Loading...
HomeMy WebLinkAbout2007 N? 002007 GARFIELD COUNTY BUILDING AND SANITATION DEPARTMENT ' 2014 Blake Avenue Glenwood Springs, Colorado 81601 (303) 945-8241 /(303) 625.3321 • Job Address _ Parachute, CO C o l ony Project Temporary Facilities Nature of WOrk Building Permit Use of Building Pipe Fab & Structural Shop - Building PP-24 Owner Colony Shale Oil Company Contractor Brt3Wn & Root, Inc. 537 , Date: September 2, 1981 Amount of Permit: $ riUSie Clerk BUILDING PERMIT APPLICATION GARFIELD COUNTY BUILDING AND SANITATION DEPARTMENT Building No. PP -24 Garfield County, Colorado, August 10 1981 Owner: Colony Shale Oil Company Contractor or Builder: Brown & Root , Inc . Location: - Parachute, Colorado — Colony Project — Temporary Facilities Purpose for which building is to be used: Pipe Fab and Structural Shop Size of Lot: Distance of building from property line at Front: N/A Rear: N/ Left Side: N / A Right Side: N/A Distance from nearest building: - N / A Number of stories: Source of water supply: N/A Number of rooms: Type of sewage disposal: N/A Type of foundation: Concrete Width of building: 100' Material in outside walls: Fabricated Steel Length of building: 102'-2" Exterior finish: Painted Sheet Metal Height of walls: 20' Type of roof: Metal Floor space in square feet: 10,216.6 sq. ft. Estimated value: $ 125,020.00 Date construction will begin: Date of completion: Permit charge: $ 326.00 Plan check fee: $ 211.90 TOTAL: $ 537.90 . And I /We hereby agree to build strictly to the terms of the above description, and also to clear the grounds and adjacent street or streets of all rubbish and debris caused by the construction of said building. Respectfully, /2 �''' Fl d E. Myres Senior Permit Coordinator The County Commissioners hereby grant the above permit as per terms therein stated. This / day of .c 71 , l/ ' j BUILDING OFFICIAL