Loading...
HomeMy WebLinkAbout03290 `. INDIVIDUAL SEWAGE DISPOSAL SYSTEM APPLICATION OWNER On, )r /a.J 2. (ionnn ADDRESS nK-S b36G54 PHONE v 'a le d n�e Co 8 /6a5 it CONTRACTOR Too/a/ (o Y ,, c4 ADDRESS P• O. Bo P io ga5icv /4- y L PHONE re:PO G177 -3'03/ PERMIT REQUEST FOR (NEW INSTALLATION ( ) ALTERATION ( ) REPAIR Attach separate sheets or report showing entire area with respect to surrounding areas, topography of area, habitable building, location of potable water wells, soil percolation test holes, soil profiles in test holes (See page 4). LOCATION OF PROPOSED FACILITY: Near what City of Town rot- ha—A.4 k , gyp. Size of Lot /D. 41 Arty s Legal Description or Address f Gyp ,C n .S, . ral ' P (ir i z-. o4 a.-l.e (' WASTES TYPE: (X DWELLING ( ) TRANSIENT USE ( ) COMMERCIAL OR INDUSTRIAL ( ) NON - DOMESTIC WASTES ( ) OTHER - DESCRIBE BUILDING OR SERVICE TYPE: Si 1'ly lecivx tk1 v � Number of Bedrooms o` Number of Persons Z ( /) Garbage Grinder ( Automatic Washer ( Dishwasher SOURCE AND TYPE OF WATER SUPPLY: ( ) WELL ( ) SPRING ( ) STREAM OR CREEK If supplied by Community Water, give name of supplier: DISTANCE TO NEAREST COMMUNITY SEWER SYSTEM: F/4 Was an effort made to connect to the Community System? A site plan is required to be submitted that indicates the following MINIMUM distances: Leach Field to Well: 100 feet Septic Tank to Well: 50 feet Leach Field to Irrigation Ditches, Stream or Water Course: 50 feet Septic System to Property Lines: 10 feet YOUR INDIVIDUAL SEWAGE DISPOSAL SYSTEM PERMIT WILL NOT BE ISSUED WITHOUT A SITE PLAN. GROUND CONDITIONS: Depth to first Ground Water Table Percent Ground Slope 2 , Vr 'FYPE OF INDIVIDUAL SEWAGE DISPOSAL SYSTEM PROPOSED: (') SEPTIC TANK ( ) AERATION PLANT ( ) VAULT ( ) VAULT PRIVY ( ) COMPOSTING TOILET ( ) RECYCLING, POTABLE USE ( ) PIT PRIVY ( ) INCINERATION TOILET ( ) RECYCLING, OTHER USE ( ) CHEMICAL TOILET ( ) OTHER - DESCRIBE FINAL DISPOSAL BY: (4 ABSORPTION TRENCH, BED OR PIT ( ) EVAPOTRANSPIRATION ( ) UNDERGROUND DISPERSAL ( ) SAND FILTER ( ) ABOVE GROUND DISPERSAL ( ) WASTEWATER POND ( ) OTHER - DESCRIBE WILL EFFLUENT BE DISCHARGED DIRECTLY INTO WATERS OF THE STATE? PERCOLATION TEST RESULTS (To be completed by Registered Professional Engineer, if the Engineer does the Percolation Test) Minutes per inch in hole No. 1 Minutes per inch in hole NO. 3 Minutes per inch in hole No. 2 Minutes per inch in hole NO. _ Name, address and telephone of RPE who made soil absorption tests: Name, address and telephone of RPE responsible for design of the system: Applicant acknowledges that the completeness of the application is conditional upon such further mandatory and additional tests and reports as may be required by the local health department to be made and furnished by the applicant or by the local health department for purposed of the evaluation of the application; and the issuance of the permit is subject to such terms and conditions as deemed necessary to insure compliance with rules and regulations made, information and reports submitted herewith and required to be submitted by the applicant are or will be represented to be true and correct to the best of my knowledge and belief and are designed to be relied on by the local department of health in evaluating the same for purposes of issuing the permit applied for herein. I further understand that any falsification or misrepresentation may result in the denial of the application or revocation of any permit granted based upon said application and in legal action for perjury as provided by law. Signed Date PLEASE DRAW AN ACCURATE MAP TO YOUR PROPERTY!! 