HomeMy WebLinkAbout5524 No. 5524
GA ?FIEF D COUNTY
BUILDING, SANITATION anJPLANNING DEPARTMENT
109 Stl Street Suitc 303
Glenwood Springs, Colorado 81601
(303) 945-8212
Job Address Highway 82, Carbondale
Nature of Work Building Permit
Use of Binding Single Family Dwelling w /Double Garage
Owner Darrell & Leslie Basham
Contractor Steve Fitzgerald
Amount of Permit $ 1. 632.67 Date May 18, 1995
Permit: 989.50
Plan : 643.17
Paid $643.17 5 -1 -95
S. Archuleta
clerk
BUILDING PERMIT APPLICATION
GARFIELD COUNTY, COLORADO
Applicant to complete numbered spaces only. PERMIT NO. SSA PARCEL /SCHED NO.
Jon ADDRESS
144te. miry / �n „ 6Ov h� L Q_--- 1 1 EGAL LOT NO. y BLOCK (�O —
SUBDIVISION
OESCR 1 A
2 OWNER C�^1rie U ' I +1
Sll(.St,L4 AI OnESS P C.„ 1311 Alrn PII - ?f wl<P11 ,r
p /, y
3 i7 `�.Z,� _3307) _3307) (:UN CONTRACTOR �.(.�, L , 1 t_5,.1 ADDRE /� 1({i L 4 11 1 LICENSE NO -
2
Ski. Y l 03,5, Llotis OA, f4 97 F. - 9�'�'�5��3 $ i�`o,v
4 ARCI IITECT OR DESIGNER t;I
S�, s...11l it ADDRESS 1541 404..1 A F Ca P11 94.16 4 LICENSE NO �� t if r
5 ENGINEER ( L (.
ADDRESS t. a !.
I'll LICENSE ILO.
- 3 5 F OF 001101HG 2L t00 SPOF - I Or 7
VJ ) A c rt3 IIEIGIIi NO OF FLOORS •
7 USE OF BUILDING .9r I1'1/4.415 Pei0 I
8 Cl Ass of WOnc ANEW ElADDITION IIAL I ERA I ION a REPAIR '1MOVE n REMOVE
LJ DESCRIBE Wank :. G. : • r1 Cc 2
W a , —
-10 GARAGE SINGLE IXt1 11` CAIWOI11 SIN01 0 (1011111 E
DRIVEWAY PERMIT ON SITE SEWAGE DISPOSAL F'ERMII
SITE PI AN
■
11 V � •
VALUATION of WORK. � C AD.I05 VAL3 a�
7
V PLAN CI IECI(FEE 6ci31 PERMIT FEE q so
SPECIAL CONDITIONS' ' le x 63,70 c
USE OF BUILDINGS NOW ON
�/ x 50 IDOL 19A1 ly EE NO OF BUILDINGS OIJ
Se 0 r �f� . ra 9 (0.3a....67/ �1 / PARCEL PARCEL
IOIAL FE` � ocCGRR 3 M'I CONST. TYPa /
NO LICE WAI ER SUPPLY 5718'9C-
DATE ISSUE()
SEPARATE PERM! IS ARE REOIJIRED FOR EL EC IRICAT. PLUMBING, /WA TING.
VENTILATING OR AIR COEIOr110NIN(' SPECIAL NBRDVAIs RFOIIIRFII
RECEIVED NOI!REQUIRED
TI ITS FERMI f BECOMES NUR AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS
