Loading...
HomeMy WebLinkAboutSpartan Tank Transmittal LetterISCM SPARTAN To: TRANSMITTAL LETTER From: Community Development Department Brad Smith Attn: John Plano, Garfield County Chief Building Official Date: Project Number 108 8`h Street, Suite 401 4/1/2026 2SO08 _ Glenwood Springs, CO 81601 Project Name/Address: FreeUp Storage Silt CO Water Tank 357 S 161" St. Silt, CO 81652 Re: Garfield County Community Development Department-FreeUp Storage Silt CO Building Permit Review The following items have been sent via: Standard Postal Mail Overnight Delivery Client Pickup At Office X UPS Overnight I Courier Service Other (Drop Off) Item 1. Copies 2 Date 4/1/2026 Drawing/Document # 7. Freeup Silt_PH Structural Permit_02-28- 2026 Description FreeUp Storage Fire Pump House Structural Plans (24"x36" two copies) 2. 2 4/1/2026 8.a FreeUp Silt Tank -PH MP-3-12-2026 FreeUp Storage Fire Pump House Micropile Plans (24"x36" two copies) 3. 4. 5. 6. 7. 8. 9. 10. 11. These are transmitted as checked below: X For Approval For Review and Comment Approved as Submitted Approved as Noted Resubmit Copies for Approval Submit (_) Copies for Distribution As Requested Returned for Corrections Return (_) Corrected Prints For Your Use Notes/Comments: Please review and approve the attached documents in order to receive building permit approval. Let me know if you have any questions or comments. Sincerely, Brad Smith I Real Estate Development Manager Spartan Investment Group, LLC 117301 W. Colfax Ave. Suite 120, Golden, CO 80401 C:303.883.7586 1 hsmith soarlan-investors.com Spartan-Investors.com I Invest in Our Volues A Veterannr Owned Business S PA RTA N INVES"IMEN1 GROUP CONDITIONS OF PERMIT BLCO-01-26-9642 FREEUP STORAGE SILT LLC WATER TANK AND PUMPHOUSE TO SUPPLY HYDRANTS, FIRE SPRINKLER, AND RESTROOM 357 S. 16T" STREET, SILT 1) THE APPROVED PLANS ARE TO BE ON -SITE FOR INSPECTIONS. 2) SANITARY FACILITIES ARE REQUIRED TO BE PROVIDED FOR WORKERS. 3) A LIST OF REQUIRED INSPECTIONS WILL BE ATTACHED TO THE PLANS. THE STATE IS TO PERMIT AND APPROVE THE ELECTRICAL WORK. HTTPS://WWW.COLORADO.GOV/PACIFIC/DORA/DPO ELECTRICAL PLUMBING PE RMITS 4) UNDERGROUND UTILITY LOCATES IS THE RESPONSIBILITY OF THE OWNER OR CONTRACTOR. 811 IS THE COLORADO UTILITY LOCATE HOT LINE. 5) GEOTECHNICAL ENGINEER IS TO OBSERVE THE MICROPILE INSTALLATION AND PROVIDE A STAMPED LETTER THATTHE PILES ARE INSTALLED PER SPECIFICATIONS. 6) DRAINAGE ACROSS PROPERTY LINES SHALL NOT EXCEED THAT WHICH EXISTED PRIOR TO GRADING. EXCESS OR CONCENTRATED DRAINAGE SHALL BE CONTAINED ON SITE OR DIRECTED TO AN APPROVED DRAINAGE FACILITY. EROSION OF THE GROUND IN THE AREA OF DISCHARGE SHALL BE PREVENTED BY INSTALLATION OF NON -EROSIVE DOWN DRAINS OR OTHER DEVICES. 7) ALL BACKFLOW PREVENTERS ARE REQUIRED TO BE TESTED AND CERTIFIED BY A LICENSED BACKFLOW SPECIALIST AFTER INSTALLATION AND PRIOR TO ISSUANCE OF THE CERTIFICATE OF OCCUPANCY. 8) ELECTRICAL CODE COMPLIANCE WILL BE DETERMINED BASED ON FIELD INSPECTIONS PERFORMED BY THE STATE ELECTRICAL INSPECTOR, (303) 869-3458. PLEASE HAVE THE INSPECTOR SIGN THE BUILDING CARD OR PROVIDE WRITTEN DOCUMENTATION OF THE INSPECTIONS. 9) ANY WATER SUPPLY THAT FEEDS AFIRE SUPPRESSION SYSTEM IS TO BE INSPECTED BY THE FIRE MARSHAL FOR THAT FIRE DISTRICT PRIOR TO BACKFILLING. 10) PLEASE PROVIDE SPECIAL INSPECTIONS REPORTS TO THE BUILDING DEPARTMENT, WELDING AND BOLTING IS MINIMUM. 11)COMBUSTIBLE MATERIAL IS LIMITED IN TYPE I AND TYPE II CONSTRUCTION. SEE IBC 603 FOR ALLOWED COMBUSTIBLE MATERIALS. 12)ALL EXTERIOR LIGHTING IS TO BE DOWNCAST AND SHIELDED. 13)ALL ACCESSIBLE DOOR HARDWARE SHALL HAVE A SHAPE THAT IS EASY TO GRIP, INCLUDING POCKET AND SLIDING DOORS. (ANSI Al 17.1 - 404.2.6) 14) UFER GROUNDS ARE REQUIRED TO BE INSPECTED AT FOOTING INSPECTION 15)ANY EXPOSED FOAM IS TO BE COVERED WITH AN IGNITION BARRIER OR A THERMAL BARRIER BASED ON LOCATION. (IRC R316) 16) CONTROL NOXIOUS WEEDS. TREAT EXISTING WEEDS PRIOR TO RELOCATING PLANTS AND SEEDS. 