ft
Total Length of Shear Wall
V,,a11=
25.0944
plf
Unit Shear Force
Provide: SW-1
uca acit min = 166 pif OK
DL On Wall
Type
p (psf)
L (ft)
% of L
w (plf)
Wall DL
5
11.000
100
55.00
Roof DL
5
10
100
50.00
DLsum =
105.00
plf
DL = 0.6DLsum =
63.00
plf
Hsw =
11.000
ft
Twa11_1 =
815.68
lb
Simpson'SB 2' Vwa11*Hwa11-0.6DL*(Lwa11/2)
Provide: None
Vcapacity_min = 0 plf Simpson 'SB 2'
wr Ru 3c Client: Forge Building Company
Job Number: FBC #22166
ENGINEERING L L C Engineer: Levi Voigt
Project: Free Up Storage
Building L
Date:2/19/2024
Wall Line R
ShearWall
Length
Wall #
L (ft)
H (ft)
A/R
1
140
11.000
0.08
2
0.00
3
0.00
4
0.00
5
0.00
Shear Wall
wwind =
117.11
plf
Liert =
20
ft
(length of wall to the left of SW Line)
Lright =
10
ft
(length of wall to the right of SW Line)
Ltrib =
15
ft
(Wall length tributary to SW Line)
R = wwindLtrib =
1756.61
lb
(Force on SW Line)
Lshear =
140
ft
Total Length of Shear Wall
Vwaii=
12.5472
plf
Unit Shear Force
Provide: SW-1
Vca acit min = 166 PH OK
DL On Wall
Type
p (psf)
L (ft)
% of L
w (plf)
Wall DL
5
11.000
100
55.00
Roof DL
5
10
100
50.00
DLsuin =
105.00
Of
DL = 0.6DLsum =
63.00
plf
Hsw =
11.000
ft
Twall_1 =
-4272
lb
No Uplift, OK Vwaii*HwaII-0.6DL*(Lwaii/2)
Provide: None
Vcapacity min = 0 plt OK
S orR.3cu Client: Forge Building Company
Job Number: FBC #22166
ENGINEERING L L C Engineer: Levi Voigt
Project: Free Up Storage
Building L
Date:2/19/2024
Wall Line X
ShearWall
Length
Wall #
L (ft)
H (ft]
A/R
1
30
16.000
0.53
2
0.00
3
0.00
4
0.00
5
0.00
Shear Wall
wwind = 117.11
Of
Lieft = 0
ft
(length of wall to the left of SW Line)
Lright = 20
ft
(length of wall to the right of SW Line)
Ltrib = 10
ft
(Wall length tributary to SW Line)
R = wwindLtrib = 1171.07
lb
(Force on SW Line)
Lshear = 30
ft
Total Length of Shear Wall
Vwa11= 39.0358
plf
Unit Shear Force
Provide: SW-1
Vca pacit min = 166 pif OK
DL On Wall
Type
p (psf)
L (ft)
% of L
w (plf)
Wall DL
5
16.000
100
80.00
Roof DL
5
5
100
25.00
DL,,,. =
105.00
PH
DL = 0.6DLsum =
63.00
plf
Hsw =
16.000
ft
Twaii_1 =
-320.43
lb
No Uplift, OK Vwa1i*Hwa11-0.6DL*(Lwa11/2)
Provide: None
Vcapacity min = 0 [ if OK
Ru3c
Client: Forge Building Company
Job Number: FBC #22166
ENGINEERING L L C Engineer: Levi Voigt
Project: Free Up Storage
Building L
Date:2/19/2024
Shear Wall Design - E/W Direction
Wall Line 1
ShearWall
Length
Wall #
L (ft)
H (ft)
A/R
1
155
10.000
0.06
2
20
10.000
0.50
3
0
0.000
0.00
4
0
0.000
0.00
5
0
0.000
0.00
Shear Wall
wwind right =
150.57
plf
wwind left =
150.57
plf
L1eft =
0
ft
(length of wall to the left of SW Line)
Lright =
20
ft
(length of wall to the right of SW Line)
Ltrib =
10
ft
(Wall length tributary to SW Line)
R = wwindLtrib =
1505.67
lb
(Force on SW Line)
Lshear =
175
ft
Total Length of Shear Wall
Vwa11=
8.6038
plf
Unit Shear Force
Provide: SW-2
Wa acit min = 208 Plf OK
DL On Wall
Type
p (psf)
L (ft)
% of L
w (plf)
Wall DL
5
10.000
100
50.00
Roof DL
5
2.5
100
12.50
DLsum =
62.50
plf
DL = 0.6DLsum =
37.50
plf
