Loading...
HomeMy WebLinkAboutApplicationYarfield County Er--:- wCommunity Development Department 108 8th Street, Suite 401 3 Glenwood Springs, CO 81601 c� a Lou(970) 945-8212 L) 4'-J --A www.garfieldcountyco.gov LU �jI ~ W . WITOW. 7k, BUILDING PEcM:;1I T £� APPLICATICIN INVOLVED PARTIES _ — --- Property Owner: Aspen Valley Land Trust Phone: (970 )948-1240 Mailing Address: 320 Main Street Suite 204 Email Address: torrey@avlt.org Contractor: RAM Development Inc. Phone: (970 1987-1569 Mailing Address: 156 12th St. Carbondale CO, 81623 Email Address: bobby@ramdev.build Architect: CCY ARCHITECTS, LTD Phone: (970 )927-4925 Mailing Address: 228 MIDLAND AVENUEP.O. BOX 529 Email Address: msmlth@ccyarchltects.com Engineer: KL&A ENGINEERING & BUILDERS Phone: (970 )927-5174 Mailing Address: 215 NORTH 12TH ST, UNIT ECARBONDALE, CO 81623 Email Address: bmalone@klaa.com Manufactured Home Installer: Phone: ( ) Mailing Address: Email Address: PROJECT DETAILS - - - ITwo new buildings. A Learning lab for the ranch and a catering i Describe Work. g - kitchen to support events and staff. Job Address: 1837 CO RD 100, CARBONDALE, CO 81623 _ Assessor's Parcel Number: 239336321001 Sub. Doug Coffman Subdivision Lot 1 Block Owner's Valuation of Work: $1 ,300,000 Property Size (Sq. Ft. or Acres): 141 acres Sq. Ft. of Building: 2,828 combined Height: 1 7'-3° # of Floors:1 and 1 Class of Work: New Remodel/Alteration Addition I Garage: nAttached Detached PROJECT DETAILS CONTINUED Septic: Community Type of Heat: []Natural Gas I❑ Propane A Electric I❑ Other Driveway ❑Exempt a Permit #: Permit: - — - — - — - --- - -- — NOTICE Authority. This application for a Building Permit must be signed by the Owner of the property, described above, or an authorized agent. If the signature below is not that of the Owner, a separate letter of authority, signed by the Owner, must be provided with this Application. Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for purposes of inspections by the Building Division. Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit, (3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or a State Wastewater Discharge Permit. Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement. CERTIFICATION —•- — - - - - - — --- -- - -- — I hereby certify that I have read this Application and that the information contained above is true and correct. I understand that the Building Division accepts the Application, along with the plans and specifications and other data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming completeness of the submittals and approval of this Application, a Building Permit will be issued granting permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the Building Division. In consideration of the issuance of the Building Permit, I agree that I and my agents will comply with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, OWTS regulations and applicable land use regulations (County Regulation(s)). All County development requiring a permit, except for residential uses are subject to Article 7 of the Land Use and Development Code. I acknowledge that the Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law. I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1) requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law. Review of this Application, including submittals, and inspections of the work by the Building Division do not constitute an acceptance of responsibility or liability by the County of errors, omissions, or discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or builder. I hereby acknowledge that I have read and understand the Notice and Certification above, as well as, have provided the required information which is correct and accurate to the best of my knowledge. Toryoy udall 0&2S 20 Property Owner Print and Sign yDate NL OFFICIAL USE OY.�) , n�l41 Q �„ �D LiSi��� 1 `�' `t L47_ Special Conditions: Adjusted Valuation: 775 184- Plan Check Fee: 2 01-1 Permit Fee: 5'.35 2 Manu. Home Fee: Misc. Fees: 3335 . � Total Fees: 7�i 85.1C Fees Paid: (�` �, "1 Balance Due: 4535. 2-5 BP o: -q'�M OWTS No: Zoning: Setbacks: OCC Group: Const. T pe: BUILDING / PLANNING DIVISION: Q -? 47 Sig d Approv�Mjl Date Garfield Coun� lux 8tn Street, Suite 4u1 Glenwood Springs, CO 81601 (970)945-8212 www.garfield-county.com Learning Lab Applicant: Aspen Valley Land Trust Permit # Project Address: 1837 CR 100 Subdivsion: Lot: Block: Type of Occupancy Type of Construction Square Feet Price per Sq. Ft. E VB 3721 $207.79 Total Valuation $773,186,59 Breakdown of Fee Calculations: $5608.75 for the first 1 million and $3.15 for each $1000 or fraction there of Road Impact for Institutional is $1505 per 1000 sq. ft. 2.216 x 1505 = $3335 ***All fees are estimates until final plan review is completed***