BUILDING PEcM:;1I T £�
APPLICATICIN
INVOLVED PARTIES
_ — ---
Property Owner: Aspen Valley Land Trust
Phone: (970 )948-1240
Mailing Address: 320 Main Street Suite 204
Email Address: torrey@avlt.org
Contractor: RAM Development Inc.
Phone: (970 1987-1569
Mailing Address: 156 12th St. Carbondale CO, 81623
Email Address: bobby@ramdev.build
Architect: CCY ARCHITECTS, LTD
Phone: (970 )927-4925
Mailing Address: 228 MIDLAND AVENUEP.O. BOX 529
Email Address: msmlth@ccyarchltects.com
Engineer: KL&A ENGINEERING & BUILDERS
Phone: (970 )927-5174
Mailing Address: 215 NORTH 12TH ST, UNIT ECARBONDALE, CO 81623
Email Address: bmalone@klaa.com
Manufactured Home Installer:
Phone: ( )
Mailing Address:
Email Address:
PROJECT DETAILS
- - -
ITwo new buildings. A Learning lab for the ranch and a catering
i Describe Work. g -
kitchen to support events and staff.
Job Address: 1837 CO RD 100, CARBONDALE, CO
81623 _
Assessor's Parcel Number: 239336321001
Sub. Doug Coffman Subdivision Lot 1 Block
Owner's Valuation of Work: $1 ,300,000 Property Size (Sq. Ft. or Acres): 141 acres
Sq. Ft. of Building: 2,828 combined Height: 1 7'-3°
# of Floors:1 and 1
Class of Work: New Remodel/Alteration
Addition
I
Garage: nAttached
Detached
PROJECT DETAILS CONTINUED
Septic:
Community
Type of Heat: []Natural Gas I❑ Propane A Electric I❑ Other
Driveway ❑Exempt a Permit #:
Permit: - — - — - — - --- - -- —
NOTICE
Authority. This application for a Building Permit must be signed by the Owner of the property, described above,
or an authorized agent. If the signature below is not that of the Owner, a separate letter of authority, signed by
the Owner, must be provided with this Application.
Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for
purposes of inspections by the Building Division.
Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit,
(3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access
or a State Wastewater Discharge Permit.
Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days
of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement.
CERTIFICATION —•- — - - - - - — --- -- - -- —
I hereby certify that I have read this Application and that the information contained above is true and correct. I
understand that the Building Division accepts the Application, along with the plans and specifications and other data
submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming completeness
of the submittals and approval of this Application, a Building Permit will be issued granting permission to me, as
Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the Building Division. In
consideration of the issuance of the Building Permit, I agree that I and my agents will comply with provisions of any
federal, state or local law regulating the work and the Garfield County Building Code, OWTS regulations and
applicable land use regulations (County Regulation(s)). All County development requiring a permit, except for
residential uses are subject to Article 7 of the Land Use and Development Code. I acknowledge that the Building
Permit may be suspended or revoked, upon notice from the County, if the location, construction or use of the
structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other
applicable law.
I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I
further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1) requiring
the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or use of the
structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law. Review of this
Application, including submittals, and inspections of the work by the Building Division do not constitute an
acceptance of responsibility or liability by the County of errors, omissions, or discrepancies. As the Owner, I
acknowledge that responsibility for compliance with federal, state and local laws and County Regulations rest with
me and my authorized agents, including without limitation my architect designer, engineer and/ or builder.
I hereby acknowledge that I have read and understand the Notice and Certification above, as well as, have
provided the required information which is correct and accurate to the best of my knowledge.
Toryoy udall 0&2S 20
Property Owner Print and Sign yDate
NL OFFICIAL USE OY.�) , n�l41
Q �„ �D LiSi��� 1 `�' `t L47_
Special Conditions:
Adjusted Valuation:
775 184-
Plan Check Fee:
2 01-1
Permit Fee:
5'.35 2
Manu. Home Fee:
Misc. Fees:
3335 . �
Total Fees:
7�i 85.1C
Fees Paid: (�`
�, "1
Balance Due:
4535. 2-5
BP o:
-q'�M
OWTS No:
Zoning:
Setbacks:
OCC Group:
Const. T pe:
BUILDING / PLANNING DIVISION:
Q -? 47
Sig d Approv�Mjl
Date
Garfield Coun�
lux 8tn Street, Suite 4u1
Glenwood Springs, CO 81601
(970)945-8212
www.garfield-county.com
Learning Lab
Applicant: Aspen Valley Land Trust Permit #
Project Address: 1837 CR 100
Subdivsion: Lot: Block:
Type of Occupancy
Type of Construction
Square Feet
Price per Sq. Ft.
E
VB
3721
$207.79
Total Valuation
$773,186,59
Breakdown of Fee Calculations:
$5608.75 for the first 1 million and $3.15 for each $1000 or fraction there of
Road Impact for Institutional is $1505 per 1000 sq. ft.
2.216 x 1505 = $3335
***All fees are estimates until final plan review is completed***