HomeMy WebLinkAbout2482 Ack
N2 002482
GARFIELD COUNTY BUILDING AND SANITATrON DEPARTMENT
2014 Blake Avenue
Glenwood Springs, Colorado 81601
(303) 945.8241 / (303) 625.3321
Job Address 97 River View Place. Battlement Mesa
Nature of Work Building Permit
Use of Building Residential
Owner Robert Dorssey
Contractor Dorssey and Sons Construction
Amount of Permit: $ 391.50 Date: April 1, 1982
Patsy J. Tenney, Clerk
+ •
• •
•
.877 CERTIFICATE OF OCCUPANCY
•
• BUILDING DEPARTMENT .
• GARFIELD COUNTY, COLORADO •
•
• . Issued Without Fee •
. .
.
•
. July 2 19_82 • . Permission is hereby granted to Robert Dorssey • •
• •
• Building Permit No. 2482 Zone District _ •
• •
• situated at • • • _ - . _ _ Lot Blk. Addition •
• e
• for the following purpose Resddentlal •
• (State Nature of Use) •
• Contractor Dorssey and Sons Construction
•
•
•
•
TAKE NOTICE White: Owner •
• No change shall be made in Green: Lending Agency • •
: the use of this building with- Gold: Contractor GARFIELD COUNTY BUILDING DEPARTMENT
• %, out prior notice and certifi- Yellow: Building Department •
care from the Building Official: Pink: Assessor By i .. - , •
•
BI LDING PERMIT APPLICATION
GARFIELD COUNTY BUILDING AND SANITATION DEPARTMENT
2014 Blake Avenue
Glenwood Springs, Colorado 81601
945 -8241 / 625 -3321
Garfield County, Colorado, Y ! ( , 19SZ
Owner: i r
Contractor or Builder: !
Location:
Purpose for which building is to be used:
Size of Lot: 1 2 f)OO
Distance of building from property line at
Front: r-)7,5 Rear: (2.5 Left Side: 1 7 Right Side: c ,2
Distance from nearest building: 93',1 `— t-s7-cc47 Number of stories: 0 2 —
Source of water supply: L)./0 r4Ze." Number of rooms: 9
Type of sewage disposal: � , e-t 14 4. 14 4 Type of foundation: 1OYZZ, �� �a ,p A/44;
Width of building: Material in outside walls: eteai -t "" ��[.&
Length of building: Z Exterior finish: ,.ate-- ./
Height of walls: 2-5 Type of roof:
Floor space in square feet: c2¢ 7
Estimated value: $ R7 POD
Date construction will begin: 4u. 1 /4 Date of completion: / /
Permit charge: $ (o / C9 G
Plan check fee: $ / 7 0 6
TOTAL: $ ca 7/ . r 0
And I/We hereby agree to build strictly to the terms of the above description, and also to clear the grounds and
adjacent street or streets of all rubbish and debris caused by the construction of said building.
Respectfully,
The County Commissioners hereby grant the above permit as per terms therein stated. This day of
, 1 9/'�
BUILDING OFFICIAL
p `.A i Y,I I, .ir. •'l. .,u } 1 %'} tl'. �.1 �,. Yy w;1'F A �. 'V....,� r f1 , .',,
1 U CALCULATION FOR WALL 1 -
LINE ( TABLE W -1 WALL AREAS SQ. FT. •
1. GROSS WALL AREA •(A0) - w '
2. WINDOW AREA (kg) 30 7 , 2 8
3. DOOR AREA (Ad) 73 , /3 •
4. ! OTHER (SPECIFY) ' 1.771-
5. ,' OTHER (SPECIFY) FRAMING AND CAVITY RATIO
6. ! OPAQUE WALL AREA (Am)) c �
LINE 1. - SUN 2 THRIT 5 21 g ' . STUD FRAMING CAVITY
7. FRAMING AREA (Afr) SPACING RATIO RATIO
LINE 6. X TABLE W - • 137, /Z 1 12' '� .22 .78
8. 1 CAVITY AREA (Ac) 4 7�. 7 - 16 1 .20 .80
1
1 LINE 6. X TABLE W -4 24 - .15 .85
TABLE W- OPAQUE WALL CALCULATIONS FRAMING AND CAVITY .