Hsw =
10.000
ft
Twa11_i =
-288.96
lb
No Uplift, OK VwaH*Hwa11-0.6DL*(Lwa11/2)
Provide: None
ucapacity min = 0 1)1f OK
RLDC
Client: Forge Building Company
Job Number: FBC #22166
ENGINEERING L L C Engineer: Levi Voigt
Project: Free Up Storage
Building L
Date:2/19/2024
Wall Line 5
ShearWall
Length
Wall #
L (ft)
H (ft)
A/R
1
65
10.000
0.15
2
50
10.000
0.20
3
35
0.000
0.00
4
0
0.000
0.00
5
0
0.000
0.00
Shear Wall
wwind_right =
150.57
plf
wwind left =
150.57
Of
Llert =
20
ft
(length of wall to the left of SW Line)
Light =
25
ft
(length of wall to the right of SW Line)
Ltrib =
22.5
ft
(Wall length tributary to SW Line)
R = wwindLtrib =
3387.75
lb
(Force on SW Line)
Lshear =
150
ft
Total Length of Shear Wall
Vwaii=
22.585
plf
Unit Shear Force
Provide: SW-1
Wa acit min = 166 pif OK
DL On Wall
Type
p (psf)
L (ft)
% of L
w (plf)
Wall DL
5
10.000
100
50.00
Roof DL
5
5
100
25.00
DLsucn =
75.00
plf
DL = 0.6DLsum =
45.00
plf
Hsw =
10.000
ft
Twail_i =
-561.65
lb
No Uplift, OK Vwa11*Hwa11-0.6DL*(Lwaii/2)
Provide: None
Wapacity min = 0 pll OK
mr RL' 3C Client: Forge Building Company
Job Number: FBC #22166
ENGINEERING L L C Engineer: Levi Voigt
Project: Free Up Storage
Building L
Date:2/19/2024
Wall Line 10
ShearWall
Length
Wall #
L (ft)
H (ft)
A/R
1
65
10.500
0.16
2
50
10.500
0.21
3
0
0.000
0.00
P4
0
0.000
0.00
5
0
0.000
0.00
Shear Wall
wwind right =
150.57
plf
wwind_left =
150.57
plf
Lleft =
25
ft
(length of wall to the left of SW Line)
Lright =
35
ft
(length of wall to the right of SW Line)
Ltrib =
30
ft
(Wall length tributary to SW Line)
R = wwindLtrib =
6399.08
lb
(Force on SW Line)
Lshear =
115
ft
Total Length of Shear Wall
Vrai1=
55.6442
plf
Unit Shear Force
Provide: SW-1
Vca aci min = 166 PH OK
DL On Wall
Type
p (psf)
L (ft)
% of L
w (plf)
Wall DL
5
10.500
100
52.50
Roof DL
5
5
100
25.00
DLsuin =
77.50
plf
DL = 0.6DLsum =
46.50
plf
Hsw =
10.500
ft
Twaii_i =
-578.24
lb
No Uplift, OK Vwali*Hwa11-0.6DL*(Lwa11/2)
Provide: None
Wapacity_min = 0 plf OK
wr Ru iic Client: Forge Building Company
Job Number: FBC #22166
ENGINEERING L L C Engineer: Levi Voigt
Project: Free Up Storage
Building L
Date:2/19/2024
Wall Line 11
ShearWall
Length
Wall #
L (ft)
H (ft)
A/R
1
20
11.000
0.55
2
0.00
3
0.00
4
0.00
5
0.00
Shear Wall
wwind_right =
150.57
plf
wwind_iett =
150.57
plf
Lien =
5
ft
(length of wall to the left of SW Line)
Lright =
10
ft
(length of wall to the right of SW Line)
Ltrib =
7.5
ft
(Wall length tributary to SW Line)
R = wwindLtrib =
1505.67
lb
(Force on SW Line)
Lshear =
20
ft
Total Length of Shear Wall
Vwaii=
75.2833
plf
Unit Shear Force
Provide: SW-1
vca acit min = 166 PIf OK
DL On Wall
Type
p (psf)
L (ft)
% of L
w (plf)
Wall DL
5
11.000
100
55.00
Roof DL
5
5
100
25.00
DLsum =
80.00
plf
DL = 0.6DLsum =
48.00
plf
Hsw =
11.000
ft
Twaii_1=
348.116
lb
Simpson 'SB 2' Vwaii*Hwaii-0.6DL*(Lwaii/2)
Provide: None
Wapacity min = 0 plf Simpson'SB 2'
�� ��' �� Client: Forge Building Company
SJob Number: FBC #22166
