HomeMy WebLinkAbout2258 Na 00 2258
GARFIELD COUNTY BUILDING AND SANITATION DEPARTMENT
2014 Blake Avenue
Glenwood Springs, Colorado 81601
(303) 945-8241 / (303) 625 -3321
Job Address l— -5R1R County Road 346. - Silt
Nature ofWork Building Permit
Use ofBuilding Greenhouse '.,.
Owner W.E. Limbach
Contractor David Coddington _
Amount of Permit: $ '0
Date: December 7, 1981
94.0
Patsy J. Tenney
Clerk
LA-
BUILDING PERMIT APPLICATION
GARFIELD COUNTY BUILDING AND SANITATION DEPARTMENT
2014 Blake Avenue
Glenwood Springs, Colorado 81601
945 -8241 / 625-3321 I Garfield County, Colorado, Sa%ye.' , 19$x.
Owner: a,
Contractor or Builder: \ 1 ca.-A ca.-A cb. C cp):0
Location: �cit-1 r`ta. — 1 4— \ -41
Purpose for which building is to be used: �s rec` —tip
Size of Lot:
Distance of building from property line at
-- Rear: °._ Left Side: Right Side:
Front: Rear:
Distance from nearest building:
Number of stories: \
Source of water supply:
Number of rooms:. \
Type of foundation:. QS �c r < i
Type of sewage disposal: YP
Width of building: r Material in outside walls: ®° c
Length of building: v Exterior finish:
Height of walls: zit 1 Type of roof:.
Floor space in square feet: \ V Cr-
Estimated value: $ i ci 0 ' C.' Ca
"Th Date construction will begin: v
.� c 15't Date of completion: °^ cig
Permit charge: $
Plan check fee: $
m 0
TOTAL: $ 4'
And I /We hereby agree to build strictly to the terms of the above description, and also to clear the grounds and
adjacent street or streets of all rubbish and debris caused by the
`\ construction of said building.
Respectfully,
The County Commissioners hereby grant the above permit as per terms therein stated. This
7 � day of
fa r_ e ;77 ed , 199
, � BUILDING OFFICIAL .... .
9n pce on IPecokd 2 CO2258
POST THIS CARD AT OR NEAR FRONT OF BUILDING
•
e� r 4 l I N 002258
L GARFIELD COUNTY BUILDING AND SANITATION DEPARTMENT
2014 Blake Avenue
Glenwood Springs, Colorado 81601
(303) 945-8241 / (303) 625-3321
Job Address 5876 County Road 346, SlIc
Nature of Work Building Permit
Use of Building Greenhouse
owner W.E. Limbach
Contractor David Coddington
Amount of Permit: $ 24.00 Date: December 7, 1981
•
Patsy J. Tenney
Clerk
NOTE: ALL CHECKS MUST BE MADE PAYABLE TO GARFIELD COUNTY TREASURER
Inspector must sign all spaces pertaining to this job
INSPECTION I DATE INSPECTOR
Foundations
i
Setback ✓ 2 S � / a/
Trench
Reinforcing
Foundation Wall aV ,E AMU
Weatherproofing
Pour no concrete until above has been signed
Concrete Slab Floor
Electrical (Groundwork)
Plumbing (Groundwork)
Gas Piping (Groundwork)
Do not pour floor until above has been signed
Rough Electrical
Rough Plumbing
Rough Gas Piping
Rough Heating and Ventilation
(Above must be signed prior to framing in section)
Insulation ® a Mar
Framing 0 - / Z .1*0 8 / -
Cover no work until above has been s'. ned
Lath and Plaster (Interior)
Lath
Scratch Coat
Brown Coat
Finish Coat
Wallboard
Lath and Plaster (Exterior)
Lath
Scratch Coat
Brown Coat
Finish Coat
Miscellaneous
Roofing
Sewer
Refrigeration
Electrical Underground
Final
Electrical Fixtures
Plumbing Fixtures
Gas Piping
Heating and Ventilation
Job Completed Artert0 C.- [� •
-
FORM 300.2
i
1
N
S-
a) s_ a)
s— (1)
Z' G Q r
Z ms Z
Z a1
J a) .. C
` a) . 0 ~.. L
u-- '
�� 0- d 0-
N W
G 0-
us N
H
K 0
W J
J 0
z 0 c
fa
Z
O I
J
Z K
CO • Z
U
4 ? IA O K
W o
U
C
.....,,,j ismissossiossisosse
GARF I ELD COUNTY.