SOURCE OF WALL
THERMAL MATERIALS • WINTER HEATING R VALUES
. RESISTANCE • CAVITY FRAMING OTHER
9. OUTSIDE AIR FILM rirMIIMINII
I0. EXTERIOR FINISH 3 fel �,
immi OUTSIDE SHEATHING IT !- ► _ ��^ �' • FRAMING + 1���,�.M
gimmi CAVITY INSULATION gi A a
AV T' A SPACE
15. INTERIOR FINISH i46 045r
16. . INSIDE AIR FILM 0 (v ge $
mail OTHER SPECIFY
:11 OTHER SPECIFY -----
9 . • TOTAL RESISTANCE R )1,2 /D s 6Z
'SUM OP`' LINE S" 9 THRU 19
MI U f FRAMING � � b Z
1/R (FRAMING COLUMN) . ! ■
N C AVITY , � 2 (CAVITY COLUMN)
2. U OTHER .
1 /Rt (OTHER COLUMN) ' 7"1"4 411111
TABLE W- SUMMATION OF TRANSMISSION VALUES'FOR WALL
SOURCE U -VALUE FROM LINE • AREA FROM LINE U -VALUE X
FRAMING o - z. LINE 20 . - LINE 7. - , (
CAVITY TrZrIW `-- 26 "r'
OTHER
OTHER R -. mehrMillim —.
WINDOWS - R p Z .r LINE . D , S"_
DOORS �! _ R LINE _ ��
TOTAL � � A SUNUXA = _ • p # . •
U WALL = SUM OF (U- VALUES X CORRESPONDING AREAS) = 12 3
0 - GROSS WALL AREA (A0)
'-' . , ,CALCULATION FOR FLOOR
LINE TABLE F -1 FLOOR AREAS SQ. FT.
��-
1. GROSS FLOOR AREA /C lea TABLE F -4 CAVITY RATIO
t FRAMING AND
2. FRAMING AREA (Af, -) /6 g. JOIST FRAMING CAVITY
c LINE 1 X TABLE F -4
3. CAVITY AREA g SPACING RATIO - RATIO
{ LINE 1 X TAB LE F -4 / ,,5/ 3 1 0.13 O _
4. OTHER SPECIFY
_____ ��� 0.10 0.90 --
0
5. OTHER SPECIFY) „ _ 24" 0.06 .9a
TABLE F -2 FLOOR CALCULATION5 FLOOR 4 HEATING
SOURCE OF
THERMAL MATERIALS WINTER R- VALUES
FRAMING 1 CAVITY
6. OUTSIDE AIR FILM
RESISTANCE _____- 1-" /7
7. EXTERIOR FINISH / S --"-
9. CAVITY INSULATION _ 3 Yz. BA 17
10. CAVITY AIR SP 3�� �` Y �,411 4 -
11. DECKING _
12. FLOOR FINISH �9RP, T - /#23 /-23
13. INSIDE AIR FILM
14. OTHER SPECIFY } ��_
�i 15. OTHER SPECIFY -
16. TOTAL RESISTANCE (Rt) • f 1 ,SI /1
SUM OF LINES 6 THRU 15
17. Ufr (FRAMING) ,O ee
1 : U. k I MA -4.14111111111111
18. Uc (CAVITY) * o713
1 /Rt (CAVITY COLUMN
TABLE F -3 SUMMATION OF TRANSMISSION VALUES FOR FLOOR
SOURCE U -VALUE FROM LINE AREA + FROM LINE U -VALUE X A
FRAMING •068 - LINE 17 . Z. LINE 2 / • S3ds
' ,O7- /3 LINE 18 /.5 LANE 3 /07. 2'33`]
OTHER
- r.AVITy � 11R ,�,,..... LINE 4 �..._.
OTHER 1/R �... LINE 5
TOTAL ftlea Ao - /4,6 SUM U X A_= / '72
SUM OF (U- VALUES X CORRESPONDING AREAS) = , O 7 / p
U FLOOR = Ao
4
`r
, L- , �_ _ .
w
.4 JANE TABLE R -1 ROOF/CEILING AREAS S. ST FLA T
1. GROSS ROOF AREA q /
C 2. SKYLIGHT AREA
_ 3. ROOF VFia AREA ---.