NO COMMENCED WITI TIN 1110 DAYS. OR IF CDII5I ROC DON 012 WORK 15 SUSPENDED ZONING
OR ABANDONED 0011 A PERIOD OF 100 DAYS AT ANY TIME AFTER WORK IS
COMMENCED. I TEAL 7I I DEPT
I I TER EBY CERTIFY 11 TAT 111AVE READ AND EXAMINED 11115 APPI !CAT ION AND KNOW
1 NE SAME 10 BE TRUE ANO CORRECT ALL PROVISIONS 00 LAWS AND ORDINANCES PIKE DEP T.
GOVERNING 11115 TYPE OF WORK WILL BE COM9 100 Will l WI1E111E11 SPECIFIED
1 IEREIN OR T. THE GRANTING OF A PERMIT DOES NOT PRE5111ME 10 GIVE 5011. REPOR1
AO1110RI EY - o ••u R CAN I. 111E PROVISIONS OF ANY 0111E11 5I A1E OR
IOGAL W RE% A 11.. NSI RUCTION OR T11E PERFORMANCE 00
GONSTRUEII0r // SETBACKS -� (Dale) `S ` (f �
Sit - r onbaclor orulhollzu o v .� . -;. nndei shod noIIu 0 1))0 FLOOOIInZMD
• Pair / e _ . ' 5 is MALRIF 1109E
ding De anent Approvaldal o Planning Do par lmunl Approval /data
OE TER
PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND /OR THE AGENT OF THE CONTRACTOR OR OWNER TO
CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT
IN CONSIDERATION OF THE ISSUANCE OF THIS PERMIT TI IE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE
REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER
AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPLIED WNIl IN THE LOCATION, ERECTION, CONSTRUCTION AND USE OF
THE ABOVE DESCRIBED STRUCTURE. THE PERMIT MAY THEN BE REVOKED BY NOTICE FROM THE COUNTY AND THAT TIIEN AND THERE IT
SHALL BECOME NULL AND VOID.
THE ISSUANCE OF A PERMIT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM
THEREAFTER REQUIRING TIIE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING
OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THIS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS
JURISDICTION.
THE REVIEW OF THE SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN
ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABILITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPANCIES. THE
RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICALLY WITH THE ARCHITECT, DESIGNER,
BUILDER AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST.
Garform.003 I HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE 1INITIZThikt
1
•
GARFIELD COUNTY BUILDING AND PLANNING
MINIMUM APPLICATION REQUIREMENTS
for
SINGLE FAMILY DWELLING CONSTRUCTION
including
NEW CONSTRUCTION
ADDITIONS
ALTERATIONS
and
MOVED BUILDINGS
•
In order to understand the scope of the work intended under a hermit
application and expedite the issuance of a permit it is important that
complete information be provided. Adequate and complete information
will prevent delays in the plan review process. Reviewing a plan and the
discovery that required information has not been provided by the applicant
may result in the delay of the permit issuance and in proceeding with
building construction. The owner or contractor may be required to provide
this information before the plan review may proceed. This causes delays
because other plans that are in line for review May he given attention
before the new information may be reviewed after it has been provided to
the Building Department.
Please review this document to determine if you have enough information
to design your project and provide adequate information to facilitate a plan
review. If you do not, it may be helpful to obtain a book titled 'Dwelling
construction under the Uniform Building Code. This book is available to
you through this department at our cost. Also, please consider using a
design professional for assistance ht your design and a construction
professional for construction Of your project.
To provide for a more understandable plan in order to determine
compliance with the building, plumbing and mechanical codes, applicants
are requested to review the following check list: prior to and during design.
Applicants are required to indicate appropriately and to submit completed
check list at time. of application for a permit:
1
1. Is a site plan included that indicates the distance of the proposed
building or addition to property lines, other buildings, set back
easements and utility easements?
Yes No w Not necessary for this project (2)
2. Does the site plan include the location of the I.S.D.S. (Individual
Sewage Disposal System) and the distances to property lines, wells
(on subject properly and adjacent properties) , streams or water
courses? (Van* t, cfl Lacc3to q.j2rolc (a. OD 4-L_
Yes No _ X_ () Not necessary for this project 12)
3. Does the site plan indicate the location and direction of Ilhe County or
private road accessing the property?
Yes No (1) Not necessary for this project (2)
4. Do the plans include a foundation plan indicating the size, location
and spacing of all reinforcing steel in accordance with the uniform
building code or per stumped engineered design?
Yes _% _- No („ Not necessary for this project (2)
5. Do the plans Indicate the location and size of ventilation openings for
under floor crawl spaces and the clearances required between wood
and earth?
Yes No O , Nol necessary for this project (,)
6. Do the plans indicate the size an location of ventilation openings for
the attic, roof joist spaces and soffits?
Yes No „) Not necessary for this project (,)
7. Do the plans include design loads as required under the Uniform
Building code for roof snow loads, ( a minimum of 40 pounds per
square foot in Garfield County) floor loads and wind loads?
Yes No w Not necessary for this project (2)
8. Does the plan include a building section drawing indicating
foundation, wall, floor and roof construction?
