HomeMy WebLinkAbout1400 s . :
k 0
1400
Phone No GARFIELD COUNTY Address
945 -8241 BUILDING DEPARTMENT 2014 Blake Ave
.
Job Address 3063 State Highway 325 Type Oct
Nature of Work Building Permit
Use of Building Garage
r
g
Owner fete James LeDonne
s Contractor Owner
Amount of Permit $ 24.00 Date May 15, 1980
Toni L. Sherwood
Clerk
:o._ `—
;,.'" Building Permit Application
N9 1287
i / � / arf' 151 County, Colo. , 19 .
Owner: -,�! - �/ t.°.. -_ ? /ter -air --7 -
Contractor or Builder: ,7 ; �(
.- ✓
Location: - -- l -�_ � ��_ � Purpose for which building is to be used: • - _X t-L (Lc_ -.C. -''
Size of Lot: - X67- -(..•— � 4 f / r ? - r ? f
Distance of building from property line at:
Front — 1 ) C'_1 Rear � l ?
Left side - i - t!±_' _- Right side £ ocZ/
Distance from nearest building: _ Nmmber of stories: / -
Source of water supply: , > 2.-- te Number of rooms: /
Type of sewage disposal: .. -_ ` Type of foundation: - L -rr7 . �` e% .n
Width of Building: 7-4 l' / — Material in outside walls: 1 -- ",,,,"
Length of Building: /. /,/ / Exterior Finish: .--- /
Height of walls: a Type of roof: r... �: t -
Floor space in sq. ft.: -.- J � k Cl -- 7 __
Estimated Cost: $ -- 5 C cr
Date construction will start: ` . 2 , F ., • A O, Date of completion: S 7
Permit Charge: $ per 1st $1,000 Valuation.
$___ per each additional $1,000 Valuation.
TOTAL $ - S !'
n
And I /We hereby agree to build strictly to the terms of the above description, and also to clear the
grounds adjacent street or streets of all rubbish and debris ca s d by the construction of said building,
Respectfully, _ ..>' � r�
The County Commissioners hereby grant the above permit as per terms therein stated. This / 0
•
day of_- Gt-..1/ _ -___- - , 1900. /
/ �. ✓ i ,... �
Building Inspector
• , Clerk
1
• GARFIELD ad C
STATE OF Colorado o I/
Office of Building Official
a- r REQUEST FOR INSPECTION
1 Date f• ( f�
i 5 -. 2 rn �' by Permit No. 1
�A — As.��
Received I • *L MD
1 30 District No.
3 S Address , ___c Locality
Owner'
I Nam AN—JenNse _ R.� Contractor
I PLASTERING ELECTRICAL PLUMBING HEATING
1
1 Foundation
Wire ❑ Rough Wiring .0 Rough ❑ Rough ❑
Framing ❑ Lath ❑ - Finish
tur Wiring ❑ S Final e ❑ Wate
xtures ewers ❑❑ Water Healer.. ❑
Framing ❑ Brown Fi
❑
F iml ❑ Brown ❑ MotMotors. ❑ Gas
Finish ❑ Cesspool ❑
Wallboard ❑
READY FOR INSPECTION A.M
Mon. -
Tues Wed. Thurs. �� Fri.
��
inspection e S,G��B� /0
C sa.
I nspector
Dam 300.
ELD rado COUNTY /
• STATE OF Colo 1 / / /
Office of Building Official
E a' er
REallEST FOR INSPECTION I "1'�"
e� St Permit No.
I Pate — In ' 0�.
C ht District No.
/Imo : `y S a �,
3 O 3 5; Andres Locality
Q wnar i ��- y�c/yw Contractor.
. XI°IN PLASTERING ELECTRICAL PLUMBING HEATING
Poo at on 0 Wire ❑ Rough Wiring . Rough ❑ Rough ❑
Chimney i Lath ❑ Finish Wiring Final ❑ Final ❑
F raming Scratch ❑ Fixtures ❑ Sewers ❑ Water Heater.. ❑
Final ❑ Brown ❑ Motors. ❑ Gas
aJ Finish ❑ Cesspool ❑
_O�Y /;
Wallboard ❑
M READY F • : SPECTION A.M.
Mon.
�' W ed / Thurs. Fri. P.M.
Inspection Ma• / / 6 -, /Oil C .
inspector �
YORM iOO.1 - --
GARF I ELD COUNTY
STATE OE Col ora do
i Office of Pudding Official -
,
s
• ,i FOR CEOES INSPECTION .
Date_ 4 7/4 // HE
Time 4214!"
Received_—fic /_. a District No.
‘7 / y 32S
Job Aodres 4 o al y
Owner's
_Contractor__
PLASTERING ELECTRICAL PLUMBING HEATING
Foundation D Wire 0 Plough Wiring .0 Rough 0 Rough 0
Chirnney 0 Lath 0 Finish Wiring .. 0 Final 0 Final .0
Framing 0 Scratch 0 F ixtur es CI Sewers 0 Water Heater., 0
I Final 7C Brown 0 Motors • 0 Gas 0
F inhh 0 Cesspool 0
Wa 1 I boa rd 0
I READY FOR INSPECTION A.M.
• Mon. Toes. Wed. Thurs. ...) Fri._ _P.M.
Inspection tp 1.4y/g i , / 0 5 1 -c - ?a:
; Inspector_ 1.
I I OR m 300.1_
POST THIS CARD AT OR NEAR FRONT OF BUILDING 6
if
Phone No GARFIELD COUNTY Address '.
945 - 8241 BUILDING DEPARTMENT 2014 Blake Ave
_ INS'PECTION RECORD NO 1400
Job Address :r 3063 State Highway 325 •
Type � or
Nature of Work Building Permit;
Use of Building N. Garage r to
Owner Pete James LeDonne ,-,„
Contractor Owner
Amount of Permit $ 24.00 Date May 15, 1980 .
Toni L. Sherwood
Clerk F
NOTE: ALL CHECKS MUST BE MADE PAYABLE TO GARFIELD 00. CLERK & RECORDER
. - - Inspector must sign all spaces pertalning to this job - - i
INSPECTION DATE INSPECTOR
i
Foundations:
Setback _
Trench
_. Reinforcing
Foundation Wall end n0 4°°77 /
Weather Proof ing //n S / l
Pour no concrete until above has been signed
Concrete Slab Floor
Electrical (Groundwork)
Plumbing (Groundwork)
Gas Piping (Groundwork)
Do not pour floor until above has been signed
•
Rough Electrical
Rough Plumbing
Rough Gas Piping _
Rough Heating and Ventilation
(Above must be signed prior to ^ _.
framing trust be sig /,l• / / (/ / /N ^ /y
._ Framing 4,` �; / �� d'J
Cover no work until above has been sign
Lath and Plaster (Interior)
Lath
Scratch Coat
Brown Coat f
Finish Coat
_: Wallboard - alln
f L an P laster (Exterior/
Lath
. Scratch Coat
T" Brown Coat
Finish Coat
Miscellaneous
_ Roofing
Sewer
Refrigeration
Electrical Underground _
Final
Electrical Fixtures
Plumbing Fixtures _ .
Gas Piping
Heating and Ventilation 7j /� 1
Job Completed .1i'� / OS7
• FOAM 300.2