ENGINEERING L L C Engineer: Levi Voigt
Project: Free Up Storage
Building L
Date:2/19/2024
Wall Line 13
ShearWall
Length
Wall #
L (ft)
H (ft)
A/R
1
20
11.000
0.55
2
0.00
3
0.00
4
0.00
5
0.00
Shear Wall
wwind_right =
150.57
PH
wwiad_teft =
150.57
plf
Lieft =
10
ft
(length of wall to the left of SW Line)
Lright =
10
ft
(length of wall to the right of SW Line)
Ltrib =
10
ft
(Wall length tributary to SW Line)
R = wwindLtrib =
2258.5
lb
(Force on SW Line)
Lshear =
20
ft
Total Length of Shear Wall
Vwati=
112.925
Of
Unit Shear Force
Provide: SW-1
Vca act min = 166 PH OK
DL On Wall
Type
p ( sf)
L (ft)
% of L
w (plf)
Wall DL
5
11.000
100
55.00
Roof DL
5
5
100
25.00
DLsum =
80.00
plf
DL = 0.6DLsum =
48.00
plf
Hsw =
11.000
ft
Twatt_1 =
762.174
lb
Simpson'SB 2' Vwait*Hwa11-0.6DL*(Lwa11/2)
Provide: None
Wapacity_min = 0 PH Simpson 'SB 2'
mr Ru 3c Client: Forge Building Company
Job Number: FBC #22166
ENGINEERING L L C Engineer: Levi Voigt
Project: Free Up Storage
Building L
Date:2/19/2024
Wall Line 15
ShearWall
Length
Wall #
L (ft)
H (ft)
A/R
1
20
11.000
0.55
2
0.00
3
0.00
4
0.00
5
0.00
Shear Wall
wwind_right =
150.57
plf
wwind_ieft =
150.57
plf
Lieft =
10
ft
(length of wall to the left of SW Line)
Lright =
10
ft
(length of wall to the right of SW Line)
Ltrib =
10
ft
(Wall length tributary to SW Line)
R = wwindLtrib =
2258.5
lb
(Force on SW Line)
Lshear =
20
ft
Total Length of Shear Wall
Vwaii=
112.925
plf
Unit Shear Force
Provide: SW-1
Wa acit min = 166 PH OK
DL On Wall
Type
p (psf)
L (ft)
% of L
w (plf)
Wall DL
5
11.000
100
55.00
Roof DL
5
5
100
25.00
DLsam =
80.00
PH
DL = 0.6DLsum =
48.00
PH
Hsw =
11.000
ft
Twai>_1=
762.174
lb
Simpson 'SB 2' Vwa11*Hwa11-0.6DL*(Lwa11/2)
Provide: None
ycapacity min = 0 plf Simpson 'SB 2'
� � � �' � � Client: Forge Building Company Project: Free Up Storage
Job Number: FBC #22166 Building L
ENGINEERING L L C Engineer: Levi Voigt Date: 2/19/2024
Wall Line
17
ShearWall
Length
Wall #
L (ft)
H (ft)
A/R
1
15
11.000
0.73
2
35
11.000
0.31
3
0.00
4
0.00
5
0.00
Shear Wall
wwind_right =
150.57
plf
wwind_lett =
150.57
plf
L1eft =
10
ft
(length of wall to the left of SW Line)
Lright =
10
ft
(length of wall to the right of SW Line)
Ltrib =
10
ft
(Wall length tributary to SW Line)
R = wwindLtrib =
2258.5
lb
(Force on SW Line)
Lsbear =
50
ft
Total Length of Shear Wall
Vwa11=
45.17
plf
Unit Shear Force
Provide: SW-1
vca acit min = 166 pif OK
DL On Wall
Type
p (psf)
L (ft)
% of L
w (plf)
Wall DL
5
11.000
100
55.00
Roof DL
5
5
100
25.00
DLsum =
80.00
plf
DL = 0.6DLsum =
48.00
PH
Hsw =
11.000
ft
Twa11-1 =
136.87
lb
Simpson'SB 2' Vwa11*Hwa11-0.6DL*(Lwa11/2)
Provide: None
Vcapacitv min = 0 pif Simpson'SB 2'
mr RL' 3C Client: Forge Building Company Project: Free Up Storage
Job Number: FBC #22166 Building L
ENGINEERING L L C Engineer: Levi Voigt Date: 2/19/2024
Wall Line
We',
ShearWall
Length
Wall #
L (ft)
H (ft)
A/R
1
20
11.000
0.55
2
0.00
3
0.00
4
0.00
5
0.00
Shear Wall
wwind right =
150.57
plf
wwind left =
150.57
