HomeMy WebLinkAbout5635 No. 5635
GARMELO L10UNTY
BUILDING, SANITAIIONand PLANNING DEPARTMENT
109 8th Street Suite 303
Glenwood Springs, Colorado 81601
(303) 945-8212
Job Address County Road 313, New Castle
Nature of Work Building Permit
Use of Building Cabin
Owner L.B. Montover
Contractor Owner
Amount of Permit$ 1,084.05 Date t • .• _
Permit: 657.00
Plan : 427.05
Paid $265.20
S. Archuleta
•-s
Clerk
BUILDING PERMIT APPLICATION
• GARFIELD COUNTY, COLORADO
Applicant to complete numbered spaces only. PERMIT NO. t,54.3 S PARCEUSCHEED NO- . J
JOB ADDRESS 3l If W ( ? r C / -O /i,-&° L
l / ry}1 -
1 LEGAL DESCR. LOT NO. BLOCK / 1 ..:115- _ 7 _ 9 — CENT R of frojW' 7
2 OWNER 1 , 8 /Z" I om ro ti P_ A ADDRESS r(ii /y (9 .710 - PH4t
g)� ;3 WK. PH.
3 CONTRACTOR Se L (" ADDRESS PH. LICENSE NO.
4 ARCHITECT OR DESIGNER 5 e L fr ADDRESS PH. LICENSE NO
5 ENGINEER \ ADDRESS PH. LICENSE NO.
6 S.F OF BUILDING R,(F X 3.2_ ( 7 6g
/ S.F OF LOT HEIGHT NO. OF FLOORS ,'
7 USE OF BUILDING C4 8 /hl
8 CLASS OF WORK: Ip1 uADDITION oALTERATION nREPAIR oMOVE °REMOVE
9 DESCRIBE WORK: f , 2 F _. ! - O/ W,,DA 77,7T 4 9.. 5 7TrUGfcR
10 GARAGE SINGLE DOUBLE CARPORT SINGLE DOUBLE
DRIVEWAY PERMIT ON SITE SEWAGE DISPOSAL PERMIT SITE PLAN 27,0_ -
11 VALUnnon Or WORK: $ Y /% Ge ADJUSTED VAL.$ /Oyfj j y G PLAN CHECK EE a e2 0 PERMIT FEE (, 7,
/ T
SPECIAL CONDITIONS: SCHOOL IMPACT FE _ NO. OF BUILDINGS ON USE OF BUILDINGS NOW ON
/�
�y,/ PARCEL PARCEL
TOTAL FEE a e 45' OCC. GR. I le- ) CONST. TYRE- 1' - I I
NOTICE WATERSUPPLY DATE PERMIT ISSUED 6, /_ '/ 3
SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING,
SPECLAL APPROVALS REQUIRED RECEIVED NOT REWIRED
VENTILATING OR AIR CONDITIONING.
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS ZONING
NOT COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED ` / G / �`
OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS
COMMENCED. HEALTH DEPT.
I HEREBY CERTIFY THAT 1 HAVE READ AND EXAMINED THIS APPLICATION AND KNOW
THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES FIRE DEPT.
GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED
HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE SOIL REPORT
AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF SETBACKS
CO RUCTION
At - > (Date) •
FLOOD HAZARD
Sign a Olt :r, Contractor or authorized anon in and understood notice above. -
.44f e: %VS' - 1/'�15' MANUF.HOME
— —
tuilding Dep'rtment Approve /date laming parlment Approval /date J
OTHER
AGREEMENT
PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND /OR THE AGENT OF THE CONTRACTOR OR OWNER TO
CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT
IN CONSIDERATION OF THE ISSUANCE OF THIS PERMIT THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE
REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.28201 CRS AS AMENDED. THE SIGNER FURTHER
AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPLIED WITH IN THE LOCATION, ERECTION, CONSTRUCTION AND USE OF
THE ABOVE DESCRIBED STRUCTURE. THE PERMIT MAY THEN BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT
SHALL BECOME NULL AND VOID.
THE ISSUANCE OF A PERMIT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM
THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING
OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THIS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS
JURISDICTION.
THE REVIEW OF THE SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN
ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABILITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPANCIES. THE
RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICALLY WITH THE ARCHITECT, DESIGNER,
BUILDER AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST. ��jj yy� ,
Garform,003 I HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE IINITIAU? //�) °
GARFIELD COUNTY BUILDING AND PLANNING
MINIMUM APPLICATION REQUIREMENTS
for
SINGLE FAMILY DWELLING CONSTRUCTION
including
NEW CONSTRUCTION
MANUFACTURED HOMES
ADDITIONS
ALTERATIONS
and
MOVED BUILDINGS
In order to understand the scope of the wort: intended under a permit
application and expedite the issuance of a permit it is important that
complete information be provided. Adequate and complete information will
prevent delays in the plan review process. Reviewing a plan and the
discovery that required information has not been provided by the applicant
may result in the delay of the permit issuance and in proceeding with
building construction. The owner or contractor may be required to provide
this information before the plan review may proceed. This causes delays
because other plans that are in line for review may be given attention before
the new information may be reviewed after it has been provided to the
Building Department.
Please review this document to determine if you have enough
information to design your project and provide adequate information to
facilitate a plan review. If you do not, it may be helpful to obtain a book
titled "Dwelling construction under the Uniform Building Code. This
book is available to you through this department at our cost. Also,
please consider using a design professional for assistance in your
design and a construction professional for construction of your project.
To provide for a more understandable plan in order to determine
compliance with the building, plumbing and mechanical codes, applicants
are requested to review the following check list prior to and during design.
Applicants are required to indicate appropriately and to submit
completed check list at time of application for a permit:
1
1. Is a site plan included that indicates the distance of the proposed
building or addition to property lines, other buildings, set back
easements and utility easements?