17) REVEGITATE ALL DISTURBED AREAS THAT ARE NOT PART OF A ROAD OR NON - SEEDED AREA. 18) PROVIDE EROSION CONTROLS UNTIL SEEDED AREAS CAN BE ESTABLISHED. 19) PROVIDE DUST CONTROL AS REQUIRED DURING CONSTRUCTION. 20) FOLLOW ENGINEERED PLANS. VERIFY ANY CHANGES WITH THE ENGINEER. 21) PROVIDE MEANS TO KEEP THE TANK AND PIPING FROM FREEZING. PUMPHOUSE CONDITIONS 22)ANY PLUMBING IS TO BE INSPECTED AND APPROVED BY THE FIRE DISTRICT. 23)THE PUMPHOUSE STRUCTURAL DRAWINGS ARE TO BE A DEFERRED SUBMITTAL, NO INSPECTIONS ARE TO BE PERFORMED ON THE PUMPHOUSE UNTIL APPROVED. 24)ANY REQUIREMENTS FROM THE FIRE DISTRICT BECOMES REQUIRED CONDITIONS OF THE PERMIT. 25)THE PUMP HOUSE IS THE BE PROTECTED WITH FIRE SPRINKLERS 26)THE EXTERIOR WALLS ARE TO BE ONE -HOUR FIRE RESISTIVE, SEE THE 81h X 11. 27) INSULATION IS NOT SHOWN ON THE PLANS, FIELD VERIFY THAT THE THERMAL ENVELOPE MEETS MINIMUM CRITERIA. 28) ELECTRICAL CODE COMPLIANCE WILL BE DETERMINED BASED ON FIELD INSPECTIONS PERFORMED BY THE STATE ELECTRICAL INSPECTOR, (303) 869-3458. PLEASE HAVE THE INSPECTOR SIGN THE BUILDING CARD OR PROVIDE WRITTEN DOCUMENTATION OF THE INSPECTIONS. AS 1r- -I E R7__ � - ARCHITECTS =INGINEERS Date: 4/22/2026 To: Garfield County Community Development Department From: Asher Architects+Engineers RE: FreeUp Self Storage Silt Pump House Dear Garfield County Community Development Department: It is now proposed to provide a fire sprinkler system within the pump house structure at the Free Up Storage facility along with a 1 hour rated wall system to comply with NFPA 20 Requirements. Per prescriptive code requirements of IBC Chapter 7 Table 722.6.2(1) a single layer of 5/8" drywall on each side of the exterior steel stud walls will accomplish this goal. Wall Assembly: 5/8" drywall interior = 30 Minutes 2x6 steel stud = 0 Minutes 5/8" drywall exterior = 30 Minutes Metal siding exterior = 0 Minutes Total fire protection = 1 Hour Sincerely, David A. Stranathan, AIA, NCARB, LEED AP BD+C Principal Architect Remit Email: David@asherarch.com www.AsherArch.com 4.12.1.1.2* Indoor fire pump rooms in non -high-rise buildings or in separate fire pump build- ings shall be physically separated or protected by tiro -rated construction in accordance with Table 4.12.1.1.2. TABLE 4.12 1.L2 Equtpinenf Prorecti4on Building(s) Exposing Pump Pump Roont/House RoomlHouse Required Separation Not sprinklered Not sprinklered 2 hour Fire -rated Not sprinklered Fully sprinklered or Fully sprinklered Not sprinklered 50 ft (15.3 ni) Fully sprinklered Fully sprinklered I hour Fire -rated or 50 ft (15.3 nr) For the purposes of Table 4.12.1.1.2, a building with a fine protection system(s) supplied from the fire pump is considered to be a building exposing the pump room house. There may also be other buildings or hazards that expose the pump room.rhouse. A.4.12.1.1.2 The purpose for the `Not Sprinklcred" column in Tablc 4.12.1.1.2 is to pro- vide guidance for unsprinlcicrcd buildings. This does not permit sprinklers to be omittod from pump rooms in full), sprinklered buildings. 4.12.1.1.3 The location of and access to the fire pump room shall be preplanned with the fire department. 4.12.1.1.4* Except as permitted in 4.12.1.1.5, rooms containing fire pumps shall be tire from stor- age., equipment and penetrations not essential to the operation of the pump and related components. it is the Intent of the standard to prohibit the use of a fire pump room for the purposes of storage. It is not the intent of the standard to prohibit the installation of other types of equip- ment such as domestic water distribution equipment as indicated in 4.12.1.1.5. No materials or equipment that add to the combustibility of the space should be placed in the fire pump room. This provision Is intended to provide protection to equipment as well as operating personnel, A.4.12.1.1.4 Equipment that increases the fire hazard (such as boilers) and is not related to fire protection systems should not be in a fire pump room_