HomeMy WebLinkAbout1530 1530
GARFIELD COUNTY BUILDING AND SANITATfON DEPARTMENT n �\
2014 Blake Avenue
{ Glenwood Springs, Colorado 81601
Phone (303) 946.8241
Job Address
.o v (ii ri1
Nature of Work buticIib.1 Permit
Use of Building. _ _ [ (;i ii1mt nt Exp. A, New Tower
�! owner -
fluu;,tain Bell
Contractor [..:Ad Andersen
•
Amount of Permit: $
l•;',II Date: September 16, 1980
Toni L. Sherwood
CLERK
Building Permit Application
Nt 1492
Garfield County, Colo. S J %or J 19 �U
• Owner: X l j_ /= X.
Contractor or Builder: 19/iNAA ) ��a / /..)l777., ,v
Location: / i // J t 0 / 7/n
Purpose for which building is to be used: `!f &'' .L
Size of Lot: � 7 /7(e /=
Distance of building from property line at:
Front Rear
Left side — _____.__ _.._._ Right side
Distance from nearest building: Number of stories: — /
Source of water supply: Number of rooms:
Type of sewage disposal: Type of foundation: _ Co /-Jc /I F
Width of Building: <- '/i ' Material in outside walls: 1' oct
Length of Building: j Exterior Finish: /2/71
Height of walls: _ —_ // // Type of roof: r >ln.r u,d
Floor space in sq. ft.: dC (-
Estimated Cost: $ — • O° "' C '"
Date construction win start: 7 b<'AY Date of completion: _ / /,o
Permit Charge: $ __. per 1st $1,000 Valuation.
per each additional $1,000 Valuation.
TOTAL $ J 2 " And I /We hereby agree to build strictly to the terms of the above description, and also to clear the
grounds adjacent street. or streets of all rubbish and debris caused by the construction of said building.
•
Respectfully, <� ree
-4
The County Commissioners hereby grant the above permit as per terms therein stated. This J(r,
•
day of S ,c _ l : — 19 ? .
Ae
Building Inspector
Clerk
- -- -- —
GARFIELD COUNTY 0....' , •
STATE OE Colorado ....._
I .
• 4 Office of Building Official
REQUEST FOR INSPECTION
i Date
—4172_2AM--g1 Permit NO _i_c 36
I Received 1 Z.:0) A.M.
P.M. . . . -
District No.
pavvners Job A_
Illik._ Locality
Contractor =4 IPA— La I, a ■ _
BUILD1 PLASTERING ELECTRICAL 'LUMBI a
roue ation 0 Wire 0 Rough Wiring.0 Po •h s0 Rough
Chimney 0 Lath 0 Finish Wiring ..0 Final ALI Final - Nli
0 Sewers 0 Water Healer— 0
I F Nji S ..... ........ 8 F
0
_ ooti n r rf 0 0 Finish._ o 0 c c:s 0
b p % o Underground 0
c
ea e
/ nsuia ion 0 READY FOR INSPECTION
A.M -
1.Mon. ti Tues. Wed. Ciro.
1 Inspection Made Ze/ cn- _g _/: 0 . 0 0 TA:
I
.
• inspector_44.4_
Wm.. aoo.t
-