HomeMy WebLinkAbout1460 iiiii
` ' �u 100
Phone No. GARFIELD COUNTY Address
945 - 8241 BUILDING DEPARTMENT 2014 Blake Aver. uy
Job Address Parachute Creek
Type Oct
Nature of Work Buildino Permit
Use of Building Core & Instrument Storage Bldg.
Owner Colony Development Operation
Contractor
Amount of Permit $ 190.50 Date July 10, 1980
Toni L. Sherwood
`t.,
Clerk
F Building Permit Application
N° 1326
Garfield County, Colo. 7/3 , 19 8 0
Owner: • • r - • •m- • .eration
Contractor or Builder: Certified contractor is being selected.
Location: _ _ Parachute Creek, Dow Property NIA SW1 T5S R 95 W
Purpose for which building is to be used: For storage of core and instruments.
Size of Lot: 50' x 150'
Distance of building from property line at:
Front 1,200' Rear 18.000'
Left side — Sz,DDIl!.._ —_ Right side 6.000'
Distance from nearest building: 100' Number of stories: _ One
Source of water supply: None Number of rooms: _ One
Type of sewage disposal: None Type of foundation: Concrete
Width of Building: _ 20' , Material in outside walls: Metal Siding
Length of Building: 60' Exterior Finish: Paint
Height of walls: 12' Type of roof: Steel sheeting
Floor space in sq. ft.: 1,200_
Estimated Cost: $ — 30,000
Date construction will start: .illy 8, 1980 Date of completion: August 20, 1980
Permit Charge: $ _/z DO per 1st $1,000 Valuation.
$ _ G F- per each additional $1,000 Valuation.
TOTAL $ _
And I /We hereby agree to build strictly to the terms of the above description, and also to clear the
grounds adjacent street or streets of all rubbish and debris caused by the construction of said building.
Respectfully, 7
The County Commissioners hereby grant the above permit as per terms therein stated. This /
day of du , 19&b.
/r
Building Inspector
Clerk
RECEIVED JUL 0 9 1980
ARCO Coal Company - Operator ' `
Colony Development Operation
555 Seventeenth Street '
Mailing Address: Box 5300
Denver, Colorado 80217
Telephone 303 575 7607
July 3, 1980
Mr. Bud Milner
Building Official
Garfield County Planning Dept.
2014 Blake Avenue
Glenwood Springs, CO 81601
Dear Mr. Milner:
Enclosed is Application No. 1326 for a core and instruments
building. The building will be built by a certified contractor
and owned by Colony Development Operation, Atlantic Richfield,
Operator. This application includes those items which, based
on Rule 9.01.01 of the Garfield County Zoning Resolution, are
required; namely:
1) a completed form as provided by your office,
2) a map giving sufficient information to locate
the lot and to show its actual area and con-
tours (Figure 1),
3) a map showing location, dimensions, and area of
existing buildings, most of which are mobile
trailers (Figure C -1), and
4) two detailed drawings of the building to be
constructed.
In addition, we have included a check for $190.50, which we
understand is the charge for a building permit for a $30,000
structure.
Sincerely,
A. N. Gordon
Enclosures
cc: T. V. Rao
J. H. Caldwell, Jr.
L. L. Ludlam
J. P. Strawn
B. G. Frenzel
ARCO Coal Company is a Division of AtienlIcRlchfeldCompany 6050 -
7 9 Q
N
g m
q O
E 0
D
r� l a
t? N o
M
,-I o
g O a E a
ON z a
y n C a
s a. O
N
U o
a
P.
E a
v o
a ID
P
C •.� o
T1 JD
a
N
P4
h' 1 0
a.
O N
.
T. m
O
•
146pt
Phone No. GARFIELD COUNTY Address
945 -8241 BUILDING DEPARTMENT 2014 Blake Ave
RECEIPT
Job Address [€.r chute Creek Type Occupancy
Nature of Work i;uildiva Prrruit.
Use of Building Gore t. instrument Stori:ne bldg.
Ow 4. +I otty ft VclomeiIt O eration
Contractor
Amount of Permit $ 191.50 Date July 10, 190
Toni L. Sherwood
Clerk
i
CO ,co
N 0
,. o
• o z`a y
° w 'a t E.:
- Z o
• 3 ' W
a
J
�
as
1
til "ii v
C1
i ;
'It v
4- 1
pQ �� 0
iii; ]
l[.
i O d
1 V - ii
i ° : _1:ikw E
• (_) ..-
7 N u
. � Z ` Q n( Q Q -`i
U ' I
4
d u
:
?
i I ONAc No61M'40 ionaotla_ ne +7_. :u [.unAo•01
a)
y
0)
01 r N
C O. v Y
L .0 E 0 4-
✓ i U
r O C Y •
0 4-) O C O
OO C O •r o 0
O C 4-
E U O
0 0 N C
C 0 0)
C u1 O) r S0
C Q) S.
S- 0) r V)
O) ea (0 d d'
L t U 0) (0
4- V i as 0
4- O) r .0 N 00
0 L C 3 0 N
^O O (n r
• 4- Y V 3 U N•
•---V U C Y O) Q
t} 0) 0) rt i O. W --
O N 0. 4- O N J
M in C C 3 C
• C 1 r 01 0) •C •
O N r i
{) C Y CI
4.) U I-( W
V 0) r 4- U F-
r 0) 0 m N.
