Loading...
HomeMy WebLinkAbout2650 PLEASE FILL IN OWNER ON BUILDING PERMIT: Name Ideal Basic Industries Mailing AddressCement Div. Denver, CO Phone Number CONTRACTOR ON BUILDING PERMIT: Name National Miller -Lien Corp. Phone Number (605) 348 -8250 1Y: 4 , I r . . GENERAL TERMS AND CONDITIONS: (IMPORTANT! READ ITEMS 7 AND 8) 1. This permit is issued in reliance upon the accuracy and completeness of information supplied by the applicant and is conditioned upon construction, installation and operation in accordance with this information and with representations made by the applicant or its A : agents. j 2. This permit is valid only for the equipment and operations specifically identified herein. `� 3. Each and every condition of this permit is a material part hereof and is not severable. Any challenge to, or appeal of, a condition hereof shall constitute a rejection of the entire permit and upon such occurrence this permit shall be deemed denied ab initio. 4. This permit may be revoked at any time prior to final approval by the Air Pollution Control. 1 Division (APCD) on grounds set forth in the Colorado Air Quality Control Act and regulations of the Air Quality Control Commission (AQCC), including failure to meet . any express term or condition of the permit. 5. This permit must be retained and made available for inspection upon request at the location set forth herein. With respect to a portable source which is moved to a new location, a copy of the revised Air Pollutant Emissions Notice (APEN) (required by law to j be submitted to the APCD whenever a portable source is relocated) should be attached to • this permit. The permit may reissued to a new owner as provided in Section III.B. of ', it AQCC Regulation No. 3 upon transfer of ownership. 6. Initial approval of an emission permit does not provide "final" authority for operation of this source. Final approval of the permit must be secured from the APCD in writing in "I accordance with the provisions of C.R.S. 1973, Section 25- 7- 114(4)0) and Section IV". of ' .4 '`, AQCC Regulation No 3. Final approval cannot be granted until construction is completed and operation and construction have been verified by the APCD as conforming in all respects with the conditions of the initial approval permit. � 7. You MUST notify the APCD at least thirty days (fifteen days for portable sources) prior to commencement of the permitted operation or activity. Failure to do so is a violation of i C R.S. 1973, Section 25-7-114(4)(j) and Regulation No, 3., Section IV.H- 1., and can result in - 1 the revocation of the initial approval permit. Pp Q o. n . t3. .ou MUST otatain final approval six months of the corttmenca,r: '' Y �rzt f pe.ratio, .as : - that•::term is defined by the AQCC- Failure to obtain final approval will result in .'the • 1 revocation of the initial approval permit. 9. If the APCD deter.mjnes that the terms and conditions of the initial approval permit have '' been. satisfied, the APCD will issue. a .final, ".permit, which does:gpnstlMe. "final ". 1 authority to operate..as discus.se . ; in Paragr4ph 6 above. Q f o Co t he t rms .of a fine. ., . r _ _ • �s Gok%r $}fie r : 10. V al �p,proval_ permit or of ahe prp.ylS -Ion of 3tie ad ., ';- ; . : .. the regulations of the A QCC may result rn administrativ @, civil or criminal enforcement actions under C.R 1973, Sections 25 -7 115 enforce 25 -7 1 121 (injunctions), 25-7-122 (civil penalties) and 25 -1 -114 (criminal penalties). ;j "� 11. Unless specifically stated otherwise, the general and special conditions conjoined in this permit have been determined by the APCD to,be necessary to asSureriq'mpl.ance with the provisions of C.R.S. 1973, 25 -7 -114 O(g) 4 VI:: and, as such, shall be enforcea'blo underthe provisions of C.R.S. 1973, 25 -7 -115 after final approval - of pe_rrrit;has been ' granted: .. . = YtKE11/ED 211