Yes X No (t) Not necessary for this project ,z)
9. Does lire building section drawing include size and spacing of floor
joists, wall studs, ceiling joists, roof rafters or joists or trusses?
Yes No (q Not necessary for this project
10. Does the building section drawing or other detail Include the method
of positive connection of all columns and beaus?
2
Yes No (0 Not necessary for this project (z)
11. Does the plan Indicate the height of the building or proposed addition
from the highest point of the building or addition measured at mid
span between the ridge and the cave down to existing grade contours?
Yes _X__ No o) Not necessary for this project (2)
12. Does the plan include any stove or zero clearance fireplace planned
for installation including make and model and Colorado Phase II
certifications or phase 11 EPA certification?
Yes No (,) Not necessary for this project (2)
13. Does the plan include a masonry fireplace including a fireplace
section indicating design to comply with the Uniform Building Code
Chapter 37?
Yes No Nol necessary for this project _X__
14. Does the plan include a window schedule or other verification that -
egress /rescue windows from sleeping rooms and /or basements
comply wills the requirements of the Uniform Building Code?
Yes _ No ,u Not necessary for this project (2)
15 Does the plan include a window schedule or other verification that
windows provide natural light_ and ventilation for all habitable rooms?
Yes No (1) Not necessary for this project (2)
16. Do the plans indicate the location of glazing subject to human impact
•
• such as glass doors, glazing immediately adjacent to such doors;
glazing adjacent to any surface normally used as a walking surface;
sliding glass doors; fixed glass panels; shower doors and tub
enclosures and specify safety glazing for these areas?
Yes _ No (,) Not necessary for this project (2)
17. Is the location of all natural and liquid petroleum gas furnaces,
boilers and water heaters indicated on the plan?
Yes _x No , Not necessary for this project (2)
18. slave two (2) complete sets of constructions drawings been submitted
with the application?
Yes _x__ No n) Not necessary for this project (2)
19. Have you designed or had this plan designed while considering
building and other construction code requirements?
Yes _X__ No (3)
3
•
20. Does the plan accurately indicate what you intend to construct and
what will receive a final inspection by the Garfield Building
Department?
Yes No
__ No u,
2]. 1]o you understand that approval for design and /or construction
changes are required priPl_to the application of these changes?
Yes No rn
22. Do you understand that the Building Department will collect a "Plan
Review" fee from you at the time of application and that you will be
required to pay the "Permit Fee" as well as any "School Impact" or
"Septic system " fees required, at the time you pick up your building
permit?
Yes _X__ No
23. Are you aware that you are required to call for all inspections
required tinder the Uniform Building Code including approval on a
final inspection_prior to receiving a Certificate of Occupancy and
occupancy of the building?
Yes _ x No
24 . Are you aware that the person signing the Permit Application whether
the "Owner ", "Agent of the Owner ", "General Contractor", "Contractor"
or otherwise, signing the application is the party responsible for the
project complying with the Uniform Codes ".
Yes _X__ No
I hereby acknowledge that I have read, understand and answered these
questions accurately to the best of my ability.
signature
date
Phone: - 33oo _Ways);
y - 5-2 (evenings)
Project Name: Bg &n OaC,te,
•
----- ---- --
Project Address: l ._as___AA
4
Notes:
(1) If you hove answered 'No' on arty of these questions you may be required to provide this Information al
the request of the Ilullding Official prior to beginning the plan review process. IJelays In issuing the
permit are to be expected. Work limy not proceed wllhout the Issuance of the penult.
(2) If you have answered 'Not necessary for This protect" on any of the questions and 11 Is determined by
the Building Official that the Information Is necessary to review Ile application and pions to determine
minhmmn compliance with the adopted codes, please expect the following:
A. The application may be placed behind more recent applications for I permits In the
review p and amt reviewed until required lu(ornnlimn has been provided and the
application rotates again to first position for review.
.1). Delay in Issuance of the permit.
C. Delay lu proceeding with cunslrietlmn.
(3) If you answered "flu to this question the clrcuutstances described In the question could result In a "Slop
Work Order being Issued or a "CCrlllicale of Occupancy' not being Issued.
PerApp01'94 Effective May 1, 1994
•
N/
N
5