V) 3 • v 4 W •
4 V (0 s- • 0 0 o f 4c d
( E O Ea) 4-- 4 K•••
✓ W Y 0 0) It W
V 4- i O 0. 0) CO •
- O C N 4- #
0 0 3 0) r 0) -J •
M •r S. L •C
•-) O rt) • 2
C U as • )n
O 0) C 1- C ■
r d 0 O O • N
0 C r 4- r • Z
U C i-) 4-) r 0
O) •• i • r (p - +
N O) O 0) - 0- f -
L. O. CJ I-
IV C W Ci
M Q (tl as d •
U U O = V)
L 0 C • Z
ai • • sn In Iti
0 d C C . 0
0 C O 0) > J
40 •• O) r (n It J
U 300
. V 0) N (n
O W C L N C)
41 44 0 i ro 0)
H. So •r 0
1.. 0 C0i U 0 0) •
•;
, ? W Na • O) • i
aN i ao r
e; w u -0 - 3 > •
" . d Q o L O 5--
9
r /
: .
�
p ,
December 11, 1981
oi.
1'
Mr. David Freedman
BROWN & ROOT, INC.
P.O. Box Three
Houston, TX 77001
Dear Mr. Freedman:
Confirming our telephone conversations and the floor plans
we received from you for the .Pre-Assembly Building that will
be located at the Exxon Colony project.
` The uses that you indicated would be in the building along
with office space would place the whole building in Group B,
$ Division 2. Therefore, no fire separation would be required,
except for the open storage you indicated would be in the
area under the offices.
The only thing that we have to watch for is the allowable
floor area and height of this group.
Sincerely,
W.C.Milner
Building Official
}. WCM:pt
:.
if
Brown t.J oot,Inc. Post Office Box Three, Houston, Texas 77001
aanr • ssr
November 20, 1981 �" - --
Garfield County Building Department
2014 Blake
i
Glenwood Springs, Colorado 81601
a;.
Mr. Milner,
i
` Per our conversation this morning, enclosed you will find one copy
of the ground, second and third floor plans as well as a rough
section for the Pre - Assembly Building Offices located in the Exxon
Colony Project. Also enclosed is a copy of the Pre - Assembly Build-
ing floor plan. Please note the offices are located between column
line A and B. Our interpretation of the uniform building code
places the offices under Group B- Division 2 and the Pre - Assembly
Building under Group B- Division 4, with this in mind we feel we
require a one hour area separation wall along Column lines 1, 17,
t
A & A3 according to Table 5B.
With the Pre - Assembly Building classified as Construction Type II -N,
is it necessary to fire -proof all structural elements of the office
structure?
° Please review this submission as quickly as your schedule permits and
contact me either by mail or by phone at 713 - 676 -3562.
Thank you, 1
David Freedman
DF /sas
cc: File
9 •
lit 1326 Building Permit Application
Garfield County, Colo. 7/3 , 19
Owner: ]c liev(- 1opinent Operation
Contractor or Builder: r'? f- j f 5 ed contractor is brinw selected. .4 ,. ,•e.
Location: I'Nrachute Creek, Dow Property NW'-, 8NO4 T5S R 95 a
Purpose for which building is to be used: For storase of core and instrument s.
= Size of Lot: : n' x 150'
Distance of building from property line at i
Front Rear 18,000'
Left side Right side 6.000'
Distance from nearest building: 100' Number of stories: One
Source of water supply: None Number of rooms: One
Type of sewage disposal: none Type of foundation: Concrete
Width of Building: 20' Material in outside walls: Metal Siding
Length of Building: 60 ' Exterior Finish: Paint
- Height of walls: 72 ' Type of roof: Steel sheeting
- Floor space in sq. ft.: 1.200
a Estimated Cost: $ 30,000
_ - Date construction will start: Ju 8, 1980 Date of completion: August 20, 1980
` Permit Charge: $ per 1st $1,000 Valuation.
$ per each additional $1,000 Valuation.
TOTAL $
And I /We hereby agree to build strictly to the terms of the above description, and also to clear the
grounds adjacent street or streets of all rubbish and debris caused by the construction of said building.
Respectfully, > �(
�= f
The County Commissioners hereby grant the above permit as per terms therein stated. This /t
day of , 19gf
Building Inspector
ri
Clerk
(� 1480
,. POST TRIO CARD AT OR NEAR FRONT OF BUILDING A
P «'
Phone No. GARFIELD COUNTY Address
•
945 -8241 BUILDING DEPARTMENT 2014 Blake Ave
•
INSPECTION RECORD NO 1460
Job Address Parachute Creek Type 0colc ncy
fr
Nature of Work Building Permit
Use of Building Core & Instrument Storage Bldg.
Owner Colony Development Operation
Contractor
Amount of Permit $ 190.50 Date July 10, 1980
Toni L. Sherwood
Clerk
NOTE: ALL CHECKS MUST BE MADE PAYABLE TO GARFIELD CO. CLERK & RECORDEft
• Inspector must sign all spaces pertaining to this job
INSPECTION DATE INSPECTOR
Foundations:
Setback •
Trench
Reinforcing
Foundation Wall and
Weather Proofing
Pour no concrete until above has been signed
Concrete Slab Floor
Electrical (Groundwork)
Plumbing (Groundwork)
Gas Piping (Groundwork)
Do not pour floor until above has been signed
Rough Electrical
Rough Plumbing
Rough Gas Piping
Rough Heating and Ventilation
( Above ust be signed prior to
f raming m inspection
_... Framing
Cover no work until above has been signed
Lath and Plaster (Interior i (
Lath /
Scratch Coat
Brown Coat
Finish Coat .•
Wallboard
Lath and Plaster (Exterior)
Lath
Scratch Coat
Brown Coat
Finish Coat
Miscellaneous
Roofing
t • ... Sewer
Refrigeration
,. Electrical Underground
r Final
Electrical Fixtures
Plumbing Fixtures
Gas Piping
Heating and Ventilation
Job Completed
FORM 300.2