Loading...
HomeMy WebLinkAbout5757 • 10. Does the building section drawing or other detail include the method of positive connection of all columns and beams? Yes __X_ No ( i) Not necessary for this project (2) 11. Does the plan indicate the height of the building or proposed addition from the highest point of the building or addition measured at mid span between the ridge and the eave down to existing grade contours? Yes _X_ No (I) Not necessary for this project (2) 12. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase II certifications or phase II EPA certification? ^ Yes _X__ No (,) Not necessary for this project (2) 13. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the Uniform Building Code Chapter 37? Yes _X _ No ( I ) Not necessary for this project (2) 14. Does the plan include a window schedule or other verification that egress /rescue windows from sleeping rooms and /or basements comply with the requirements of the Uniform Building Code? Yes 4_ No (n Not necessary for this project ( 15. Does the plan include a window schedule or other verification that windows provide natural light and ventilation for all habitable rooms? Yes _X__ No ()) Not necessary for this project (2) 16. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub encl ures and specify safety glazing for these areas? Yes _ No (1) Not necessary for this project (2) 17. Is the location of all natural and liquid petroleum gas furnaces, boilers and v ter heaters indicated on the plan? • Yes __ No 0) Not necessary for this project (2) 18 Do you understand that if you belong to a homeowners association, it is your responsibility to obtain written permission from that association, if required by that association, prior to submitting an application for a building permit? Yes _ ___ No n) Not necessary for this project ( 2 ) 3