4, OTHER (SPECIFY)
5. NET (OPAQUE) ROOF AREA g r 6 TABLE R -4 FRAMING AND CAVITY RATIO
LINE 1 - SUM 2 THRU 4 FRAME FRAMING CAVITY
6. FRAMING AREA (Af _SPACING RATIO I RATIO
1 INF S X TART F R-.4 g �' 12" 0.13 0.87
7. CAVITY AREA (Ac) 73 1 0.A 1 1 . 0.90
INF 5 X TARI F R -9 24" _0.06 1 0.94
,TABLE R -2 QPAOUE RQQF /CEILING CALCULATIONS
SOURCE OF 1 ROOF /CEILING HEATING
THERMAL MATERIALS WINT R A ES
RESISTAN E " FRAMING CAVITY
8. OUTSIDE AIR FILM _._. 1111117111111111711111 EXTERIOR FINISH
10. OUTSIDE SHEATHING
11. F" M' ' - 3 1 atl.1111
1 . INSU ATION NM L ,, . 63,40 ..
13. CA I 6103 DWIRMAIM
14. INT RIIR FINISH W Dr
I INSIDEAIRFI M 7. OTHER (SPECIFY
18. TOTAL RESISTANCE (Rt) 6 13,10g - 317, 3 _ IM__ SUM OF LINES 8 THRU 17
19. Ufr (FRAMING) Z”
1 Rt (FRAMING OL MN
20. U (CAVITY) �b 2511
1 R+ CAVITY COLUMN ••1,.I.HimIll■ 1
ThRI R -3 SUMMATION OF TRANSIMISSilN VA 1: 1 LTNr
S n i t F-. _ U - .YA.L.UF_.__�, �.2DJ J I IV E AR F� F R OM I I ' A g `.
FRAMING, .Z322? g
LINE 19, i,6 IINF 6. /,
CAVITY i47 2_6 - 1 , LINE 20. 731, LINE 7. /g. S3'
SKYLIGHT 1]R LINE 2.
ROOF VENT 1]R LINE 3.
OTH TR .PM.. �, �M.... 1 R ,,... _ LINE 4. ._...._._...
OTHER -- ----- - 1/R ,,-.:. LINE 5.
U I- A, . L4 SUM U X A = 2e , 5
U ROOF /CEILING SUM OF (U- VALUES X CORRESPONDING AREAS) = ' 0,2
l ,. _ GROSS ROOF EILIN ARE (A.
•
•
GAki I EL_U LUu j i
-
STATE OF Colora
Office of Building Official
/`— 1EQUEST FOR INSPECTION
Date _..- ..4��. /...- .�f........ Perrnit No_`�d,�
Time A.M
R ecc ed District No
Job AOA /rss - Locality
Ore■er's A
Name Contractor
PLAST ELECTRICAL PLUMBING HEATING
Foundation ❑ Wire._ ❑ Rough Wiring Rough ❑ Rough ❑
Chirriney ❑ Lash__—_, ..... ... 0 Finish Wiring__❑ Final ❑ Final -❑
Framing ❑ Sc —_.. _._..❑ Fixture% 0 Sc••cri ❑ Water Heaier.. ❑
Final .• 0 Finish Brown— _._._. fJ Motors ❑ Gas ❑
p
Weath r1 1T __ —_ ❑ Und O
Wallboard ❑
Insulation ❑ READY FOR INSPECT A.M:
Mon: Tues Wed, urs q M Fri. _ P_KA,
inspection Made �,� _„ _,_ _ p
Inspector _
row•• 300.1
IIIIIIIIIII�. ....
GARF I EI D cauNrY
STATE OF
Colorado
__ _•.
Olfice of Building Official
EOU EST FOR INSPECTION
Permit N..
Tiure D
^.. Locatlty
-- -' - " " - -~ Job - Address
ner's ��AIP.r2 --. — ...* Contractor �•� -- �.�.. _�I
Name — ELECTRICAL
PLASTERING PLUMBING HEATING
0 Rough ❑
'Wiry ❑ Rough Wiring .0 Rough ❑ Final -❑
Fh -- 0 Finish Wiring._❑ Final
Chimney---- •• ---._ ❑ Lath __–.__.-..--- --'--❑ ❑ Sewers ❑ Water H..etef.. ❑
❑ $c "rat.ch__.___.__.. -❑ Fixtures
Framing 0 Motors. ❑ Gat ❑
.Broom__ Gc•a. pool
Footi ngs ❑ Finish____- ❑ Underground ❑
Wea her rf ❑ Wallboard ❑
Insulation ❑ READY FOR INSPECTION Thum Tues. Wed. Or-- P.M ..-
1 nspectior+
nspecto I.9ade _�
r ^
— GARFIELD COUNTY
STATE OF Colorado _
•
Office of Building Official
{BEQUEST FOR INSPECTION
Date. /� / _ • Permit No. P7"8"--•
�'Q-�
Time Dtstrk NO_
Reeerved . !