Of
Lieft =
10
ft
(length of wall to the left of SW Line)
Lright =
10
ft
(length of wall to the right of SW Line)
Ltrib =
10
ft
(Wall length tributary to SW Line)
R = wwindLtrib =
2258.5
lb
(Force on SW Line)
Lshear =
20
ft
Total Length of Shear Wall
Vwaii=
112.925
Of
Unit Shear Force
Provide: SW-1
Vca acit min = 166 PH OK
DL On Wall
Type
p (psf)
L (ft)
% of L
w 010
Wall DL
5
11.000
100
55.00
Roof DL
5
5
100
25.00
DLsuin =
80.00
plf
DL = 0.6DLsum =
48.00
plf
Hsw =
11.000
ft
Twaii_1=
762.174
lb
Simpson 'SB 2' Vwau*Hwa11-0.6DL*(Lwaii/2)
Provide: None
Wapacity min = '0 plf Simpson'SB 2'
O r R L' 3 C Client: Forge Building Company Project: Free Up Storage
Job Number: FBC #22166 Building L
E N G i f� E E R I N G L L C Engineer: Levi Voigt Date: 2/19/2024
Wall Line
21
ShearWall
Length
Wall #
L (ft)
H (ft)
A/R
1
20
15.000
0.75
2
0
0.000
0.00
3
0
0.000
0.00
4
0
0.000
0.00
5
0
0.000
0.00
Shear Wall
wwind right =
150.57
plf
wwind_ieft =
150.57
plf
Lieft =
10
ft
(length of wall to the left of SW Line)
Lright =
10
ft
(length of wall to the right of SW Line)
Ltrib =
10
ft
(Wall length tributary to SW Line)
R = wwindLtrib =
2258.5
lb
(Force on SW Line)
Lshear =
20
ft
Total Length of Shear Wall
Vwaii=
112.925
plf
Unit Shear Force
Provide: SW-1
Vca acit min = 166 PH OK
DL On Wall
Type
p (psf)
L (ft)
% of L
w (plf)
Wall DL
5
15.000
100
75.00
Roof DL
5
5
100
25.00
DLsum =
100.00
plf
DL = 0.6DLsum =
60.00
plf
Hsw =
15.000
ft
Twaii_1 =
1093.87
lb
Simpson 'SB 2' Vwaii*Hwaii-0.6DL*(Lwali/2)
Provide: None
Vcapacity_min = 0 pIf Simpson 'SB 2'
L13C
Client: Forge Building Company Project: Free Up Storage
Job Number: FBC #22166 Building L
ENGINEERING L L C Engineer: Levi Voigt Date: 2/19/2024
Wall Line
23
ShearWall
Length
Wall #
L (ft)
H (ft)
A/R
1
70
16.000
0.23
2
0
0.000
0.00
3
0
0.000
0.00
4
0
0.000
0.00
5
0
0.000
0.00
Shear Wall
wwind right =
150.57
plf
wwind-left =
150.57
Of
Lieft =
10
ft
(length of wall to the left of SW Line)
Lright =
30
ft
(length of wall to the right of SW Line)
Ltrib =
35
ft
(Wall length tributary to SW Line)
R = wwinaLtrib =
3764.16
lb
(Force on SW Line)
Lshear =
70
ft
Total Length of Shear Wall
Vwali=
53.7738
plf
Unit Shear Force
Provide: SW-1
Wa acit min = 166 PH OK
DL On Wall
Type
p (psf)
L (ft)
% of L
w (plf)
Wall DL
5
16.000
100
80.00
Roof DL
5
5
100
25.00
DLsum =
105.00
plf
DL = 0.6DLsum =
63.00
plf
Hsw =
16.000
ft
Twaii_i =
-1344.6
lb
No Uplift, OK Vwa11*Hwaii-0.6DL*(Lwaii/2)
Provide: None
Wapacity_min = 0 l)ll OK
r
U)
M
-I
W
Of U)
CL
o
LLI
ItJW
U
00-0 .V
N
�Q ca.
U) LL
��
-- woo
O
w00
00,
N
NOf
�
W
LO
w
w
U)
Rg
LUO
10
c
c
N U I
N -
N ; I,
!U)
I�
o,z L
„o-Iz L
I
,o-.o L
I
I
110-10
I
J
CoM
1
`�
M
1�
^
J
119
J
U
CL
U
w
-
10—I
Q—C—
m a
1J
o
I
1
�
_
I
I
O
I
CV
o
I
I I v
I
ti i>3
I
I� • = I �
I
� �
I
x�
I'
0
CC)
I
I !
I
Co
� o
Q ry
W
o
'
U
0
o
L
�
I•=
I
J
I
CV
U
-
- -
- -
- -
— -
-
O
Q.
a
_1
LO
h -
—I� -_
-
-- I
—_ L
—
I
i
-1
m
o
U ~
C-
D
in
CL
r
ICL=-
- -
-
I'
0
I
1
110 1
II
LO
U)
11O 11'
0