Yes .. -- No ( i ) Not necessary for this project (z)
2. Does the site plan include the location of the I.S.D.S. (Individual
Sewage Disposal System) and the distances to property lines, wells (on
subject property and adjacent properties) , streams or water courses?
Yes !__ No (i) Not necessary for this project (2)
3. Does the site plan indicate the location and direction of the County or
private road accessing the property?
Yes __ No (i) Not necessary for this project (2)
4. Do the plans include a foundation plan indicating the size, location
and spacing of all reinforcing steel in accordance with the uniform
building code or per stamped engineered design?
Yes (,-"' No (,) Not necessary for this project (2)
5. Do the plans indicate the location and size of ventilation openings for
under floor crawl spaces and the clearances required between wood
and earth?
Yes ✓ No (1) Not necessary for this project 12)
6. Do the plans indicate the size an location of ventilation openings for
the attic, roof joist spaces and soffits?
Yes _ _ ------ Not necessary for this project (2
7. Do the plans include design Loads as required under the Uniform
Building code for roof snow loads, (a minimum of 40 pounds per
square foot in Garfield County) floor loads and wind Loads?
Yes ✓ No (1) Not necessary for this project (p)
8. Does the plan include a building section drawing indicating
foundation, wall, floor and roof construction?
Yes No (1) Not necessary for this project a,
9. Does the building section drawing include size and spacing of floor
joists, wall studs, ceiling joists, roof rafters or joists or trusses?
Yes - No m Not necessary for this project (2)
2
•
10. Does the building section drawing or other detail include the method
of positive connection of all columns and beams?
Yes _ tv No (n Not necessary for this project (2)
11. Does the plan indicate the height of the building or proposed addition
from the highest point of the building or addition measured at mid
span between the ridge and the eave down to existing grade contours?
Yes _ri_ No O) Not necessary for this project (2)
12. Does the plan include any stove or zero clearance fireplace planned
for installation including make and model and Colorado Phase II
certifications or phase II EPA certification? VLO wao,ebyr rooiggp
Yes No O) Not necessary for this project (2)
13. Does the plan include a masonry fireplace including a fireplace
section indicating design to comply with the Uniform Building Code
Chapter 37?
Yes No m Not necessary for this project (2)
14. Does the plan include a window schedule or other verification that
egress /rescue windows from sleeping rooms and /or basements
comply with the requirements of the Uniform Building Code?
Yes ✓' No n, Not necessary for this project (2)
1 5. Does the plan include a window schedule or other verification that
windows provide natural light and ventilation for all habitable rooms?
Yes t" No m Not necessary for this project ( )
16. Do the plans indicate the location of glazing subject to human impact
such as glass doors, glazing immediately adjacent to such doors;
glazing adjacent to any surface normally used as a walking surface;
sliding glass doors; fixed glass panels; shower doors and tub
enclosures and specify safety glazing for these areas?
Yes Not necessary for this project (2)
17. Is the location of all natural and liquid petroleum gas furnaces, boilers
and water heaters indicated on the plan?
Yes No m Not necessary for this project (2)
18 Do you understand that if you belong to a homeowners association, it
is your responsibility to obtain written permission from that
association, if required by that association, prior to submitting an
application for a building permit?
Yes No (u Not necessary for this project ✓'�
3
•
19. Have two (2) complete sets of constructions drawings been submitted
with the application?
Yes No o, Not necessary for this project (1)
20. Is this an application for the placement of a manufactured home?
Yes No
If yes, have you specified the size of the unit; live roof load;
foundation design; method of anchoring?
Yes No tz (,) Not necessary for this project C21
21. Have you designed or had this plan designed while considering
building and other construction code requirements?
Yes V Mtn r„
22. Does the plan accurately indicate what you intend to construct and
what will receive a final inspection by the Garfield Building
Department?
Yes ✓ No c„
23. Do you understand that approval for design and /or construction
changes are required prior to the application of these changes?
Yes .- No (3)
24. Do you understand that the 'Building Department will collect a "Plan
Review" fee from you at the time of application and that you will be
required to pay the "Permit: Fee" as well as any "School impact" or
"Septic system " fees required, at the time you pick up your building
permit?
Yes ✓ No („
2S. Are you aware that you are required to call for all inspections required
under the Uniform Building Code including approval on a final
inspection_ prior to receiving a Certificate of Occupancy and
occupancy of the building?
Yes _17 No
26. Are you aware that the person signing the Permit Application whether
the "Owner ", "Agent of the Owner ", "General Contractor ", "Contractor"
or otherwise, signing the application is the party responsible for the
project complying with the Uniform Codes ".
Yes f" No s ,
(CONTINUED ON NEXT PAGE)
4
I hereby acknowledge that I have read, understand and answered these
questions accurately to the best of my ability.
• // . ,., e2J 3 / � / 99J
signature ate
Phone: S76 _4633 (clays); (evenings)
Project Name:
Project Address:
Notes:
(1) If you have answered "No" on any of these questions you may be required to provide this information at
the request of the Building Official prior to beginning the plan review process. Delays in issuing the
permit are to be expected. Work may not proceed without the issuance of the permit.
(2) If you have answered "Not necessary for this project" on any of the questions and it is determined by the
Building Official that the information is necessary to review the application and plans to determine
minimum compliance with the adopted codes, please expect the following:
.4. The application may be placed behind more recent applications for building permits in the review
process and not reviewed until required inforrnation has been provided and the application
rotates again to first position for review.
B. Delay in issuance of the permit.
C. Delay in proceeding with construction.
(3) If you answered "No" to this question the circumslances described in the question could result in a "Stop
Work Order" being issued or a "Certificate of Occupancy" not being issued.
PerAppO1.95 Effective June 1, 1995
•
5