•
5.7 4 1. , /ei // k� .,
Job Address Locality
Owner's
Name - -4 s Contractor
.—•■a PLAST RING ELECTRICAL PLUMBING HEATING
Foundation ❑ Wire ❑ Rough \Miring_❑ Rough ❑ Rough ❑
Chimney 0 Lath ,__,___..____ 0 Finish Wiring.. ❑ Final ❑ Finot .❑
Framing ❑ SCrat Fixtures ❑ 5ewcr7 0 Water Heater.. ❑
Final._, ❑ Brown_— 0 Motors_ ❑ Gel
V Qotti ngs ❑ Finish_ ❑ Ccaspool ❑
eather rf .15- Wallboard ❑ Underground ❑
Insulation 0 • READY FOR INSPECTION
Mon. Wed. C Thur �. FrI. P.M.
Inspection Made / _ . / -= �`�.,._.. •
Inspector � _ �-
ro• 300.1 —
G COUNTY..
STATE OF Colorado -
Office of Build Official
REQUEST FOR INSPECTION
Dat /��� _ Permit No. c O / ��
R eceived District No_
R
97 /le
Job Address Locality
Ovvner't:
Nam[ / v� 4—>" Contractor
'"
PLASTERING ELECTRICAL PLUMBING HEATING
re ndation Wire__ ___..___ ".❑ Rough Wirinp_❑ Rough ❑ Rouph ❑
Chimney Lath . Finish Wiring__❑ Final ❑ Final -
Framing ❑ Scratch .0 Fixtures ❑ Sewers ❑0 Water Heater_. ❑
Final __ ❑ Brown ❑ Motors_ ❑ GaS
Footti ngs ❑ Flaw, _ — "___._.❑ ce»poot 0
Weather rf ❑ Wallboard _ .___❑ Underground ❑
Insulation ❑ READY FOR INSPECTION
Mon. Tues. Wed. �y Frl_� P.M.
Inspection Made / "? ' — / �• et -
Inspector •
soo.t _.
STATE OF Col orado
Office of Bu;Icfing Official
FiEOU EST FOR INSPECTION
Pelmit
Tai
-.M. D■sir3o.
Ar
Owner's 11111
DIN PLASTERING ELECTRICAL • PLUMBING HEATING
IMMEN.........
. GARF I ELD COOKY
.,
, Colorado
, STATE 0 F-------_—_—_—
, • Office of Building Official
,
., REM EST FOR INSPECTION
Permit
Ttpiaernice: -
ived_,-1=11'3:----------/7:a7q, . ID .
'Sir IC% Nc,_ ------------
•
--------------9-7—gi---- n2_ ael----------_—_ -----
Job Addles% Locality
ON7ri nleer—._.5 ''NZ...-IP'--5-d:-,-?,—'- --------Co nt r a C1 or_.------ --------------
BUILDING PLASTERING ELECTRICAL HEATING
F ou tion ...... 0 Wire ..--- ........ 0 Ro.gh VViring .0 Rough ............ .7„Et Rol...1;h ........... 0
ChirmleY ............ 0 1-2th ---- ........ 0 Finish Wiring .. 0 Final ............ _____ 0 Final -------- 0
Framing ............ 0 Seralch — ........ 0 Fixtures .......... 0 Sewers ............... 0 Warer Healer- 0
Final.... ............. 0 Brown .-- _. 0 motors._ ......... 0 Gas ................. . 0
F n gs 0 F;rosh________:_. 0 .0
Weatb erprf 0 Wallboard ........ 0 Underground 0
Insu 1 atl on 0 READY FOR INSPECTION
Z4111 IV, Wed. Frt.
1.,.,->ecti0n Made_ cP, Adri
_....i_4%..S4; _—_.
,
L0It
5..;,1C CAF. r..< of t? e; y C ,iricial
REOUEST FOR INSPECTION
Pt rmil No_ ������
c�— �--
!1 :- t C _� lrisD
1 L �[ P.M. DiSlrrC1 N o..-------
97 .411P
�d�alllr
Job Addrea
ConLaclo/ / r7
N . s -h � , w •, ({EATING
P'eme� ERING ELECTRICAL PLUMBING ❑ Rough ❑ ' Rouph 0
❑ Rouwh Wir:np.❑ ❑ F■net
Foundation__.. - - -❑ W:re_.� ---- - -• Fin4h Wiring.. Fina)
�❑� lath.-------- - -•-•D ❑ Ydater Ncntrr_-
Fr -pin ,J�+ Scretch_ - -_ ❑ Fixsui .......... ❑ Sewrry ❑
❑ Ga:
p ❑ — .- --- - -❑ Motors Cesspool_----- - • - -•D ..