3 Rug 24 00 12:02p CHURCH 6 Rssocaties 303- 463 -9321 p.1 CHURCH & Associates, Inc Memo Tb: Garfield County Health Department Front Tim Petz CC Data: 0824/00 R. Conner Residence, Lot 3, Pinyon Peaks, Garfield County, Colorado The onsite wastewater system (OWS) included the installation of a 1250 - gallon two - compartment precast concrete septic tank with an effluent filter on the outlet, and 341 square feet of drain field in two trenches using infiltrator diambers. Each trends had one row of 11 chambers. A distribution box was used to distribute effluent evenly throughout the trenches. The OWS was installed in general conformance with our plans and specifications. Sincerely, Tim Petz Geologist, Project Manager --) FAX t c oat ID 910, 3 8`1. 5coy • Page 1 • CHURCH & Associates, Inc. ENGINEERS & GEOLOGISTS December 2, 1999 • Douglas Conner 941 Woodstone Drive Baton Rouge, Louisiana 70808 Subject: OWS Design, Proposed Conner Residence Lot 3, Pinyon Peaks Garfield County, Colorado Job No. 11911 Dear Mr. Conner, As requested, we have reviewed subsurface conditions prepared by CT Thompson, Inc., at the subject site and prepared an onsite wastewater system (OWS) design for the proposed residence. The subsurface investigation was performed on September 29, 1999. SITE CONDITIONS The property is located in a residential area in Garfield County where OWS are required. The proposed drain field area has a 10% slope to the southeast and a moderate cover of scrub oak and native grasses. The residence will be served by an onsite well. PROPOSED CONSTRUCTION A two-bedroom residence is proposed at the location presented on Figure 1. We have sized the OWS based on 2 bedrooms and 300 Gallons Per Day (GPD) using loading of 75 gallons per day per person. The sewage loading with a peaking factor of 1.5 is 450 GPD. This loading includes a dishwasher, garbage grind- er, and washing machine. The drain field is to be a minimum of 100 feet to all wells. SUBSURFACE CONDITIONS CTllfhompson, Inc. performed a subsurface investigation by digging 3 percolation holes, 55 to 60 inches deep, and one profile pit at the locations indicated on Figure 1. Subsurface conditions in Profile 1 consisted of 1 foot of clayey gravel topsoil, underlain by silty gravel with cobbles and boulders to the maximum depth explored of 8 feet. Percolation tests indicate percolation rates of 10 to 20 minutes per inch (MPI). The average percolation rate is 13 MPI. Percolation data is presented in Appendix A. RECOMMENDATIONS We recommend the installation of a septic tank and two chamber -type drain field trenches installed at the locations presented on Figure 1. The OWS design is based on an average sewage Toad of 450 GPD and a DENVER 4501 Wadsworth Boulevard Wheat Ridge, CO 80033 CASTLE ROCK 303.660.4358 303.463.9317 Fax: 303.463.9321 EVERGREEN 303.818.1455 OWS Design • Job No. 11911 Page 2 percolation rate of 13 MPI. The minimum septic tank size required is 1000 gallons. As we discussed and you requested, we have designated one 1250- gallon two - compartment pre -cast concrete septic tank with an effluent filter on the outlet, as indicated on Figures 1 and 3. A distribution box is required to distribute effluent to the drain field trenches. We recommend the installation of two trenches, each with 1 row of 11 chambers. The proposed trenches represent a relatively small drain field. We have not used all allowable reductions possible in the drain field sizing when chambers are used, but do not feel they complete reductions