STATE OF Col orado 4/
Oifice of Building Official '
i
Date 7 ' EST FOR INSPECTION
t e/ REQU Permit
• .
Time ' •... — ,
Received .• • -
I strtct No_.--------
Job Address Local tY
Owner's / -- ..," - b
Name - • . - A. Contractor
RtMOING PLASTERING ELECTRICAL PLUMBING HEATING
Foundation __ 0 Wire__ . . .... ...0 Rough Wiring _Ell souo 0 Rough ............ 0
Chimney .......... . 0 Lath— ..... —0 Finish Wiring_ E3 Final 0 Final 0
Framing ........... . 0 Seratch_—..„...0 Fixtures ..... .....0 Sewers 0 Water Heater- 0
Final ................ 0 Brown— ..... —0 Motors. ............ 0 Gas 0
Footi Nal Finish_ _.........0 cesspool 0
Weatbetprf Ul Wallbond 0 Underground 0 .
Insu i at on 0 READY 0110 - • SECTION
Mon. Tue. ft leg. Thurs. .--:-77 F rt. --_______ • .M.
fcsi-C3
Inspection agelde___(----- 1' Ss WIC -
Inspector it ____--■----'—'--------
_---------_____
GARFIELD COUNTY
' STATE OF Colorado
thrice of Building Official •
• / t Q UEST FOR INSPECTION
Dale /' __4 1 ( Permit No.__ z
Time / dir
Received 6 � � l e 1 : strict i o.
-.e tailless 1 0 / /(JJJA / 4' Locality
i
O.vn er' J/. / L ��
Name _ L V9 r 'L>! r 'o nlracl or
13uif D PLASTERING ECTRICAL PLUMBING HEATING
Fourrva" ❑ Wire.._ ❑ Rouoh Wiring.❑ Hough ❑ Rough ❑
Chimney ❑ Lath. ._.. —... .. ❑ Finish Wiring „❑ Final ❑ Final 0
Framing Sc:aich__..._...❑ Fixtures ❑ Sewers ❑ Water Hearer.. ❑
Final ❑ Brown– _ ❑ Motors_ ❑ Gas ❑
Foo i ngS ❑ Finish.__ ❑ Cesspool ❑
bleathrerorf ❑ Wallboard ❑ Underground ❑
Insulatl on ❑ READY F•: PECTION
Lion: Tuez. Wed Thurs. Fri
. P.M.
inspection �d
I nspector /��`3O n, 52—c> /{�'vL 111 C.
• GARFIELD COUNTY
STATE OF Colorado -
Office of Building Official 7 , yam Q REQUEST FOR INSPECTION ' ' `�. ,� ___,2
Date 0A C'7 �/ Z- Permit Nn, O
Time L - Co . -
Received - Di strict No
CC Mr a
Job Address / c70 as / •^ Locality
Oner's /,af/ A E I /4y Ln (/�^
2a a s iii+++ " 1 Wd ac � Conlsacl or
� -. -_-
I LUI t PLASTERING ELECTRICAL PLUMBING EATING
Wire_ ❑ Rough Wiring _0 Rough ❑ Rough ❑
Chimney ❑ Lath. __..— ..____.❑ Finish Wiring ..❑ Final ❑ Final "❑
Framing ❑ Sc re ich_..❑ Fixtures ❑ sewers ❑ Water Healer_. ❑
Final s jirti6rown___..__.❑ Motor_ ❑ Ges ❑
Foo i ngs ❑ Finish_ ❑ y- I cesspool ❑
bleatherrrf ❑ Wallboard ❑ r r�`r�/!d✓ §- underground ❑
Insulatl on ❑ - READY FOR INSPECTION } ^� A_M
Mon. Tu Wed. Thurs. _„ Fri. " P.M.
Inspection M e // . 7-0 � � ?: - -
Inspector 3 or
roan 300.1 JJJ _ _ _ -