Fi�r.i..- ng - - - -- -- ❑ rini.h— - - - - - -D
Footings pos.d ❑ Underground ❑
lnsuI at�? on ❑ w.ii
lnsu dt1Dn ❑ READY FOR INSPECTION Thurs. � —
Tues. Wed C 1 to
inspection h ".a d � L! G a
inspect �� _ ---
� —�� -�..
goo -1 _ -.. -- -– 1
GARFIELD COUNTY
• STATE OF Colorado
J - - Office of Building Official
I - REOIJEST FOR INSPECTION
Z"-- 6 Z-
Date 71
-L /� Permit No_
Time CA . `
Received ( 4 � r ? P -M. 1 District No -
(7 �i kfr em_.) � _
Job A e ress Locality
o wner's --
Name $ 0 •
Contractor
I' • DING PL•STERING ELECTRICAL PLUMBING HEATING
Foundation ❑ Wire_ ❑ Rough \Ni•ing.❑ Rough ❑ ' Rough ❑
Chimney ❑ Lath__ ❑ Finish Wiring_.❑ Final ❑ Final ❑
Framing •❑ Scratch ______. Fixture. ❑ Sewers ❑ Water Heater__ ❑
Final._ ❑ Motors_ ❑ Gas - ❑
- .---.-•- - - --- ❑ Brown_..._ Cesspool ❑
Footings ❑ Finish_— ❑
Weather[� rf ❑ Wallboard ❑ Underground ❑
Insu at1on IT READY FOR INSPECTION
Mon. hu rl. Fri. P . M.
Tues Wed. � M
Inspection Made . :
Ins ector
GARF 1EL0 COUI�TY
STATE OF Col
Olfice of Building O ficia1
REOUEST FOR INSPECTION
Date � c !/4 7 P ermit No. f li c
Time
Received ! `: P District No
Job Aooress Loca Ity
v
O,ner's
Nam ff •5 __ Contr .
PLAERING ELECTRICAL P HEATING
Foundation ❑ W:re • _ � ❑ Rough Wirinp_❑ Rough ❑ Rough ❑
Ch :mney ❑ L�ih._ ❑ Fin :sh Wiring..❑ F :nal ❑ Final -
Fram ■np ❑ Scrni[h�___...❑ Fixtures ❑ Sewcrs ❑ Weser Healer__ ❑
F:nel ❑ Brown .0 MoiorL ❑ Get ❑, •
Footi ngs ❑ Finish ❑ ccs,pool ❑
Wea -tb erDrf ❑ wallboard ❑ Underground ❑
Insulat1on -ET READY FOR INSPECTION
Ir Tues.. Wed. r hurx: Fri. P.M.
Inspection Made c
Inspector _ _ -
GARFIELD COUNTY
STATE OF Colorado
Olfice of Building Official •
REQUEST FOR INSPECTION
Date _ 9•''' r •-• Permit No Qiie .,.. _�
Time r
Received,.. / � p �f� / + / !� • J _t District No
Job Addr :1. �� �, � /� ..�._.�
Locality
Name__ � Contractor _
BUILDING ELECTRICAL PLUMBING HEA71NG
Foundation ❑ wire ❑ Rough Wiring _0 Rough ❑ Rough ❑
Chimney ❑ Laih__—_._ ______ __❑ Finish Wiring_.❑ Final ❑ Final .❑
Framing ❑ Sc _❑ Fixtures ❑ Sewer, ❑ Water Heater_. ❑
Final__ ❑ Brown 0 Motors_ ❑ Gas ❑
Footings ❑ Finish❑ Cesspool ❑
eater rf ❑ Wallboard __ ______ �' Underground ❑
Insulation ❑ • READY FOR INSPECTION ■sii;r5
Mon: Tues. Wed. Thurs. ri. P.M.
Inspection Made_ LS�r ���
Inspector
r c .... a o 0.1
11 i
S,A,E OF C0101 �._.
0114 r of Eloilr'ing OU cial
. REOUEST FOR INSPECTION
���
6;_<:2Z/6
(,dale_ Permit No__ - .
lime • �® _ P
Received Dist - rict No - �.