are appropriate in a drain field of this size. Vehicle movement over the drain field area during construction should be kept at a minimum to prevent compaction of the receiving soils. We recommend the bottom of the bed be scarified with a pick, shovel, or backhoe bucket teeth prior to the addition of dispersal gravel. We recommend the surface of the field be seeded after installation of the fields. We recommend using a native seed mix available at seed stores. These mixes do not require irrigation and develop a growth 10 to 15 inches high. No automatic sprinkler system should be installed over the fields. If additional bedrooms in unfinished areas are possible, we recommend the OWS be constructed to serve the additional loading. The present tank configuration will serve a 4- bedroom residence. For greater than four bedrooms, the septic tank can be upsized 250 gallons for each additional bedroom. Each additional bedroom would require an additional 171 SF of field or 11 gravelless chambers OPERATION AND MAINTENANCE The owner must realize an OWS is different from public sewer service. The owner must be aware of, and assume responsibility for, continued maintenance of the system. In the absence of a monitoring program, we recommend the septic tank be pumped every two years. Effluent filter and screened vaults, as applicable, are to be cleaned during pumping. There are daily considerations such as not putting plastic or other nonbiodegradable materials into the septic system. Garbage disposal use should be minimized. The backwash of a water softener may be harmful to the OWS. A separate drywell should be constructed for the backwash waste, if a softener is installed. Chemically treated water from a swimming pool or spas should not be introduced to the OWS. LIMITATIONS An OWS design should be installed by a contractor who is experienced in its installation. Our investigation, layout, design and recommendations are based on data submitted. If subsurface conditions considerably different from those described in this report are encountered, we should be notified to evaluate the effect on the proposed OWS. If the health department makes modifications to this design, we should be contacted to evaluate the impact on the performance of the OWS. The county and our firm must be contacted upon completion of the OWS All construction is to be in accordance with the ISDS regulations. Pipe type and size, burial requirements, septic tank construction, and other specifications, which are not depicted in our report, are to conform to the requirements of the 1SDS regulations. The installer of the system is to have demonstrated knowledge of the APEHD ISDS regulations and requirements. OWS Design Job No. 11911 Page 3 If there are any questions or if we can be of further service, please call. Sincerely, r 0 RE CHURCH & • r � � RE•Cb T9 O . . F . e gtiel *kw- Edward O. Chu ,S+S�ON. . C -- EOC /trp 2 copies sent Appendix A — CTllfhompson, Inc., Geotechnical Investigation, dated September 29, 1999 Copy to: Heidi Hoffman, 504 Midland Park Place, Aspen, CO 81611 Copy to: Todd Haberman, P.O. Box 1210, Basalt, CO 81621 • h w a H P a 1 i 1 I-kill 1 . NI hi 1 ,I •1 A en 1 4 y A 1_-.1 i n n :i . n Y kar Iit1 1 11 a ": 1 1 $I No. 11 a 1 1 ik 5,,_w bb big I le i I atm. iiiigg 11 - Iud ,_ 6 5 yJ Z V ■ 5 Z 1 1 Y b-lir.! I E t' • 1 a f5 F ligiii - g 11/10/1999 11:52 9709259671 N3 ARCH' Mu Ib PACK. LIZ • GEOTECHNICAL INVESTIGATION CONNER RESIDENCE LOT 3 PINYON PEAKS CARBONDALE, COLORADO Prepared For: BRINSON ARCHITECTS 7948 Goodwood Boulevard Baton