Job ACWICSS Locality •
N CZ7b,,P6 � • Contra
Neme G.
BUILDING PLASTEANG ELECTRICAL .
HEATING
Foundation ❑ wire_-- _..._ - - - - -❑ Rough Wiring Rough 0 ' Rough ❑
Chimney ❑ Lath.. . - -. -- - "❑ Finish wiring - -0 Final ❑ F inal Healer-- ❑
Framing ❑ Scratch___ ❑ Fixtures ❑ Sewers
Final ❑ Brown„ Motors-______...... ❑ Gas -
Footings ❑ Finish__ ❑ Cesspool._. -_ _ __ A.M. eathner rf ❑ wallbo R�ApY F INSPECTION Underground- - ❑
Ins. lat�on
Mon. � / / wed. Thurs. F.1_ G01.113 i nspection Ma de. —�/ / �— -" ! 5 -
Inspect _ '-
,nn s .
IARF-JELD C Iiis'i
- .
STATE OF Colorado
_
.. , " Off;te of El uildin9 Of ficiiTT--------
- REOUEST FOR INSPECTION
,
Date
..,, e.,-,-,
Pe, rnif No
Tirrbe
Re ce;ved______ C fr
. _
•Ist•ict No -
Job Adore - 'd.' Locality
OL-,..ner's "'Pe Air
Nrsrne . 4/ .,• .4 , - , ..---'' .
Contract
E LECTRICAL
PLASTERING
PLUMBING HEATING
F •c",..:,,LLT..761,...,...70 Wire 0
tV1.4..;n: - Rough 0 ' Rough, ........ 0
Ch; rnr■ey --- ..... — 0 Laih_-_----_—_,. 0 A1-7,1,':
FInrrt.._ . '0
F"n1;^g .......... - 0 Srrairh___.0 „,s,„Vfq 5;--1 ................. 0
... .._.., -,e.-rer.
B . ...0 mo,orc ....... ___ ..._ ......... _ 0 Maier 1- frAzer__ 0
E;nel ....... JR
,-; ...... z ........... _ ID
FootingS T1 Finish
Cesspool ....... .... 0 .
WeatberPrf 0 w El Underground 0 —
InsulatIon 0
RUADY FOR INSPECTION
A.M.
Tuei.
Wed.
Thum.
-Zibli
-------_____,
In•prction rk IA
!n•
-____---.1:—/-3..-------
•
AllSpeettOR 00 4
POST THIS CARD AT OR NEAR FRONT OF BUILDING
GARFIELD COUNTY BUILDING AND SANITATION DEPARTMENT
N° 002482
2014 Blake Avenue
Glenwood Springs, Colorado 81601
(303) 945 -8241 / (303) 625 -3321
Job Address 9:97 River a' +r s: Place, Battlement Mesa
Nature of Work Building permit
Use of Building
Residential
Robert Dorssey
Owner
Dorssey and Sons Construction
Contractor
Amount of Permit: $
391,50 Date: April 1, 1982
Patsy J. Tenney, Clerk
NOTE: ALL CHECKS MUST BE MADE PAYABLE TO GARFIELD COUNTY TREASURER
Inspector must sign all spaces pertaining to this job
INSPECTION I DATE [ INSPECTOR
A �
Foundations -/ . , f - w
Setback
Trench _
Reinforcing
Foundation Wall ro -
Weatherproofing
Pour no concrete until above has been signed
Concrete Slab Floor ff s 7 g - /
Electrical (Groundwork)
Plumbing (Groundwork)
Gas Piping (Groundwork)
Do not pour floor until above has been signed
Rough Electrical .
Rough Plumbing
Rough Gas Piping y :42 V -;-71.2
Rough Heating and Ventilation / "
(Above must be signed prior to framing inspection) _ Y
Insulation � giRMTANDriail
Framing ' As I -
Cover no work until above has been signed
Lath and Plaster (Interior)
- - - -- - - - - - -= _ - Selatch Coat
Brown Coat
Finish Coat
Wallboard
Lath and Plaster. (Exterior)
Lath
Scratch Coat
Brown Coat
Finish Coat
Miscellaneous
Roofing
Sewer Fl,�/prce 0 1. 1 c4.5roti „ ( wf4E
Refrigeration
Electrical Underground
Final
- Q / 1 1
Electrical Fixtures
Plumbing Fixtures
Gas Piping
Heating and Ventilation
FORM 300.2 Job Completed