Rouge, LA 70896 Attention: Mr. J. David Brinson Job No. GS -2843 September 29, 1999 CTL/THOMPSON, INC. 234 CENTER DRIVE • GLENWOOD SPRINGS. COLORADO 9 (9 0) 945-2809 11/10/1999 11:52 9709254671 H3 ARCH11 CUTS F'AGt ND • CONNER RESIDENCE LOT 3 PINYON PEAKS • CARBONDALE, COLORADO J 1 0 fi r, •t 6 Y jO C. ° rTP— ° .0 Y ‘• i a: *. .61111 .sO I TP i l _ n l MAIY Ca agCP ■ P aJ a r TOM r[Y[a WPC 1/e. •F anuYUNO WALL mss. e �!1 a.. I s t, ". V LOC OY,1a VON e - - vclyT LOGOO,1 •1 WTI 1 O i 110 WNII* COYCat 1 AS W MN [KAUAI • a[l&Y1YG WALL I C T I[[ ['y ` YaT[I2al fl10Y NIYS[ Y/ •. ,\,�r�i 9M W OYOM MILty„ItuI a •f 21' MOW CO,1CI[IC PWC , • , MOW voim conlat .500 *MIMING WALL *i'‘ / j CS' 2 ll1,1[O =err , °0 °. P -2 **wiv oY COY[KrtO� S e �� . -/ • 9!• -t ° q a �V C [ 0 SUS / • 40 D P: IM MO( Olaf. `Y �^ VEINY WAWA Al WU • Prof'', ea P -1 e s, cc- c2 4. / �v Cy) C° L. astir, a Jl. 4lfl s 9j. Scale: 1`2= 50' APPROXIMATE LOCATIONS OF EXPLORATORY PITS Job No. 05 -2813 Fig. 1 11/10/1999 11:52 9709254671 H3 ARCHITECTS PAGE 03 I PERCOLATION TESTING We excavated three percolation pits (P -1 through P -3) to approximately 4 feet deep and one profile pit (Profile) to approximately 8.6 feet deep. Locations of our percolation and profile pits are shown on Figure 1. Graphic logs of the subsoils exposed in the pits are shown on Figure 2. Percolation tests were performed In excavations made into the bottom of the test pits. Results of our percolation tests are shown on Figures 6 through 11. Percolation test results indicate that a design percolation rate will be about 10 minutes per Inch. We recommend the percolation field be designed by an engineer qualified In septic field design such as Church and Associates, (303) 463 -9317. LIMITATIONS Our exploratory pits were spaced to obtain a reasonably accurate picture of subsurface conditions. Variations In the subsurface conditions not Indicated by our pits will occur. We should observe the completed foundation excavation to confirm the soils are as anticipated from our exploratory pits and suitable for support of the designed footings. Our report was based on conditions disclosed by our exploratory borings, engineering analysis and our experience. Criteria presented reflect our understanding of the proposed construction. We should be advised if the final design differs from our assumptions to permit us to re- evaluate our conclusions and recommendations. This investigation was conducted in a manner consistent with that level of care and skill ordinarily exercised by geotechnlcal engineers currently practicing under similar conditions In the locality of this project. No other warranty, express or implied, Is made. If we can be of further service In discussing the contents of this ERINSON ARCITICT$ LOT &PINYON PEAKS CTLrt OS•!Sp 10 • 11/10/1999 11:52 9709254671 H3 ARCHITECTS PAGE 04 E g report or In the analysis of the influence of the subsoil conditions on the design of the structure, please call. CJj ITHOMPSON, INC. `` • a JaJ aD. Kell •gg i f St eotech Ica! Engineer e ed b : i _ ....... pQe.' MECy..e - Jo` via L T .E. X 1 , 1 6..0 '' Br . h npvef27 2 i , 9 , A z . . ., • �; (3 c • • es se ? /ON 1. E - BRINSON ARCITECTS LOT 3,PINYON PEAKS tart oa 1843 11 11/10/1999 11:52 9709254671 H3 ARCHI ItWS SATURATION AND PREPARATION PERCOLATION TEST DATE: 9/21199 DATE: TIME AT START OF SATURATION: 11:3Oam WATER IN BORING AFTER 24 HOURS YES NO PERCOLATION TEST RESULTS DEPTH TO WATER HOLE DEPTH TIME AT TIME CHANGE PERCOLA- NUMBER (INCHES) START OF INTERVAL IN WATER 110/4 RATE INTERVAL (MINUTES) START OF END OF DEPTH (MIN /INCH) INTERVAL INTERVAL (INCHES) (IN, _ (INCHES) P -1 511.5 2:47 6 9.0 9.5 0.5 10 2:52 5 9.5 10.0 0.6 10 2:57 5 10.0 10.5 0.5 10 Job No. GS-2843 Fig. 7 11/10/1999 11:52 9709254671 143 ARCHITECTS rAGE Oe SATURATION AND PREPARATION PERCOLATION TEST DATE: 9/21/99 DATE: TIME AT START OF SATURATION: 11:30am WATER IN BORING AFTER 24 HOURS . YES NO PERCOLATION TEST RESULTS DEPTH TO WATER HOLE DEPTH TIME AT TIME CHANGE PERCOLA- NUMBER (INCHES) START OF INTERVAL - IN WATER TION RATE INTERVAL (MINUTES) START OF END OF DEPTH (MIN /INCH) INTERVAL INTERVAL (INCHES) „- (INCHES) (INCHES) P -2 55.0 11:25 - - 11:30 5 0 0.6 0.5 10 11:36 5 0.5 1.0 0.5 10 11:40 _ 5 1.0 2.0 1.0 5 11:45 6 2.0 2.75 0.76 7 11:50 6 2.75 3.5 0.75 7 - 11:55 5 3.5 4.0 0.6 10 12:00 6 4.0 4.5 0.5 10 12:05 6 4.5 5.0 0.5 10 12:10 5 5.0 5.5 0.5 10 12:15 5 5.5 6.0 0.6 10 - 12:20 5 J 6.0 7.0 1.0 5 12:47• 12:67 10 0 1.75 1.6 7 1:07 10 1.5 3.0 1.5 7 1:17 10 3.0 4.0 1.0 10 Y 1:27 10 4.0 4.5 0.5 20 J 1:37 4 10 4,5 5.5 1.0 10 1:47 _ 10 - 5.5 7.0 1.5 7 2:09 _ 2:19 10 0 0.5 0.5 20 2:29 10 0.5 2.0 0.5 20 2:39 10 2.0 3.0 1.0 10 2:49 10 3.0 4.0 1.0 10 • Hole refilled with water Job No. GS -2843 Fig. 8 11/10/1999 11:52 9709254671 1-13 ARCHITECTS T%avF I SATURATION AND PREPARATION PERCOLATION TEST DATE: 9 /21/99 DATE: TIME AT START OF SATURATION: 11:30am WATER IN BORING AFTER 24 HOURS YES _ NO PERCOLATION TEST RESULTS HOLE DEPTH TIME AT TIME DEPTH TO WATER NUMBER (INCHES) START OF INTERVAL CHANGE PERCOLA- INTERVAL (MINUTES) START OF END OF IN WATER N RATE (MI INTERVAL INTERVAL DEPTH (MIN /INCH) a (INCHES) ik (INCHES) (INCHES) P•7 60.0 11:26 5 - 11:31 6 3.0 4s 1.5 3 11:36 5 4.5 6.0 1.6 7 11:41 - 6 6.0 6.5 0.5 10 11:46 6 6.5 7.6 1.0 5 - 11:51 5 7.5 6.0 0.5 10 11:56 5 8.0 8.5 0.5 10 12:01 5 8.5 9.0 0.5 10 12:06 5 9.0 9.5 0.5 10 12:11 5 9.5 10.0 0.6 . 10 12:16 5 10 10.5 0.5 10 12:21 5 10.6 11.0 J 0.5 10 12:36 5 11.0 11.5 0.5 10 12:31 5 11.5 12.0 0.5 10 12:46' 12:56 10 0 4.5 4.5 2 1:06 10 4.6 6.5 2.0 2 1:16 10 6.6 7.5 1.0 10 1:26 10 7.6 9.0 1.5 7 1:36 10 8.0 10.0 - 1.0 10 1:46 10 10.0 11.00 1.0 10 1:56 10 11.0 12.0 1.0 2:07• 10 2:17 10 0 3.5 3.5 3 ' Hole refilled with water Job No. GS-2843 Flg. 10 11/10/1999 11:52 9709254671 H3 ARCHITECTS PAGE 11 SATURATIONAND PREPARATION • PERCOLATION TEST DATE: 9 /21/99 DATE: TIME AT START OF SATURATION: 11:301m WATER IN BORING AFTER 24 HOURS YES NO PERCOLATION TEST RESULTS HOLE DEPTH TIME AT TIME DEPTH TO WATER NUMBER (INCHES) START OF INTERVAL, IN PERCOLA- INTERVAL (MINUTES) START or END OF IN WATER TION RATE INTERVAL INTERVAL DEPTH (MIN /INCH) -_ -- - -- - -- - -- _ -- INCHES INCHES (INCHES) P.3 e0.0 2:27 "- - - - - -- — 10 S.S 5.0 1.5 7 2:37 Ma 6.0 7.0 2.0 lall 2:47 10 MIN 8.0 1.0 10 a 2:57 10 ell 9.0 1.0 ni � - - 3:01 10 9.0 10.0 1.0 _ 10 � 3:17 10 . 10.0 11.0 1.0 10 � � 11.0 12.0 1.0 10 1 11 ___ �. mam .... ........ .... .. .. n ., ... .....--no. ... ... .......... ... . ob No. GS -2843 Fig. 11 11/10/1999 11:52 9709254671 H3 ARCHITECTS PAGE 13 • 'I LEGEND: Clayey �roohs gravel cobbles ad vegetation boulders, loose, slightly moist, dark brown. l a Growl, slily with nobbles and boulders, occasional layers of clayey gravel, medium dense to dense, moist, Tight gray (GM. GC) Indloaf*. bag sample. ef Indicates baokhoe refusal. NOTES: 0 1. Exploratory pHs were excavated with a bookhoe on September 9, 1999. 5 2. No free ground water was found _ In our exploratory pits the day R of excavation. 10 3. These exploratory explanations. pit. are subject and conelu s contained ns In this report. LORATORY PITS Fig. 2